← Back
Two family converted from one family
42 MONROE STREET
BROOKLYN · BIN 3057074
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,300 sfGross Floor Area
2Units
Two family converted from one family · 1,717 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof10p · 7 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar14p · 6 filings · 20 docs
Basement4p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2021$1.7M—Private party → Private party$750/sf building
07/26/2019$1.2M—Private party → Private party$533/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAAD606/25/2026
KTA ENGINEERING711/27/2023
OVERHEAD ARCHITECTURE DPC410/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HATCHET WORKS CORPGeneral Contractor1007/08/2026
FLINT MECHANICAL CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727606/25/2026
INTEGRITY CONSULTING SERV666711/27/2023
DEVIN MILLS ARCHITECT7906210/17/2023
Building Lifecycle
All (113)Filed (17)Permit Issued (8)Signed Off (6)Inspection (2)Objection (50)Special Inspection (30)
07/09/2026
Signed off — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-S1
07/09/2026
Signed off — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-S2
07/02/2026
Signed off — Alteration
B00699385-I1
06/26/2026
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM.
B00699429-I1
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — Shutoff dampers
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — Final
NICHOLAS AZADIAN
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
06/25/2026
Filed — Alteration
B00699385-P1
06/25/2026
Signed off — Alteration
B00652191-I1
07/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — Shutoff dampers
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — Final
NICHOLAS AZADIAN
07/25/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
05/08/2024
Permit issued — Mechanical Systems
B00699385-I1-MS
03/21/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
03/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Concrete - Cast-In-Place
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Footing and Foundation
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Gregory Pillori
03/19/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Subgrade Inspections
ALEKSANDR LEVIN
03/19/2024
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
02/01/2024
Permit issued — Plumbing
B00699429-I1-PL
12/07/2023
Signed off — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-I1
11/30/2023
Objection raised — Scope
11/30/2023
Objection raised — Scope
11/27/2023
Filed — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-P3
11/27/2023
Filed — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-P4
11/15/2023
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
11/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
11/15/2023
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
10/30/2023
Objection resolved — Addressed
10/20/2023
Objection raised — Scope
10/17/2023
Filed — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-P2
09/25/2023
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM.
B00699429-P1
07/25/2023
Permit issued — General Construction
B00652191-I1-GC
06/13/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2023
Filed — Alteration
B00880923-I1
06/01/2023
Permit issued — Plumbing
B00699429-I1-PL
05/19/2023
Permit issued — Foundation
B00816468-S2-FO
05/15/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Scope
05/04/2023
Filed — Alteration
STRUCTURAL REPAIR WORK FOR THE PLANNED RENOVATION
B00816468-P1
04/21/2023
Permit issued — Structural
B00816468-S1-ST
04/21/2023
Permit issued — General Construction
B00816468-I1-GC
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHATCHET WORKS CORP05/08/2024
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP02/01/2024
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP07/25/2023
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP06/01/2023
DOB NOWFoundationSigned-offHATCHET WORKS CORP05/19/2023
DOB NOWStructuralSigned-offHATCHET WORKS CORP04/21/2023
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP04/21/2023
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP01/06/2022
1 project · most recent 03/28/2022
FiledStatusContractorScope
03/28/2022——44 heads
1 project · most recent 09/25/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/25/2023Signed-offROLANDO MECHANICAL OF NYGas, Water/Sanitary
2 projects · most recent 07/20/2023
General Wiring
FiledStatusContractorScope
07/20/2023CompleteGRAMERCY ELECTRIC INCGeneral Wiring
06/07/2019CompletePLATINUM PWR ELECTL CONT—
3 projects · most recent 11/27/2023
Wood Steel Masonry
FiledStatusContractorScope
11/27/2023Signed-offHATCHET WORKS CORPWood
05/19/2022——1 scope_items
03/21/2022——Steel, Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/13/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
06/26/2026Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
06/26/2026Mechanical SystemsNICHOLAS AZADIANspecial
06/26/2026FinalNICHOLAS AZADIANprogress
06/26/2026Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
06/26/2026HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
06/26/2026HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
06/26/2026HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
06/26/2026Shutoff dampersNICHOLAS AZADIANenergy_progress
07/25/2024HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
07/25/2024Shutoff dampersNICHOLAS AZADIANenergy_progress
07/25/2024HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
07/25/2024HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
07/25/2024FinalNICHOLAS AZADIANprogress
07/25/2024Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
07/25/2024Mechanical SystemsNICHOLAS AZADIANspecial
07/25/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
03/19/2024Structural Steel - High Strength BoltingALEKSANDR LEVINspecial
03/19/2024Footing and FoundationALEKSANDR LEVINprogress
03/19/2024FinalALEKSANDR LEVINprogress
03/19/2024Subsurface Investigations (Borings/Test Pits)Gregory Pillorispecial
03/19/2024Structural Steel - WeldingALEKSANDR LEVINspecial
03/19/2024Subgrade InspectionsALEKSANDR LEVINspecial
03/19/2024Post-installed AnchorsALEKSANDR LEVINspecial
03/19/2024Structural Steel - DetailsALEKSANDR LEVINspecial
03/19/2024Construction Operations Influencing Adjacent StructuresALEKSANDR LEVINspecial
Latest 25 of 107.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/31/2026B00652191-I1Request digital key ↗
08/31/2026B00668795-I1Request digital key ↗
08/30/2026B00699385-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00668795-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00668795-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/31/2026B00652191-I1Open ↗
08/30/2026B00699385-I1Open ↗
08/30/2026B00699385-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B00699385-I1Open ↗
09/01/2026B00699385-I1Open ↗
09/01/2026B00699385-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B00699385-I1Open ↗
09/01/2026B00699385-I1Open ↗
09/01/2026B00816468-P2Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00668795-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/31/2026B00652191-I1Open ↗
08/30/2026B00699385-I1Open ↗
08/30/2026B00699449-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/30/2026B00699385-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/14/2026B00696709-I1Open ↗
08/13/2026B00816468-S2Open ↗
08/13/2026B00816468-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/14/2026B00696709-I1Open ↗
08/13/2026B00816468-S2Open ↗
▸DOB NOWTR4 Plot Diagram1
08/14/2026B00696709-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram2
08/14/2026B00696709-I1Open ↗
08/13/2026B00668795-I1Open ↗
▸DOB NOWSURVEY: INITIAL1
08/13/2026B00668795-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00668795-I1Open ↗