← Back
Community center
42 SUNSET AVENUE
STATEN ISLAND · BIN 5034361
💬 Discuss this project
1969Year Built
2Stories
P5Building Class
R3-1Zoning
13,640 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Community center · 100,970 sf lot · 0.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 238p · 1 filing · 20 docs
Floor 142p · 2 filings · 20 docs
Cellar40p · 2 filings · 20 docs
1 job · most recent 11/24/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/24/2025Signed-offASW EXPEDITING SERVICS INAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-4C36NA2-U1 35,400 BTU · Heat Pump Outdoor ×20
MXZ-5C42NA2-U1 40,500 BTU · Heat Pump Outdoor ×12
MUZ-GS30NA 30,600 BTU · Heat Pump Outdoor ×4
MUZ-HM09NA 9,000 BTU · Heat Pump Outdoor ×4
Heating
Mitsubishi Electric MXZ-4C36NA2-U1 35,400 BTU · Heat Pump Outdoor ×20
MXZ-5C42NA2-U1 4,500 BTU · Heat Pump Outdoor ×12
MUZ-GS30NA 32,600 BTU · Heat Pump Outdoor ×4
MUZ-HM09NA 10,900 BTU · Heat Pump Outdoor ×4
Ventilation
Broan LP50100DC 50 CFM · Exhaust Fan ×8
1 job · most recent 11/24/2025
Sprinkler System
FiledStatusContractorScope
11/24/2025Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
1 job · most recent 11/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/24/2025Signed-offCOMPLETE PIPING & HEATINGGas, Water/Sanitary
1 job · most recent 02/14/2022
General Wiring
FiledStatusContractorScope
02/14/2022CompleteCONTACT ELECTRIC CORPGeneral Wiring
1 job · most recent 11/24/2025
Wood
FiledStatusContractorScope
11/24/2025Signed-offASW EXPEDITING SERVICS INWood
Building Lifecycle
All (213)Filed (24)Permit Issued (8)Signed Off (6)Violation (49)Inspection (16)Objection (80)Special Inspection (30)
01/28/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING (2) STORY BUILDING WITH CHANGE OF OCCUPANCY FROM EXISTING RESIDENTIAL/COMMUNITY FACILITY TO COMMUNITY FACILITY.NO CHANGE TO BULK
S00676528-S7
01/23/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/13/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/07/2026
Permit issued — Curb Cut
S00676528-S7-CC
12/26/2025
Special inspection requirement — Metering
FAHAD FATEH
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/26/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/26/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
12/26/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/26/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/26/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/24/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Scope
12/08/2025
Objection resolved — Addressed
11/24/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING (2) STORY BUILDING WITH CHANGE OF OCCUPANCY FROM EXISTING RESIDENTIAL/COMMUNITY FACILITY TO COMMUNITY FACILITY.NO CHANGE TO BULK
S00676528-S7
11/07/2025
Objection raised — Scope
11/04/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING (2) STORY BUILDING WITH CHANGE OF OCCUPANCY FROM EXISTING RESIDENTIAL/COMMUNITY FACILITY TO COMMUNITY FACILITY.NO CHANGE TO BULK
S00676528-A9
09/29/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING (2) STORY BUILDING WITH CHANGE OF OCCUPANCY FROM EXISTING RESIDENTIAL/COMMUNITY FACILITY TO COMMUNITY FACILITY.NO CHANGE TO BULK
S00676528-A8
09/29/2025
Special inspection requirement — Metering
FAHAD FATEH
09/29/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/29/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/29/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/29/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/29/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2025
Objection resolved — Addressed
10/25/2024
Objection raised — Scope
10/12/2024
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING (2) STORY BUILDING WITH CHANGE OF OCCUPANCY FROM EXISTING RESIDENTIAL/COMMUNITY FACILITY TO COMMUNITY FACILITY.NO CHANGE TO BULK
S00676528-A6
07/04/2024
Objection resolved — Addressed
07/04/2024
Objection resolved — Addressed
07/04/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Fire_Protection
06/20/2024
Objection raised — Inspections
06/20/2024
Objection raised — Fire_Protection
06/20/2024
Objection raised — Fire_Protection
06/20/2024
Objection raised — Admin
06/20/2024
Objection raised — Fire_Protection
06/20/2024
Objection raised — Fire_Protection
06/20/2024
Objection raised — Fire_Protection
06/06/2024
Filed — No Work
S01061726-I1
06/05/2024
Special inspection requirement — Public Assembly Emergency Lighting
NANIK MASSAND
04/03/2024
Filed — No Work
S01030119-I1
04/03/2024
Special inspection requirement — Public Assembly Emergency Lighting
NANIK MASSAND
03/11/2024
Objection resolved — Addressed
03/06/2024
Objection raised — Scope
03/04/2024
Filed — Alteration CO
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO EXISTING (2) STORY BUILDING WITH CHANGE OF OCCUPANCY FROM EXISTING RESIDENTIAL/COMMUNITY FACILITY TO COMMUNITY FACILITY.NO CHANGE TO BULK
S00676528-A5
Latest 60 of 213 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
42-60 SUNSET LLC1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC1111/24/2025
ADVANCED ENGINEERING & INSPECT. PLL1205/11/2023
ROBERT SIQECA PE105/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREENWOOD RENOVATIONSGeneral Contractor507/08/2026
DNA PLUMBING CONTR. INCPlumbing307/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
ASW EXPEDITING SERVICS INGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161811/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offASW EXPEDITING SERVICS IN01/07/2026
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC07/03/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP05/23/2022
DOB NOWStructuralSigned-offGREENWOOD RENOVATIONS05/20/2022
DOB NOWMechanical SystemsSigned-offGREENWOOD RENOVATIONS05/18/2022
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC05/18/2022
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC05/13/2022
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD RENOVATIONS05/13/2022
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
01/23/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
01/13/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
09/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/06/2022Fail-Final CND-Occupancy InspectionFailView ↗
07/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
12/26/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
12/26/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/26/2025Fenestration areasFAHAD FATEHenergy_progress
12/26/2025MeteringFAHAD FATEHenergy_progress
12/26/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/26/2025Fenestration air leakageFAHAD FATEHenergy_progress
12/26/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/26/2025Interior lighting powerFAHAD FATEHenergy_progress
12/26/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/26/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/29/2025Interior lighting powerFAHAD FATEHenergy_progress
09/29/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
09/29/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/29/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/29/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/29/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/29/2025MeteringFAHAD FATEHenergy_progress
09/29/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/29/2025Fenestration areasFAHAD FATEHenergy_progress
09/29/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/29/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/05/2024Public Assembly Emergency LightingNANIK MASSANDprogress
04/03/2024Public Assembly Emergency LightingNANIK MASSANDprogress
02/29/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 92.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch22
08/18/2026S00676528-P2Request digital key ↗
08/18/2026S00676528-A3Request digital key ↗
08/18/2026S00676528-A2Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/21/2026S01030119-I1Request digital key ↗
08/21/2026S01061726-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
09/03/2025520366112Open ↗
09/03/2025520366112Open ↗
08/19/2019520366112Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/18/2026S00676528-A3Open ↗
08/18/2026S00676528-P8Open ↗
08/18/2026S00676528-P5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026S00676528-S3Open ↗
09/01/2026S00676528-S3Open ↗
08/31/2026S00676528-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/20/2026S00676528-S6Open ↗
09/01/2026S00676528-S3Open ↗
08/31/2026S00676528-P4Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/19/2019520366112Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/19/2019520366112Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/19/2019520366112Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/19/2019520366112Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist8
08/18/2026S00676528-I1Open ↗
08/18/2026S00676528-A3Open ↗
08/18/2026S00676528-P8Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
08/18/2026S00676528-A3Open ↗
08/18/2026S00676528-P8Open ↗
08/18/2026S00676528-P5Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/19/2019520366112Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/19/2019520366112Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/15/2026S00676528-S3Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/15/2026S00676528-S6Open ↗
08/15/2026S00676528-S5Open ↗
08/13/2026S01061726-I1Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/19/2019520366112Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/19/2019520366112Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification11
08/18/2026S00676528-A3Open ↗
08/18/2026S00676528-P8Open ↗
08/18/2026S00676528-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/18/2026S00676528-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026S00676528-I1Open ↗