← Back
Two stories - detached, small or mid-size
4205 QUENTIN ROAD
BROOKLYN · BIN 3219540
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,680 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,600 sf lot · 0.65 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 04/15/2025
FiledStatusContractorScope
04/15/2025CompleteNY SOLAR ELECTRICAL LLC—
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/13/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
B01210809-I1
04/16/2025
Permit issued — Solar
B01210809-I1-SL
04/15/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
B01210809-I1
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
04/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
04/15/2025
Special inspection requirement — Final
ROBERT MASONE
04/15/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI104/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841104/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC04/16/2025
BISOTISSUEDZ PLUS CONST CORP03/17/2006
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/15/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
04/15/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
04/15/2025Energy Code Compliance InspectionsROBERT MASONEprogress
04/15/2025FinalROBERT MASONEprogress
04/15/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01210809-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01210809-I1Open ↗
09/01/2026B01210809-I1Open ↗
09/01/2026B01210809-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01210809-I1Open ↗
09/01/2026B01210809-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01210809-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01210809-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01210809-I1Open ↗