RoofUnder Construction8p · 4 filings · 20 docs
CivilElectricalEquipmentMechanical
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
39 documents · 4 drawing sheets
Installation of a temporarily supported scaffold and system scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this job
12 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 40Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 39Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 38Under Construction21p · 3 filings · 20 docs
ElectricalEquipmentMechanical
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
39 documents · 20 drawing sheets
INSTALLATION OF TEMPORARY MONORAIL SYSTEM AS PER DRAWINGS. MONORAIL SYSTEM SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
29 documents · 1 drawing sheet
Floor 37Under Construction5p · 2 filings · 20 docs
EquipmentMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
39 documents · 5 drawing sheets
Floor 36Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 35Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 34Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 33Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 32Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 31Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 30Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 29Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 28Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 27Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 26Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 25Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 24Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 23Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 22Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 21Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 20Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 19Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 18Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 17Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 16Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 15Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 14Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 13Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 12Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 11Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 10Under Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 9Under Construction2p · 4 filings · 20 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
39 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION ON THE 9th FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SYSTEM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 12p · 2 filings · 8 docs
MechanicalPlumbing
PROVIDE SANITARY, COLD WATER, HOT WATER PIPING TO THE NEW PLUMBING FIXTURES AND EQUIPMENTS IN COMMERCIAL FOOD AND BEVERAGE STORE. THIS APPLICATION IS IN CONJUNCTION WITH DOB NOW APPLICATION# M00658893
On file for this job
5 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
3 documents · 1 drawing sheet