← Back
Building

42 Main Street, Brooklyn

42 Main Street, Brooklyn: 10 DOB NOW job filings; 11 work permits (1 open, 10 signed off); 1 open violation. Most recent permit issued 2025-11-14.

Building facts

Borough
Brooklyn
Year built
2002
Stories
10
Dwelling units
23
Building floor area (sq ft)
26,247
Zoning
M1-2/R8A
Building class
RM

Design team

Design firmDisciplineJobs at this building
Bergmann AssociatesMEP3
Exo Industries Corp.1
James Chai Architect, P.C.Architecture1
Mje Professional ServicesMEP1
Rand Engineering & ArchitectureMEP1
Shaaban Engineering, LLCGeneral Engineering1

Contractors and firms on permits

BusinessJobs at this building
Production Contract. LLC2
Exo Industries Corp.2
Capitol Fire Sprinkler Co.1
National Maintenance, Inc.1
Schumacher & Farley P&H C1
Express Plbg Sewr And Wtr1
Central Construction Mgmt1

Work permits

IssuedWork typeStatusBusinessDescription
2025-11-14Suspended ScaffoldPermit IssuedCentral Construction MgmtINSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
2024-10-09General ConstructionSigned-offExo Industries Corp.9th Cycle Facade Repair program. No change to use, egress or occupancy.
2024-10-02General ConstructionSigned-offExo Industries Corp.9th Cycle Facade Repair program. No change to use, egress or occupancy.
2024-09-25Suspended ScaffoldSigned-offFACADE RESTORATION, INSPECTIONS
2024-09-09Sidewalk ShedSigned-offExo Industries Corp.PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.…
2023-08-02SignSigned-offNational Maintenance, Inc.ERECT ACCESSORY BUSINESS WALL SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2023-06-27PlumbingSigned-offSchumacher & Farley P&H CModification to plumbing fixtures and related piping as shown on drawings.
2023-06-22SprinklersSigned-offCapitol Fire Sprinkler Co.Modification to existing sprinkler system at Starbucks Coffee Shop.
2023-06-14General ConstructionSigned-offProduction Contract. LLCProposed renovation to existing Starbucks Coffee Shop. Plumbing, mechanical, sprinkler, and electrical filed under separate applications.
2023-06-14Mechanical SystemsSigned-offProduction Contract. LLCModification to existing mechanical system ductwork.
2020-07-21PlumbingSigned-offExpress Plbg Sewr And Wtrfile PL work in conjunction with Alt2 job# 340721801, no change in use, egress or occupancy

Job filings

JobFiledTypeStatus
B013162042025-11-10AlterationPermit Entire
B010335642025-06-13AlterationApproved
B011033892025-01-21AlterationApproved
B011032242024-09-07AlterationLOC Issued
B008951682023-08-01AlterationLOC Issued
B008742432023-05-26AlterationLOC Issued
B008742502023-05-25AlterationPermit Entire
B008742362023-05-25AlterationPermit Entire
B008742122023-05-25AlterationLOC Issued
B003325362020-09-02AlterationApproved

Open violations

IssuedSourceTypeDescription
2017-01-03dobV-DOB VIOLATION - ACTIVEVIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.