← Back
Walk-up cooperative
42 KING STREET
MANHATTAN · BIN 1008088
💬 Discuss this project
1840Year Built
3Stories
C6Building Class
R6Zoning
4,836 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: 42 KING ST INC · 2,010 sf lot · 2.41 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 2 filings · 20 docs
Basement5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
42 KING STREET2003/22/2026
42 KING303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAGO ARCHITECTURE, PLLC102/17/2025
R.A. STINSON & ASSOCIATES, INC.705/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AHA INTERIORS CORPGeneral Contractor603/21/2026
DELTA-SIGMA MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795102/17/2025
MILROSE CONSULTANTS LLC2003211/01/2022
Building Lifecycle
All (44)Filed (8)Permit Issued (3)Signed Off (3)Violation (12)Inspection (3)Special Inspection (15)
04/14/2026
Violation issued (ECB, open)
Construction
06/04/2025
Violation issued (HPD, closed)
A
05/05/2025
Signed off — Alteration
INSTALLATION OF NEW STAIR FROM BASEMENT TO FIRST FLOOR IN EXISTING REAR YARD. REPLACE EXISTING RAILING AT FIRST FLOOR REAR TERRACE WITH NEW RAILING.
M01167622-I1
04/14/2025
Violation issued (ECB, open)
Construction
04/01/2025
Permit issued — General Construction
M01167622-I1-GC-CX
02/17/2025
Filed — Alteration
INSTALLATION OF NEW STAIR FROM BASEMENT TO FIRST FLOOR IN EXISTING REAR YARD. REPLACE EXISTING RAILING AT FIRST FLOOR REAR TERRACE WITH NEW RAILING.
M01167622-I1
02/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL KARANTINIDIS, P.E.
02/14/2025
Special inspection requirement — Preliminary
MICHAEL KARANTINIDIS, P.E.
02/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
01/15/2025
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
01/15/2025
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL KARANTINIDIS, P.E.
01/15/2025
Special inspection requirement — Structural Steel - Details
MICHAEL KARANTINIDIS, P.E.
01/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL KARANTINIDIS, P.E.
01/15/2025
Special inspection requirement — Structural Steel - Welding
MICHAEL KARANTINIDIS, P.E.
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
06/22/2023
Signed off — Alteration
Combination of units basement and 1st floor in accordance with TPPN # 3/97 modification to existing. Plumbing fixtures as per plans filed herewith. PAA2 Shows existing gas valve location and shows new proposed gas riser branch to kitchen.
M00507097-I1
06/15/2023
Signed off — Alteration
Combination of units basement and apartment 1 in accordance with TPPN # 3/97. Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
M00449709-I1
05/15/2023
Filed — Alteration
Combination of units basement and 1st floor in accordance with TPPN # 3/97 modification to existing. Plumbing fixtures as per plans filed herewith. PAA2 Shows existing gas valve location and shows new proposed gas riser branch to kitchen.
M00507097-P4
04/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/15/2023
Violation issued (HPD, closed)
A
01/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/30/2022
Filed — Alteration
Combination of units basement and 1st floor in accordance with TPPN # 3/97 modification to existing. Plumbing fixtures as per plans filed herewith. PAA2 Shows existing gas valve location and shows new proposed gas riser branch to kitchen.
M00507097-P2
12/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2022
Special inspection requirement — Final
Robert Stinson
11/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
11/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
11/02/2022
Permit issued — Plumbing
M00507097-I1-PL
11/02/2022
Violation issued (HPD, closed)
I
11/01/2022
Filed — Alteration
Combination of units basement and apartment 1 in accordance with TPPN # 3/97. Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
M00449709-P2
11/01/2022
Filed — Alteration
Combination of units basement and 1st floor in accordance with TPPN # 3/97 modification to existing. Plumbing fixtures as per plans filed herewith. PAA2 Shows existing gas valve location and shows new proposed gas riser branch to kitchen.
M00507097-P1
09/23/2022
Permit issued — General Construction
M00449709-I1-GC
09/21/2022
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
09/21/2022
Special inspection requirement — Final
Robert Stinson
09/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
05/27/2022
Filed — Alteration
Combination of units basement and apartment 1 in accordance with TPPN # 3/97. Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
M00449709-P1
02/15/2022
Violation issued (HPD, closed)
A
05/13/2021
Filed — Alteration
Combination of units basement and 1st floor in accordance with TPPN # 3/97 modification to existing. Plumbing fixtures as per plans filed herewith. PAA2 Shows existing gas valve location and shows new proposed gas riser branch to kitchen.
M00507097-I1
05/13/2021
Filed — Alteration
Combination of units basement and apartment 1 in accordance with TPPN # 3/97. Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
M00449709-I1
04/01/2021
Violation issued (HPD, closed)
A
10/09/2018
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAHA INTERIORS CORP04/01/2025
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP11/02/2022
DOB NOWGeneral ConstructionSigned-offAHA INTERIORS CORP09/23/2022
BISEQISSUEDRJ HIGH SKY LLC04/18/2017
BISPLISSUEDPLBG P & H INC04/18/2017
BISOTISSUEDE & E CONTRACTING NY CORP04/10/2017
BISPLISSUEDD.C. PLUMBING INC07/15/2014
BISOTISSUEDJ. COSTA CONSTRUCTION COR06/13/2014
BISOTISSUEDRIVERSIDE BUILDERS INC09/25/2013
BISOTISSUEDRIVERSIDE BUILDERS INC01/13/2012
BISPLISSUEDM & A PLUMBING, INC02/28/2005
BISPLISSUEDM A J PLUMB INC.11/05/2004
BISEQRE-ISSUEDCLGATE SCAFF.04/07/2004
BISEQISSUEDCOLGATE SCAFFOLDING & EQPT CORP04/07/2004
BISOTISSUEDCERTIFIED OF N.Y. INC10/29/2003
BISEQISSUEDCLGATE SCAFF.10/28/2003
BISEQISSUEDCOLGATE SCAFFOLDING & EQPT CORP10/23/2003
BISOTISSUEDCERTIFIED OF N.Y. INC10/07/2003
BISOTISSUEDCERTIFIED OF N.Y. INC05/30/2003
BISOTISSUEDCERTIFIED OF N.Y. INC04/02/2002
1 project · most recent 10/09/2019
General Wiring
FiledStatusContractorScope
10/09/2019CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/14/2025Structural Stability – Alterations of existing buildingsMICHAEL KARANTINIDIS, P.E.special
02/14/2025PreliminaryMICHAEL KARANTINIDIS, P.E.progress
02/14/2025Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
02/14/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
01/15/2025FinalMICHAEL KARANTINIDIS, P.E.progress
01/15/2025Structural Cold-Formed SteelMICHAEL KARANTINIDIS, P.E.special
01/15/2025Structural Steel - DetailsMICHAEL KARANTINIDIS, P.E.special
01/15/2025Structural Steel - High Strength BoltingMICHAEL KARANTINIDIS, P.E.special
01/15/2025Structural Steel - WeldingMICHAEL KARANTINIDIS, P.E.special
11/08/2022FinalRobert Stinsonprogress
11/08/2022Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/08/2022Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
09/21/2022Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
09/21/2022FinalRobert Stinsonprogress
09/21/2022Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
09/03/2026M00507097-I1Request digital key ↗
09/03/2026M00507097-P4Request digital key ↗
09/03/2026M00507097-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/02/2026M00449709-P1Request digital key ↗
09/02/2026M00449709-I1Request digital key ↗
09/02/2026M00449709-P2Request digital key ↗
▸Applications & Permits20
▸DOB NOWLPC Approval/Permit8
09/02/2026M00449709-I1Open ↗
09/02/2026M00449709-P2Open ↗
09/02/2026M00449709-P1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION7
04/26/2017123061809Open ↗
04/17/2017140629434Open ↗
04/12/2017123061809Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
04/17/2017140629434Open ↗
04/03/2017123061809Open ↗
12/12/2013121631109Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/01/2018123061809Open ↗
01/25/2018121631109Open ↗
04/03/2017123061809Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026M00449709-I1Open ↗
08/25/2026M01167622-I1Open ↗
08/25/2026M01167622-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026M00449709-I1Open ↗
09/02/2026M00449709-P2Open ↗
09/02/2026M00449709-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/26/2026M00449709-I1Open ↗
08/26/2026M00449709-I1Open ↗
08/25/2026M01167622-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/17/2017140629434Open ↗
04/03/2017123061809Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/03/2017123061809Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2017140629434Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/17/2017140629434Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
10/30/2014121631109Open ↗
08/11/2014121631109Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/03/2017123061809Open ↗
▸BISSCHEDULE B - PLUMBING1
12/12/2013121631109Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026M00449709-I1Open ↗
09/02/2026M00449709-P2Open ↗
09/02/2026M00449709-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/21/2011120897440Open ↗
11/21/2011120897440Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/10/2014121631109Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/17/2013121708312Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/03/2017123061809Open ↗
06/25/2014121631109Open ↗
04/03/2014121708312Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/01/2018123061809Open ↗
01/25/2018121631109Open ↗
04/03/2014121708312Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/21/2011120897440Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/17/2017140629434Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/25/2018121631109Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLANDMARKS APPROVAL6
03/01/2018123061809Open ↗
01/25/2018121631109Open ↗
04/17/2017140629434Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/01/2018123061809Open ↗
01/25/2018121631109Open ↗
04/03/2014121708312Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/17/2013121708312Open ↗
11/21/2011120897440Open ↗
▸BISLANDMARKS SIGNOFF1
01/25/2018121631109Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
03/01/2018123061809Open ↗
01/25/2018121631109Open ↗
04/03/2017123061809Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
04/03/2017123061809Open ↗
12/12/2013121631109Open ↗
07/17/2013121708312Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
03/01/2018123061809Open ↗
01/25/2018121631109Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/17/2017140629434Open ↗