← Back
One story - permanent living quarter
4202 RICHMOND AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5069198
💬 Discuss this project
1955Year Built
1.5Stories
A2Building Class
R1-2Zoning
1,635 sfGross Floor Area
1Units
One story - permanent living quarter · 6,045 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 225p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE905/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAISE THE ROOF GC INCGeneral Contractor1007/08/2026
V & M DRAIN CLEANING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738605/23/2023
Building Lifecycle
All (24)Filed (9)Permit Issued (5)Signed Off (5)Inspection (5)
06/15/2023
Signed off — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-I1
05/23/2023
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-P3
05/17/2023
Signed off — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-S3
05/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2023
Signed off — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-S2
02/28/2023
Signed off — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-S1
12/15/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/08/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/02/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/18/2022
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-P2
09/19/2022
Signed off — Alteration
APPLICATION IS FILED FOR AN 8.0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS AUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONUNCTION WITH JOB# S00494439-I1.
S00494529-I1
09/01/2022
Permit issued — General Construction
S00494439-I1-GC
08/29/2022
Permit issued — General Construction
S00494439-S3-GC
06/02/2022
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-P1
05/19/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2022
Permit issued — Plumbing
S00494439-S1-PL
12/27/2021
Permit issued — Foundation
S00494439-S2-GC-CX
11/30/2021
Permit issued — Construction Fence
S00494529-I1-FN
11/01/2021
Filed — Alteration
APPLICATION IS FILED FOR AN 8.0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS AUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONUNCTION WITH JOB# S00494439-I1.
S00494529-P1
09/30/2021
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-S3
05/11/2021
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-S2
05/11/2021
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-S1
05/07/2021
Filed — Alteration CO
All bathroom fixtures (toilet, lavatory, tub) at the 2nd floor to be removed.
S00494439-I1
05/06/2021
Filed — Alteration
APPLICATION IS FILED FOR AN 8.0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS AUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONUNCTION WITH JOB# S00494439-I1.
S00494529-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRAISE THE ROOF GC INC09/01/2022
DOB NOWGeneral ConstructionSigned-offRAISE THE ROOF GC INC08/29/2022
DOB NOWPlumbingSigned-offV & M DRAIN CLEANING INC05/12/2022
DOB NOWFoundationSigned-offRAISE THE ROOF GC INC12/27/2021
DOB NOWConstruction FenceSigned-offRAISE THE ROOF GC INC11/30/2021
1 project · most recent 01/19/2022
General Wiring
FiledStatusContractorScope
01/19/2022CompleteCJC ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/15/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/08/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/02/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
06/13/2023Subgrade Inspectionsanthony santorospecial
06/13/2023Air barrier - visual inspectionanthony santoroenergy_progress
06/13/2023Fenestration areasanthony santoroenergy_progress
06/13/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
06/13/2023Fenestration air leakageanthony santoroenergy_progress
06/13/2023Permanent certificateanthony santoroenergy_progress
06/13/2023Insulation placement and R valuesanthony santoroenergy_progress
06/13/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
06/13/2023Air barrier — testing anthony santoroenergy_progress
06/13/2023Fire-Resistance Rated Constructionanthony santoroprogress
06/13/2023Energy Code Compliance Inspectionsanthony santoroprogress
06/13/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/13/2023Concrete - Cast-In-Placeanthony santorospecial
06/13/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
05/23/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/23/2023Concrete - Cast-In-Placeanthony santorospecial
05/23/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
05/23/2023Subgrade Inspectionsanthony santorospecial
05/23/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/23/2023Energy Code Compliance Inspectionsanthony santoroprogress
05/23/2023Fire-Resistance Rated Constructionanthony santoroprogress
05/23/2023Fenestration areasanthony santoroenergy_progress
05/23/2023Permanent certificateanthony santoroenergy_progress
05/23/2023Insulation placement and R valuesanthony santoroenergy_progress
05/23/2023Air barrier — testing anthony santoroenergy_progress
Latest 25 of 45.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00494439-I1Request digital key ↗
08/25/2026S00494439-P3Request digital key ↗
08/25/2026S00494439-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00494439-S3Open ↗
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00494439-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature12
08/30/2026S00494439-P1Open ↗
08/30/2026S00494439-P1Open ↗
08/29/2026S00494439-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026S00494529-P1Open ↗
08/25/2026S00494529-I1Open ↗
08/13/2026S00494439-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026S00494439-P1Open ↗
08/29/2026S00494439-P3Open ↗
08/29/2026S00494439-P3Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-P3Open ↗
08/13/2026S00494439-S3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/13/2026S00494439-P3Open ↗
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
08/13/2026S00494439-S3Open ↗
08/13/2026S00494439-S2Open ↗
08/13/2026S00494439-I1Open ↗
▸DOB NOWStreet Tree Sign Off3
08/13/2026S00494439-S3Open ↗
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-S2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00494439-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026S00494439-S1Open ↗
08/13/2026S00494439-S3Open ↗
08/13/2026S00494439-S2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00494439-S2Open ↗
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-S1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-P3Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00494439-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00494439-I1Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-S2Open ↗
08/13/2026S00494439-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-P3Open ↗
08/13/2026S00494439-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026S00494439-I1Open ↗
08/13/2026S00494439-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00494439-S2Open ↗
▸DOB NOWPD1 Document1
08/13/2026S00494439-S2Open ↗
▸DOB NOWSURVEY: INITIAL1
08/13/2026S00494439-S2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00494439-I1Open ↗