← Back
Elevator cooperative
420 RIVERSIDE DRIVE
MANHATTAN · BIN 1057365
💬 Discuss this project
1912Year Built
13Stories
D4Building Class
R8Zoning
138,633 sfGross Floor Area
104Units
LL97 CoveredRent Stabilized22 Open Violations 21 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 420 RIVERSIDE OWNERS CORP · 17,490 sf lot · 7.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 5 docs
Bulkhead1p · 1 filing · 4 docs
Floor 125p · 2 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 68p · 1 filing · 11 docs
Floor 5
Floor 4Under Construction25p · 2 filings · 20 docs
Floor 3Under Construction2p · 1 filing · 8 docs
Floor 2
Floor 1
2 jobs · most recent 04/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/08/2026Signed-offAQUEDUCT MECHANICAL CORPGas, Water/Sanitary
11/26/2025——Water/Sanitary
15 jobs · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026CompleteLENS ELECTRIC, INC—
12/16/2025Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
06/06/2025CompleteKET ELECTRIC LLCGeneral Wiring
10/26/2023CompleteMODERN VOLTAGE NYC INCGeneral Wiring
06/12/2023CompleteFALCO ELEC'L SERVICES INC—
03/21/2023CompleteRND ELECTRIC CORPGeneral Wiring
06/09/2022CompleteAGIR ELECTL SOLUTION INCGeneral Wiring
09/24/2021CompleteEIS ELECTRIC CORP DBAGeneral Wiring
07/06/2021CompleteACCURATE ELEC'L CORP.General Wiring
03/01/2021CompletePRUDENT ELECTRIC INCGeneral Wiring
03/17/2020CompleteEIS ELECTRIC CORP DBA—
12/06/2019CompleteVILANOVA ELEC'L CO. LLCGeneral Wiring
07/11/2018CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
06/19/2018CompleteE & M ELECTRICAL NY CORPGeneral Wiring
02/20/2018CompleteRIGID ELECTRIC, INC.General Wiring
1 job · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026Permit IssuedAIR UA CORP1 scope_items
Building Lifecycle
All (206)Filed (24)Permit Issued (20)Signed Off (9)Facade (FISP) (18)Violation (60)Inspection (11)Objection (35)Special Inspection (29)
09/16/2026
Filed — Alteration
NON-STRUCTURAL ISOLATED SLAB INFILL AS PER THE DRAWINGS FILED HEREIN.
M01324983-S3
09/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2026
Permit issued — Plumbing
M01375337-S1-PL
09/01/2026
Permit issued — General Construction
M01377951-I1-GC
08/26/2026
Permit issued — Mechanical Systems
M01324983-S2-MS
08/24/2026
Special inspection requirement — Final
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/12/2026
Permit issued — General Construction
M01324983-I1-GC
08/10/2026
Permit issued — Plumbing
M01324983-S1-PL
05/21/2026
Permit issued — General Construction
M01324983-I1-GC
05/19/2026
Permit issued — General Construction
M01375337-I1-GC
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/07/2026
Filed — Alteration
M01377951-I1
05/07/2026
Filed — Alteration
M01377951-S1
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Other
05/04/2026
Objection raised — Inspections
04/16/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01229814-I1
04/16/2026
Objection resolved — Resolved
04/08/2026
Filed — Alteration
COMBINATION OF APARTMENT UNIT #12F AND #12J PER PLANS FILED HEREWITH. WORK INCLUDES CAPPING AND REMOVAL OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01375337-I1
04/08/2026
Filed — Alteration
COMBINATION OF APARTMENT UNIT #12F AND #12J PER PLANS FILED HEREWITH. WORK INCLUDES CAPPING AND REMOVAL OF EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01375337-S1
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/24/2026
Objection raised — Scope
03/24/2026
Objection raised — Plumbing
03/13/2026
Objection raised — Admin
03/13/2026
Objection raised — Scope
03/13/2026
Objection raised — Cost
03/11/2026
Objection raised — Admin
03/11/2026
Objection raised — Scope
03/11/2026
Objection raised — Scope
02/04/2026
Filed — Alteration
NON-STRUCTURAL ISOLATED SLAB INFILL AS PER THE DRAWINGS FILED HEREIN.
M01324983-S2
02/04/2026
Filed — Alteration
NON-STRUCTURAL ISOLATED SLAB INFILL AS PER THE DRAWINGS FILED HEREIN.
M01324983-I1
02/04/2026
Filed — Alteration
NON-STRUCTURAL ISOLATED SLAB INFILL AS PER THE DRAWINGS FILED HEREIN.
M01324983-S1
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tyler Caine
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tyler Caine
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tyler Caine
11/27/2025
Objection resolved — Addressed
11/26/2025
Filed — Alteration
REPLACE PLUMBING FIXTURE IN THE BATHROOM AND ADD SHOWER IN AN EXISTING ROUGING IN APT # 7D
M01296656-S1
11/25/2025
Objection raised — Scope
11/25/2025
Special inspection requirement — Final
Tyler Caine
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tyler Caine
11/24/2025
Filed — Alteration
REPLACE PLUMBING FIXTURE IN THE BATHROOM AND ADD SHOWER IN AN EXISTING ROUGING IN APT # 7D
M01296656-I1
10/20/2025
Signed off — Alteration
M01051662-S2
10/02/2025
Special inspection requirement — Final
09/25/2025
Cycle 10 facade report submitted
09/19/2025
Signed off — Alteration
M01051662-S1
09/18/2025
Signed off — Alteration
M01051662-I1
09/18/2025
Cycle 10 facade report signed — SWARMP
08/13/2025
Cycle 10 facade inspection completed
06/26/2025
Permit issued — Suspended Scaffold
M01229814-I1-SC
Latest 60 of 206 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
420 RIVERSIDE OWNERS9607/08/2026
HOFFMAN MANAGEMENT2407/08/2026
OWNER OF 420 RIVERSIDE DR103/22/2026
NCB MORTGAGE CORP.303/22/2026
NCB MTGE CORP103/22/2026
DELPHI CONSTRUCTION203/22/2026
420 RIVERSIDE DRIVE OWNERS1503/21/2026
HOFFMAN REALTY103/21/2026
T-MOBILE103/21/2026
C O HOFFMAN MANAGEMENT703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELPHI CONSTRUCTION CORPGeneral Contractor507/08/2026
KOSTANDINOS TSOUKANTASElectrical303/21/2026
DIFUSCO, NICOLINOElectrical203/21/2026
KET ELECTRIC LLCElectrical203/22/2026
NEW YORK PARK PLBG&HTG COPlumbing207/08/2026
A & E BROTHERS LTDGeneral Contractor209/07/2026
ALEXANDER FEDERICO.JRElectrical203/21/2026
TAURUS CONSTRUCTION CORPGeneral Contractor203/21/2026
MICHAEL MURPHYElectrical103/21/2026
MURPHY, MICHAELElectrical103/21/2026
PERMA IRON CRAFT CORPElectrical103/21/2026
PETROF, PETREElectrical103/21/2026
PRUDENT ELECTRIC INCElectrical103/22/2026
TOUGH STALLION LLCElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
VICTOR, ALLANElectrical103/21/2026
VILANOVA ELEC'L CO. LLCElectrical103/22/2026
WIESLAW MAKSIMElectrical103/21/2026
AIR UA CORPGeneral Contractor108/27/2026
ALLIED TELECOM CORPGeneral Contractor107/08/2026
ARI CONST & PAINTING LLCGeneral Contractor107/08/2026
IVENKO INCGeneral Contractor109/02/2026
STROYBAT INCGeneral Contractor107/08/2026
AQUEDUCT MECHANICAL CORPPlumbing109/02/2026
AURA PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ECHO DESIGN + ARCHITECTUR9129105/07/2026
ALAN MARGOLIN & ASSOC423102/04/2026
DCP ARCHITECTURE PLLC8724302/04/2026
MIRELLA BOSELLI R.A.6330401/03/2025
ANGELOS GEORGOPOULOS, P.C2955110/07/2024
SANJIVE VAIDYA ARCHITECT,6566110/10/2022
CAROL MARYAN ARCHITECT4233106/17/2021
BENDIX ENGINEERING, P.C.4293206/15/2021
KMB DESIGN GROUP, LLC513106/29/2018
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP09/01/2026
DOB NOWGeneral ConstructionPermit IssuedIVENKO INC09/01/2026
DOB NOWMechanical SystemsPermit IssuedAIR UA CORP08/26/2026
DOB NOWGeneral ConstructionPermit IssuedA & E BROTHERS LTD08/12/2026
DOB NOWPlumbingPermit IssuedPFL MECHANICAL CORP08/10/2026
DOB NOWGeneral ConstructionPermit IssuedA & E BROTHERS LTD05/21/2026
DOB NOWGeneral ConstructionPermit IssuedARI CONST & PAINTING LLC05/19/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/26/2025
DOB NOWStructuralSigned-offDELPHI CONSTRUCTION CORP10/25/2024
DOB NOWGeneral ConstructionSigned-offDELPHI CONSTRUCTION CORP10/25/2024
DOB NOWPlumbingSigned-offAURA PLUMBING INC09/04/2024
DOB NOWGeneral ConstructionSigned-offDELPHI CONSTRUCTION CORP08/13/2024
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT08/05/2024
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO04/04/2023
DOB NOWPlumbingSigned-offNICE PLUMBING CORP12/22/2022
DOB NOWMechanical SystemsSigned-offSTROYBAT INC11/09/2022
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO09/30/2021
DOB NOWGeneral ConstructionSigned-offKING KONG GC07/02/2021
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC10/05/2020
DOB NOWAntennaPermit IssuedALLIED TELECOM CORP03/08/2019
BISOTISSUEDMAMAIS CONTRACTING CORP12/29/2023
BISOTISSUEDMAMAIS CONTRACTING CORP12/29/2023
BISOTISSUEDMAMAIS CONTRACTING CORP12/28/2023
BISOTISSUEDMAMAIS CONTRACTING CORP12/28/2023
BISOTISSUEDMAMAIS CONTRACTING CORP04/27/2023
BISOTISSUEDMAMAIS CONTRACTING CORP04/11/2023
BISOTISSUEDMAMAIS CONTRACTING CORP10/11/2022
BISOTISSUEDMAMAIS CONTRACTING CORP04/12/2022
BISPLISSUEDMC CREADY & RICE PLBG INC.04/05/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/02/2021
BISOTISSUEDSTREAMLINE USA LLC11/17/2020
BISOTISSUEDSTREAMLINE USA LLC10/05/2020
BISMHISSUEDZ-DAR CONTRACTING INC07/08/2020
BISOTISSUEDZ-DAR CONTRACTING INC07/08/2020
BISPLISSUEDFIVE STAR P&H CO,INC06/17/2020
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/31/2020
BISOTISSUEDYATES REST GROUP LTD02/20/2020
BISPLISSUEDTAYLOR GROUP PLBG,HTG MEC07/19/2019
BISPLISSUEDFIVE STAR P&H CO,INC06/24/2019
BISOTISSUEDZ-DAR CONTRACTING INC06/17/2019
+ 30 more permits on file
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/24/2026Final—progress
08/24/2026Structural Stability – Alterations of existing buildings—special
03/25/2026Tenant Protection Plan Compliance—special
12/02/2025Tenant Protection Plan ComplianceTyler Cainespecial
12/02/2025Tenant Protection Plan ComplianceTyler Cainespecial
12/02/2025Fire-Resistant Penetrations and JointsTyler Cainespecial
11/25/2025FinalTyler Caineprogress
11/25/2025Fire-Resistant Penetrations and JointsTyler Cainespecial
10/02/2025Final—progress
01/08/2025Fire-Resistance Rated ConstructionMirella Boselliprogress
01/08/2025FinalZachary Lewisprogress
01/08/2025Fire-Resistant Penetrations and JointsMirella Bosellispecial
12/27/2024Fire-Resistant Penetrations and JointsMirella Bosellispecial
12/27/2024FinalZachary Lewisprogress
12/27/2024Fire-Resistance Rated ConstructionMirella Boselliprogress
12/03/2024Fire-Resistant Penetrations and JointsMirella Bosellispecial
11/26/2024Fire-Resistant Penetrations and JointsMirella Bosellispecial
05/15/2024FinalAngelos Georgopoulosprogress
05/15/2024Structural Steel - DetailsAngelos Georgopoulosspecial
05/15/2024Structural Steel - WeldingAngelos Georgopoulosspecial
05/15/2024Structural Steel - High Strength BoltingAngelos Georgopoulosspecial
05/15/2024Structural Stability – Alterations of existing buildingsAngelos Georgopoulosspecial
07/30/2021Fire-Resistant Penetrations and JointsMatthew Bendixspecial
06/17/2021Maintenance informationCarol Maryanenergy_progress
06/11/2021Fire-Resistant Penetrations and JointsMatthew Bendixspecial
Latest 25 of 29.
▾Documents — 854 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
09/06/2026M01375337-S1Contact architect ↗
09/03/2026M00507500-S1Contact architect ↗
09/03/2026M00507500-I1Contact architect ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00333382-I1Contact architect ↗
08/15/2026M00333382-P1Contact architect ↗
▸Applications & Permits195
▸BISPLAN / WORK APPROVAL APPLICATION88
01/09/2023140984291Open ↗
02/04/2022140984335Open ↗
04/30/2021123736733Open ↗
Showing 3 of 88 on file for this type
▸BISWORK PERMIT APPLICATION82
10/11/2022140984335Open ↗
04/12/2022140984291Open ↗
04/06/2021102910922Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWLPC Approval/Permit21
09/22/2026M01324983-S3Open ↗
09/06/2026M01375337-S1Open ↗
09/03/2026M00507500-S1Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/17/2021102910922Open ↗
03/11/2021123148245Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/29/2020140945333Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/29/2020140945333Open ↗
▸Seals & Professional Certifications138
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION65
10/11/2022140984335Open ↗
03/02/2020123190402Open ↗
03/02/2020123190402Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/22/2026M01324983-S3Open ↗
09/06/2026M01375337-I1Open ↗
09/06/2026M01375337-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026M01051662-S1Open ↗
09/23/2026M01324983-S1Open ↗
09/23/2026M01324983-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026M00507500-S1Open ↗
08/30/2026M01324983-I1Open ↗
08/27/2026M01051662-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
12/03/2020140984335Open ↗
09/03/2020140945333Open ↗
Showing 2 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
12/04/2020140984291Open ↗
12/03/2020140984335Open ↗
09/03/2020140945333Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment71
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING22
04/30/2021123736733Open ↗
04/26/2021102910922Open ↗
Showing 2 of 22 on file for this type
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS5
01/24/2022123736733Open ↗
01/24/2022123736733Open ↗
01/24/2022123736733Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/24/2022123736733Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection20
▸BISTenant Protection Plan and Notes13
06/12/2019123736733Open ↗
05/17/2019123736733Open ↗
09/21/2020140945333Open ↗
Showing 3 of 13 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
05/17/2019123736733Open ↗
Showing 1 of 3 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
11/23/2021140984335Open ↗
11/23/2021140984291Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00333382-P1Open ↗
08/13/2026M00333382-I1Open ↗
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/22/2026M01324983-S3Open ↗
09/06/2026M01375337-S1Open ↗
09/03/2026M00333382-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
12/04/2020140984291Open ↗
12/03/2020140984335Open ↗
09/16/2020140945333Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
03/16/2021123148245Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6405MN181
03/16/2021123148245Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
01/24/2020123149440Open ↗
06/04/2019140749340Open ↗
Showing 2 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
10/30/2020123424071Open ↗
01/24/2020123149440Open ↗
07/02/2019122618060Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
09/14/2021140945333Open ↗
03/16/2021123148245Open ↗
10/30/2020123424071Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC EXEMPTION3
12/04/2020140984291Open ↗
12/03/2020140984335Open ↗
09/03/2020140945333Open ↗
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00507500-S1Open ↗
09/03/2026M00507500-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/16/2021123148245Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY30
12/20/2022140984291Open ↗
03/08/2022140984335Open ↗
02/03/2022140984335Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/11/2022140984335Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/04/2022140984335Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
01/21/2022123736733Open ↗
10/26/2021102910922Open ↗
09/14/2021140945333Open ↗
Showing 3 of 29 on file for this type
▸BISLANDMARKS APPROVAL16
06/17/2021140984291Open ↗
05/14/2021140984335Open ↗
03/11/2021123148245Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
04/06/2020140610998Open ↗
04/06/2020140610998Open ↗
06/21/2019122618060Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS SIGNOFF3
01/21/2022123736733Open ↗
09/02/2021140610998Open ↗
03/16/2021123148245Open ↗
▸Cost, Insurance & Ownership66
▸BISCOST AFFIDAVIT61
10/26/2021102910922Open ↗
09/14/2021140945333Open ↗
05/12/2021140984291Open ↗
Showing 3 of 61 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/21/2022123736733Open ↗
03/16/2021123148245Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
05/12/2021140984291Open ↗
▸Filing & Intake Forms99
▸BISBOROUGH INTAKE FORM35
10/11/2022140984335Open ↗
10/04/2022140984335Open ↗
04/06/2021102910922Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION33
06/22/2021140984291Open ↗
06/17/2021140984291Open ↗
05/14/2021140984335Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET20
09/16/2020140945333Open ↗
Showing 1 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
12/04/2020140984291Open ↗
12/03/2020140984335Open ↗
09/03/2020140945333Open ↗
Showing 3 of 11 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
01/21/2022123736733Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWProof of Historic Building4
08/26/2026M01051662-I1Open ↗
08/13/2026M01051662-P2Open ↗
08/13/2026M00498677-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01229814-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01070865-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01070865-I1Open ↗