← Back
BuildNYC
Elevator apt, fireproof with stores
420 WEST END AVENUE
MANHATTAN · BIN 1032651
💬 Discuss this project
1916Year Built
13Stories
D6Building Class
R10AZoning
85,942 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator apt, fireproof with stores · Owner of record: 420 West End Ave. Co · 7,717 sf lot · 11.14 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1 filing
Floor 61 filing
Floor 5
Floor 4
Floor 3
Floor 21 filing
Floor 1
Cellar1 filing
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
420 West End AV Co3103/22/2026
Charter103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YR Studio109/22/2026
Roman S. Mardarewich Architect204/27/2023
Paul Perdek, Professional Engineering303/08/2023
SRL Associates211/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
SKY Management Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold707/08/2026
Jerrick AssociatesGeneral Contractor507/08/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection207/08/2026
Magnetic ElectricElectrical203/21/2026
Accurate ElectricalElectrical103/21/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Brandl ElectricElectrical103/22/2026
V. Vass ElectricElectrical103/21/2026
Build ItÜ Innovative CreaGeneral Contractor110/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312109/22/2026
A&B World Consulting5704204/27/2023
Frame Design and Construction7971211/08/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 08/04/2026, status Swarmp
10/26/2026
Permit issued — General Construction
M01444670-I1-GC
09/22/2026
Filed — Alteration
Installation and replacement of plumbing fixtures as shown on plans filed herewith.
M01444670-I1
09/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
08/12/2026
Special inspection requirement — Insulation placement and R values
Jeff Akerman
176 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Build ItÜ Innovative Crea—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
DOB NOW—Advanced Plumbing Mechanical—
DOB NOW—Advanced Plumbing, Mechanical & Sprinkler—
DOB NOW—Advanced Plumbing, Mechanical & Sprinkler—
DOB NOW—GE 2A Construction—
DOB NOW—GE 2A Construction—
BIS—Core Scaffold Systems—
BIS—Core Scaffold Systems—
BIS—Jerrick Associates—
BIS—Core Scaffold Systems—
BIS—Jerrick Associates—
BIS—Core Scaffold Systems—
BIS—Jerrick Associates—
BIS—S.J. Fuel Co—
BIS—Kings Plaza P & H—
BIS—Core Scaffold Systems—
BIS—Weinreb Management—
BIS—Core Scaffold Systems—
BIS—S.J. Fuel Company—
BIS—Vlad Restoration—
BIS—Kings Plaza P & H—
BIS—S.J. Fuel Co—
BIS—Core Scaffold Systems—
BIS—Vlad Restoration—
BIS—Weinreb Management—
BIS—Core Scaffold Systems—
BIS—Weinreb Management—
BIS—Pilku Construction Services—
BIS—Vlad Restoration—
BIS—Weinreb Management—
BIS—Pilku Construction Services—
BIS—Metropolitan Plumbing and Heating—
+ 20 more permits on file
Nothing on file for this building.
Nothing on file for this building.
422 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account