← Back
BuildNYC
Walk-up cooperative
42 KING STREET
MANHATTAN · BIN 1008088
💬 Discuss this project
1840Year Built
3Stories
C6Building Class
R6Zoning
4,836 sfGross Floor Area
4Units
Rent Stabilized2 Active Violations 1 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: 42 King St · 2,010 sf lot · 2.41 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 19p · 2 filings · 20 docs
Basement5p · 2 filings · 20 docs
Sub-Basement7p · 2 filings · 20 docs
Site & exteriorRear yard stair installation2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
42 King2303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mago Architecture102/17/2025
R.A. Stinson & Associates705/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aha InteriorsGeneral Contractor603/21/2026
Delta-Sigma MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica1795102/17/2025
Milrose Consultants2003211/01/2022
Building Lifecycle
04/14/2026
No access. No certificate of correction on file for violation #39144786R issued 4/14/2025 for welding work performed by contractors not indicated…
ECB violation · open
08/25/2025
Co-op apartment 1 sold for $4,900,500
Work was filed on this apartment 4.3 years before the sale
06/04/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
05/05/2025
Signed off — Alteration
INSTALLATION OF NEW STAIR FROM BASEMENT TO FIRST FLOOR IN EXISTING REAR YARD. REPLACE EXISTING RAILING AT FIRST FLOOR REAR TERRACE WITH NEW RAILING.
M01167622-I1
04/14/2025
Upon inspection observed at exp.3/rear yard, 2-men currently working to install metal stringers for stairs leading from 1FLR. To bsmt./rear yard…
ECB violation · open
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAha Interiors04/01/2025
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical11/02/2022
DOB NOWGeneral ConstructionSigned-offAha Interiors09/23/2022
BISEQISSUEDRJ High SKY04/18/2017
BISPLISSUEDPlumbing P & H04/18/2017
BISOTISSUEDE & E Contracting NY04/10/2017
BISPLISSUEDD.C. Plumbing07/15/2014
BISOTISSUEDJ. Costa Construction06/13/2014
BISOTISSUEDRiverside Builders09/25/2013
BISOTISSUEDRiverside Builders01/13/2012
BISPLISSUEDM & A Plumbing02/28/2005
BISPLISSUEDMaj Plumbing11/05/2004
BISEQRE-ISSUEDClgate Scaff04/07/2004
BISEQISSUEDColgate Scaffolding & Eqpt04/07/2004
BISOTISSUEDCertified of N.Y10/29/2003
BISEQISSUEDClgate Scaff10/28/2003
BISEQISSUEDColgate Scaffolding & Eqpt10/23/2003
BISOTISSUEDCertified of N.Y10/07/2003
BISOTISSUEDCertified of N.Y05/30/2003
BISOTISSUEDCertified of N.Y04/02/2002
1 project · most recent 10/09/2019
General Wiring
FiledStatusContractorScope
10/09/2019CompleteJoseph Weinstein ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/14/2025Structural Stability – Alterations of existing buildingsMICHAEL KARANTINIDIS, P.E.special
02/14/2025PreliminaryMICHAEL KARANTINIDIS, P.E.progress
02/14/2025Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
02/14/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
01/15/2025FinalMICHAEL KARANTINIDIS, P.E.progress
01/15/2025Structural Cold-Formed SteelMICHAEL KARANTINIDIS, P.E.special
01/15/2025Structural Steel - DetailsMICHAEL KARANTINIDIS, P.E.special
01/15/2025Structural Steel - High Strength BoltingMICHAEL KARANTINIDIS, P.E.special
01/15/2025Structural Steel - WeldingMICHAEL KARANTINIDIS, P.E.special
11/08/2022FinalRobert Stinsonprogress
11/08/2022Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/08/2022Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
09/21/2022Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
09/21/2022FinalRobert Stinsonprogress
09/21/2022Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
116 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account