Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Zebra
420 WEST 42 STREET · Hell's Kitchen · BIN 1087184
💬 Discuss this project
2000Year Built
40Stories
RMBuilding Class
C6-4Zoning
289,281 sfGross Floor Area
267Units
LL97 CoveredRent Stabilized17 Open Violations 12 unresolved · 5 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 14,344 sf lot · 20.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Site & exteriorUnder Construction15p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DYER AVE ASSOCIATES2603/21/2026
42ND STREET DEVELOPMENT2003/21/2026
KINGS GROUP NY CORP1303/22/2026
J S WATERPROOFING LLC SUITE 2706/28/2026
CLINTON 42ND ST LLC C O URBAN703/21/2026
420 WEST 42ND STREET603/21/2026
CLINTON 42ND ST, LLC C/O URBAN403/21/2026
DYER AVENUE ASSO.LLC403/21/2026
BUILDING FOR THE ARTS NY, INC203/21/2026
400 WEST 59TH ST. PARTNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC204/11/2024
AP PROFESSIONAL ENGINEERING PLLC103/04/2024
SETH P. ROYE ARCHITECT PC102/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC403/21/2026
SANDEEP KAUR103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor1203/21/2026
J&S WATERPROOFING LLCGeneral Contractor707/08/2026
ALBERT SAYERSElectrical303/21/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
OLIVER CHRISTOPHERElectrical103/21/2026
ALEXANDER EUGENEElectrical103/21/2026
LINEAR ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665102/09/2024
PHILIBERT ENGINEERING, PC223102/02/2024
SETH P ROYE ARCHITECT PC8554102/02/2024
Building Lifecycle
All (93)Filed (5)Permit Issued (12)Signed Off (2)Facade (FISP) (12)Violation (60)Objection (2)
09/05/2026
Violation issued (HPD, open)
C
07/20/2026
Signed off — Alteration
Masonry facade work as per plans. No change to use, egress, or occupancy.
M00997420-I1
07/08/2026
Violation issued (HPD, open)
A
06/22/2026
Permit issued — Suspended Scaffold
M01001804-I1-SC
06/22/2026
Permit issued — Protection and Mechanical Methods
M01013380-I1-PMM
09/04/2025
Signed off — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01009094-I1
08/18/2025
Violation issued (ECB, closed)
Construction
06/26/2025
Cycle 9 facade report submitted
06/26/2025
Cycle 9 facade report signed — SAFE
06/25/2025
Cycle 9 facade inspection completed
03/07/2025
Permit issued — Protection and Mechanical Methods
M01013380-I1-PMM
03/07/2025
Permit issued — General Construction
M00997420-I1-GC
02/14/2025
Permit issued — Supported Scaffold
M01009094-I1-SF
02/13/2025
Permit issued — Supported Scaffold
M01009094-I1-SH
02/03/2025
Permit issued — Suspended Scaffold
M01001804-I1-SC
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, closed)
C
06/09/2024
Violation issued (HPD, closed)
C
04/11/2024
Filed — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01009094-P1
03/06/2024
Permit issued — General Construction
M00997420-I1-GC
03/05/2024
Permit issued — Protection and Mechanical Methods
M01013380-I1-PMM
03/04/2024
Filed — Alteration
M01013380-I1
02/23/2024
Permit issued — Supported Scaffold
M01009094-I1-SF
02/23/2024
Permit issued — Sidewalk Shed
M01009094-I1-SH
02/21/2024
Filed — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01009094-I1
02/19/2024
Cycle 9 facade report submitted
02/19/2024
Cycle 9 facade report signed — UNSAFE
02/19/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2024
Permit issued — Suspended Scaffold
M01001804-I1-SC
02/14/2024
Objection raised — Other
02/14/2024
Objection resolved — Addressed
02/09/2024
Filed — Alteration
Installation of suspended Scaffold for facade inspection / Repair.
M01001804-I1
02/09/2024
Cycle 9 facade inspection completed
02/02/2024
Filed — Alteration
Masonry facade work as per plans. No change to use, egress, or occupancy.
M00997420-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2022
Violation issued (HPD, closed)
B
08/12/2022
Violation issued (HPD, closed)
A
08/12/2022
Violation issued (HPD, closed)
B
08/12/2022
Violation issued (HPD, closed)
C
08/12/2022
Violation issued (HPD, closed)
B
08/12/2022
Violation issued (HPD, closed)
B
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2021
Violation issued (HPD, closed)
A
04/27/2020
Cycle 8 facade inspection completed
04/20/2020
Cycle 8 facade report signed — SWARMP
02/06/2020
Cycle 8 facade report submitted
12/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/12/2019
Violation issued (ECB, closed)
Signs
11/12/2019
Violation issued (ECB, closed)
Signs
11/12/2019
Violation issued (ECB, closed)
Signs
11/12/2019
Violation issued (ECB, open)
Signs
11/12/2019
Violation issued (ECB, closed)
Signs
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedJ&S WATERPROOFING LLC06/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedJ&S WATERPROOFING LLC06/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedJ&S WATERPROOFING LLC03/07/2025
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC03/07/2025
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP02/14/2025
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP02/13/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&S WATERPROOFING LLC02/03/2025
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC03/06/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedJ&S WATERPROOFING LLC03/05/2024
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP02/23/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP02/23/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&S WATERPROOFING LLC02/15/2024
BISSPISSUEDRIGHTWAY PLBG & HTG INC11/04/2020
BISSPISSUEDRIGHTWAY PLBG & HTG INC05/28/2019
BISOTISSUEDDBD CONTRACTING LLC01/30/2019
BISOTISSUEDUPGRADE CONTR. CO. INC07/11/2018
BISSPISSUEDRIGHTWAY PLBG & HTG INC05/22/2018
BISOTISSUEDDBD CONTRACTING LLC02/05/2018
BIS—ISSUEDSIGNS CAD CORP04/05/2016
BISOTISSUEDGGP CONTRACTING CORP05/05/2015
BISOTISSUEDSUBURBAN CONTRACTING CORP01/20/2012
BIS—ISSUEDBERGER SIGNS INC04/01/2005
BIS—ISSUEDBERGER SIGNS INC04/01/2005
BIS—ISSUEDBERGER SIGNS INC04/01/2005
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM IN03/09/2005
BISEQISSUEDIDS TRADING INC.02/03/2005
BISMHISSUEDIDS TRADING INC02/01/2005
BISSPISSUEDPLUMBING & HTG DOCTOR INC01/26/2005
BISEQISSUEDIDS TRADING INC.01/24/2005
BISPLISSUEDPLUMBING & HTG DOCTOR INC01/19/2005
BISOTISSUEDIDS TRADING INC01/03/2005
BIS—ISSUEDMAUCERI SIGN CO., INC03/05/2003
BIS—ISSUEDMAUCERI SIGN CO., INC03/05/2003
BIS—ISSUEDMAUCERI SIGN CO., INC03/05/2003
BIS—ISSUEDMAUCERI SIGN CO., INC03/05/2003
BIS—ISSUEDMAUCERI SIGN CO., INC02/21/2003
BIS—ISSUEDMAUCERI SIGN CO., INC02/21/2003
BIS—ISSUEDMAUCERI SIGN CO., INC02/21/2003
BISOTISSUEDBARR & BARR INC12/11/2002
BISSDISSUEDS AND S FIRE SUPPRESSION SYSTEMS09/20/2002
+ 22 more permits on file
13 projects · most recent 03/14/2026
General Wiring
FiledStatusContractorScope
03/14/2026CompleteLINEAR ELECTRIC, INC.—
10/10/2025CompleteLINEAR ELECTRIC, INC.—
07/18/2025CompleteLINEAR ELECTRIC, INC.—
04/16/2024CompleteLINEAR ELECTRIC, INC.—
03/08/2024CompleteHIGH QUALITY ELECTRIC OF—
12/08/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
12/06/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
09/23/2022CompleteSTAR ELEC'L CONTRACTORS C—
07/22/2022CompleteLINEAR ELECTRIC, INC.—
10/28/2021CompleteLINEAR ELECTRIC, INC.—
10/12/2020CompleteP.S. MARCATO ELEV. CO INC—
03/16/2020CompleteH. & L. ELECTRIC INCGeneral Wiring
02/13/2019CompleteLINEAR ELECTRIC, INC.—
1 project · most recent 02/09/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/09/2024Permit IssuedJ&S WATERPROOFING LLCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/08/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
02/08/2024Post-installed AnchorsKarol Zdancewiczspecial
01/29/2024Tenant Protection Plan ComplianceJacky Philibertspecial
01/29/2024Fire-Resistant Penetrations and JointsSeth Royespecial
01/29/2024MasonrySeth Royespecial
01/29/2024FinalSeth Royeprogress
01/29/2024Energy Code Compliance InspectionsSeth Royeprogress
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026M00997420-I1Request digital key ↗
08/27/2026M01013380-I1Request digital key ↗
08/27/2026M01009094-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION25
09/10/2025124055887Open ↗
12/17/2019123903981Open ↗
12/12/2019123903981Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION9
11/04/2020123821276Open ↗
10/29/2019123821276Open ↗
01/31/2019123151711Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/05/2020122746546Open ↗
02/05/2020122746546Open ↗
06/26/2019123821276Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/26/2019123821276Open ↗
05/15/2019123903981Open ↗
06/14/2018123575746Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/26/2019123821276Open ↗
05/15/2019123903981Open ↗
06/14/2018123575746Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026M01009094-I1Open ↗
08/27/2026M01009094-P1Open ↗
08/13/2026M01013380-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026M01001804-I1Open ↗
09/30/2026M01001804-I1Open ↗
08/28/2026M00997420-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/08/2011120913191Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/10/2018140754556Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M00997420-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING4
02/27/2019140754556Open ↗
07/26/2018140754556Open ↗
04/19/2018140754556Open ↗
Showing 3 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE1
04/13/2016122746546Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/26/2019123821276Open ↗
▸Safety & Tenant Protection18
▸BISANTI-HARASSMENT CHECKLIST: CLINTON5
06/26/2019123821276Open ↗
05/29/2019123903981Open ↗
06/14/2018123575746Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes5
06/26/2019123821276Open ↗
05/15/2019123903981Open ↗
06/14/2018123575746Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist4
08/13/2026M01009094-P1Open ↗
08/13/2026M01009094-I1Open ↗
08/13/2026M01013380-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
05/08/2015122384598Open ↗
12/08/2011120913191Open ↗
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
12/19/2011120913191Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
10/09/2025124055887Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/14/2018123575746Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/15/2019123903981Open ↗
07/30/2018122384598Open ↗
06/14/2018123575746Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/05/2021123151711Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/08/2011120913191Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/30/2018122384598Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/03/2021123151711Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/03/2021123151711Open ↗
05/02/2018140754556Open ↗
05/01/2018140754556Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/05/2021123151711Open ↗
02/05/2020122746546Open ↗
07/30/2018122384598Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/08/2011120913191Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01013380-I1Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT20
02/05/2020122746546Open ↗
12/17/2019123903981Open ↗
06/26/2019123821276Open ↗
Showing 3 of 20 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
05/08/2015122384598Open ↗
01/24/2012120913191Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
09/10/2025124055887Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/05/2021123151711Open ↗
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION19
12/17/2019123903981Open ↗
06/18/2019123903981Open ↗
06/13/2019123903981Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET9
09/10/2025124055887Open ↗
06/26/2019123821276Open ↗
05/15/2019123903981Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM9
11/04/2020123821276Open ↗
10/21/2020123821276Open ↗
02/05/2020122746546Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/10/2018140754556Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/09/2025124055887Open ↗
10/09/2025124055887Open ↗
10/09/2025124055887Open ↗
▸DOB NOWCalculations1
08/13/2026M01001804-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01001804-I1Open ↗