← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Waterview Condominium
42 BROADWAY · BIN 3347208
💬 Discuss this project
2000Year Built
6Stories
RMBuilding Class
C4-3Zoning
50,828 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized18 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: F & M SCHAEFER BREWING CO · 14,996 sf lot · 3.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE WATERVIEW CONDOMINIUM II603/22/2026
MGI CONSTRUCTION203/22/2026
ALL CARE MANAGEMENT103/22/2026
GREEN LINK CONSTRUCTION403/22/2026
WYTHE ROSE GARDENS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHAQ401/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALLSTATE EXPEDITERS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.H 1 CONSTRUCTION CORPGeneral Contractor303/21/2026
AMOK INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616301/08/2024
Building Lifecycle
All (90)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)Objection (10)Special Inspection (9)
08/12/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, open)
B
02/02/2026
Violation issued (FDNY_NOV, closed)
11/21/2025
Violation issued (HPD, closed)
I
06/26/2025
Violation issued (FDNY_NOV, closed)
06/26/2025
Violation issued (FDNY_NOV, closed)
05/21/2024
Signed off — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-I1
05/13/2024
Signed off — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-S1
05/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2024
Violation issued (FDNY_NOV, closed)
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/12/2024
Special inspection requirement — Final
FAHAD FATEH
01/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/08/2024
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-P2
01/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/05/2024
Special inspection requirement — Final
FAHAD FATEH
01/03/2024
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-P1
10/11/2023
Permit issued — Plumbing
B00930262-S1-PL
09/26/2023
Permit issued — General Construction
B00930262-I1-GC
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Scope
09/19/2023
Objection raised — Fire_Protection
09/19/2023
Objection raised — Fire_Protection
09/19/2023
Objection raised — Fire_Protection
09/19/2023
Objection raised — Structural
09/14/2023
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-S1
09/13/2023
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-I1
11/22/2022
Violation issued (HPD, closed)
C
11/22/2022
Violation issued (HPD, closed)
C
11/22/2022
Violation issued (HPD, closed)
A
11/22/2022
Violation issued (HPD, closed)
A
11/22/2022
Violation issued (HPD, closed)
C
11/22/2022
Violation issued (HPD, closed)
B
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
B
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
B
06/24/2022
Violation issued (HPD, closed)
C
05/06/2021
Violation issued (ECB, open)
Boilers
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMOK INC10/11/2023
DOB NOWGeneral ConstructionSigned-offI.H 1 CONSTRUCTION CORP09/26/2023
BISOTISSUEDZENCO GROUP INC06/14/2012
BISBLISSUEDBRADFORD MECH. CONTR INC02/01/2002
BISPLISSUEDBRADFORD MECH. CONTR INC02/01/2002
BISMHISSUEDALISA CONSTRUCTION CO INC01/17/2002
BISPLISSUEDATLANTIC WATER & SEWER INC.07/17/2001
BISBLISSUEDBRADFORD MECH. CONTR INC03/19/2001
BIS—ISSUEDGREEN LINK CONSTRUCTION, INC.12/06/2000
BISEQISSUEDGREEN LINK CONSTRUCTION, INC12/06/2000
BISSPISSUEDCAPITOL FIRE SPKL CO,INC06/19/2000
BIS—ISSUEDGREEN LINK CONSTRUCTION, INC.12/20/1999
BISEQISSUEDGREEN LINK CONSTRUCTION, INC12/09/1999
BISPLISSUEDBRADFORD MECH. CONTR INC12/01/1999
BISOTISSUEDGREEN LINK CONSTRUCTION, INC.10/22/1999
BISEQISSUEDGREEN LINK CONSTRUCTION, INC.08/11/1999
BISEQISSUEDGREEN LINK CONSTRUCTION, INC08/11/1999
BIS—ISSUEDGREEN LINK CONSTRUCTION, INC.08/11/1999
1 project · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/12/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/12/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/12/2024FinalFAHAD FATEHprogress
01/12/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/05/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/05/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/05/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/05/2024FinalFAHAD FATEHprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00930262-I1Request digital key ↗
08/26/2026B00930262-P1Request digital key ↗
08/26/2026B00930262-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/03/2012320451685Open ↗
03/26/2012320451685Open ↗
▸BISWORK PERMIT APPLICATION1
06/15/2012320451685Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00930262-P1Open ↗
08/26/2026B00930262-S1Open ↗
08/26/2026B00930262-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B00930262-P2Open ↗
08/24/2026B00930262-I1Open ↗
08/23/2026B00930262-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00930262-I1Open ↗
08/24/2026B00930262-P2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/26/2012320451685Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/26/2012320451685Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/26/2012320451685Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00930262-S1Open ↗
08/26/2026B00930262-P2Open ↗
08/26/2026B00930262-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00930262-I1Open ↗
08/13/2026B00930262-P2Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/26/2012320451685Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B00930262-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
03/26/2012320451685Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/15/2012320451685Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/21/2012320451685Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/15/2012320451685Open ↗
▸BISCOST AFFIDAVIT1
03/26/2012320451685Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/26/2012320451685Open ↗