1930Year Built
1Stories
E1Building Class
M1-1Zoning
12,500 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
General warehouse · Owner of record: KAM KEE REALTY, LLC · 12,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof2p · 1 filing · 11 docs
Floor 32p · 1 filing · 11 docs
Floor 22p · 1 filing · 11 docs
Floor 13p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAM KEE REALTY103/22/2026
DIVISION BUILDERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS112/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLS DESIGNS103/21/2026
Building Lifecycle
All (119)Filed (1)Violation (24)Objection (78)Special Inspection (16)
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
09/10/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Accessibility
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Fire_Protection
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Accessibility
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Zoning
08/13/2026
Objection raised — Fire_Protection
08/13/2026
Objection raised — Accessibility
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Accessibility
08/13/2026
Objection raised — Zoning
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Fire_Protection
08/13/2026
Objection raised — Fire_Protection
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Zoning
08/13/2026
Objection raised — Fire_Protection
07/22/2026
Objection resolved — Resolved
07/07/2026
Special inspection requirement — Air barrier — testing
07/07/2026
Special inspection requirement — Metering
06/17/2026
Special inspection requirement — Electrical motors and elevators
Latest 60 of 119 events.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/07/2026Air barrier — testing —energy_progress
07/07/2026Metering—energy_progress
06/17/2026Electrical motors and elevators—energy_progress
10/31/2025Fenestration and door U-factor and product ratings—energy_progress
10/31/2025Interior lighting power—energy_progress
10/31/2025Air barrier - visual inspection—energy_progress
10/31/2025Fenestration areas—energy_progress
10/31/2025Lighting controls—energy_progress
10/31/2025Insulation placement and R values—energy_progress
10/31/2025Exterior lighting power—energy_progress
10/31/2025Maintenance information—energy_progress
10/31/2025Protection of exposed foundation insulation—energy_progress
10/31/2025Structural Stability – Alterations of existing buildings—special
10/31/2025Fenestration air leakage—energy_progress
10/31/2025Excavations - Sheeting, Shoring, and Bracing—special
10/31/2025Fire-Resistant Penetrations and Joints—special
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026B01312011-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026B01312011-I1Open ↗
08/13/2026B01312011-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/19/2026B01312011-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/19/2026B01312011-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01312011-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/19/2026B01312011-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01312011-S3Open ↗
08/19/2026B01312011-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/19/2026B01312011-S3Open ↗
08/13/2026B01312011-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026B01312011-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/19/2026B01312011-I1Open ↗