← Back
BuildNYC
Public elementary, junior or senior high
P.S. 38 George Cromwell
421 LINCOLN AVENUE · BIN 5054213
💬 Discuss this project
1955Year Built
1Stories
W1Building Class
R3-1Zoning
17,620 sfGross Floor Area
1Units
7 Active Violations 0 unresolved · 7 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 65,000 sf lot · 0.27 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar1 filing
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority3204/09/2026
NYC Department of Education203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
B4 Architecture503/05/2026
Solid Engineering111/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Stanco System Electrical ContElectrical203/21/2026
WDFScaffold203/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Stanco System Electrical ContElectrical103/22/2026
High Beam ElectricElectrical103/21/2026
WDFGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Municipal Testing Laborat230503/05/2026
Building Lifecycle
All (108)Filed (6)Permit Issued (3)Violation (71)Objection (9)Special Inspection (8)
03/28/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
STEPHEN LATUS
03/12/2026
Failure to maintain building in code-compliant manner. Noted: there isexcessive and illegal storage in the gas and electric meter room. No storage…
ECB violation · open
03/12/2026
Re-issue #35692203H. Failure to maintain building in code-compliant manner. Noted: at the cafeteria, the columns at side wall, there are severe…
ECB violation · open
03/12/2026
Re-issue #35692204J. Failure to maintain building in code-compliant manner. Noted: there are several leaks in roofing that effect many areasand…
ECB violation · open
03/12/2026
Failure to maintain building in code-compliant manner. Illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. Noted:…
ECB violation · open
03/12/2026
Failure to maintain building in code-compliant manner. Noted: the gatein the chain link fence outside of exit #4 at exposure 1 is broken andcan not…
ECB violation · open
03/05/2026
Filed — Alteration
PS R038, INSTALLATION OF A 3,500-GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHALF OF THE CONTRACTOR UNDER AN EMERGENCY PROJECT WITH NYC SCA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01312821-P1
03/05/2026
Filed — Alteration
PS R038, INSTALLATION OF A 3,500-GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHALF OF THE CONTRACTOR UNDER AN EMERGENCY PROJECT WITH NYC SCA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01312821-P2
03/04/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
03/04/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
STEPHEN LATUS
03/04/2026
Special inspection requirement — Chimneys and vents
STEPHEN LATUS
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
STEPHEN LATUS
03/04/2026
Special inspection requirement — Final
STEPHEN LATUS
02/13/2026
ADM-02-03: Failed to produce approval from the Department of Buildings for design and installation of material, device, equipment, system,…
FDNY_ORDER violation · closed
02/13/2026
GP-40: Failed to produce and/or maintain at the premises valid Affidavit of Flame-Retardant Treatment for curtains, draperies, hangings and/or…
FDNY_ORDER violation · closed
12/29/2025
Permit issued — Boiler Equipment
S01312821-S2-BE
12/26/2025
Permit issued — Mechanical Systems
S01312821-I1-MS
12/17/2025
Objection resolved — Addressed
12/15/2025
Permit issued — Construction Fence
S01311822-I1-FN
12/05/2025
Objection resolved — Addressed
12/01/2025
Objection raised — Other
11/21/2025
Filed — Alteration
PS R038, INSTALLATION OF A 3,500-GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHALF OF THE CONTRACTOR UNDER AN EMERGENCY PROJECT WITH NYC SCA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01312821-S2
11/17/2025
Objection raised — Other
11/17/2025
Objection raised — Admin
11/12/2025
Filed — Alteration
PS R038, INSTALLATION OF A 3,500-GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHALF OF THE CONTRACTOR UNDER AN EMERGENCY PROJECT WITH NYC SCA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01312821-I1
11/12/2025
Filed — Alteration
PS R038, INSTALLATION OF A 3,500-GALLON OIL TANK CONNECTED TO A MOBILE BOILER TRAILER SUBMITTING ON BEHALF OF THE CONTRACTOR UNDER AN EMERGENCY PROJECT WITH NYC SCA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01312821-S1
11/12/2025
Objection raised — Admin
11/12/2025
Objection resolved — Resolved
11/12/2025
Objection resolved — Addressed
11/07/2025
Objection raised — Other
11/03/2025
Filed — Alteration
RED DOT EMERGENCY WORK - Installation of Temporary Fence for the installation of temporary Boiler
S01311822-I1
11/03/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
STEPHEN LATUS
10/17/2025
Boiler inspection report filed
Initial · no defects · Accepted
03/04/2025
Failure to maintain building in code compliant manner.noted:at t.o.i.,observed in cafeteria,one of the support columns at side wall has severe…
ECB violation · open
03/04/2025
Failure to maintain building in code compliant manner.noted:at t.o.i.,observed the roof leaks into rooms#33 and 38,the kitchen,all purpose room,and…
ECB violation · open
01/28/2025
ADM-02-01: Failed to provide a Certificate of Occupancy or other authorization or approval issued by the Department of Building or other agency…
FDNY_ORDER violation · closed
09/04/2024
Boiler inspection report filed
Initial · no defects · Accepted
06/22/2023
FES-02-01: Failed to obtain approval from Fire Department for special hazard fire extinguishing system listed in the comments, in violation of…
FDNY_ORDER violation · closed
04/18/2023
Boiler inspection report filed
Initial · no defects · Accepted
07/27/2022
Failure to maintain building in code compliant manner. Observed at t.o.i. There is excessive display of combustible materials throughout theschool.…
ECB violation · closed
07/27/2022
Re-issue#35584210H failure to maintain building in code compliant manner. Observed at t.o.i. The windows in rms:21,22,24,36,38,37 and 40 arestill…
ECB violation · closed
04/20/2022
Boiler inspection report filed
Initial · no defects · Accepted
07/09/2021
Failure to maintain bldg in codecompliant manner.observed@tsi ceiling in cafeteria leaked from rainwater.leak drips down right onto where tables…
ECB violation · closed
07/09/2021
Reissue 35495342P failure to maintain.observed@toi several windows in RMS21,22,24,36,38,37,40 arent working properly or arent operational@all.some…
ECB violation · closed
07/09/2021
Failure to maintain bldg in codecompliant manner.observed@toi several emergency lights werent operational when tested.location of nonworkinglights…
ECB violation · closed
03/18/2021
Boiler inspection report filed
Initial · no defects · Accepted
05/27/2020
Reissue#35465310N failure to maintain bldg. Observed at time of inspection,several windows in room #'s 21,22,24,36,38,37,40,are not working…
ECB violation · closed
04/02/2020
Boiler inspection report filed
Initial · no defects · Accepted
12/20/2019
Failure to maintain building in code compliant manner. Noted:at time of inspection several windows in room#'s 21,22,24,36,38,37 and 40 are no…
ECB violation · closed
07/17/2019
Boiler inspection report filed
Initial · no defects · Accepted
07/17/2019
Boiler inspection report filed
Initial · no defects · Pre-filing
07/13/2018
Boiler inspection report filed
Initial · no defects · Accepted
04/19/2018
Boiler inspection report filed
Subsequent · no defects · Accepted
08/11/2017
Boiler inspection report filed
Initial · defects found · Accepted
04/24/2014
Corridor width. Throughout 1ST floor bldg, hallway width reduced by chairs,book shelves & desk & chairs. Remedy: remove obstructions & keep hallway…
ECB violation · closed
05/16/2013
Sec. 27-766 reissue 34987889N no fresh air ventilation gas meter room (original bldg) remedy: provide ventilation.
ECB violation · closed
05/16/2013
Room #28 (gas meter & fan room) used for storage of school maintenanceequipment & supplies. Note: school has 2 rooms w/gas meters. Remedy:…
ECB violation · closed
07/19/2012
Sec. 27-766. Reissue 34927732K. No fresh air vent provided for gas meter rm. Remedy: provide fresh air vent.
ECB violation · closed
07/19/2012
Reissue 34927733M. At exit 2 doors drag on saddle and at cafeteria rm 19 door racked. Remedy: repair/replace doors.
ECB violation · closed
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Petro—
DOB NOW—WDF—
DOB NOW—WDF—
BIS—Biltmore General Contractors—
BIS—Franco Belli P&H & Sons—
BIS—Biltmore General Contractors—
BIS—Franco Belli P&H & Sons—
BIS—Biltmore General Contractors—
BIS—Biltmore General Contractors—
BIS—Metropolitan Enterprises—
BIS—Biltmore General Contractors—
BIS—HI-Tech Bridging—
BIS—Deborah Bradley Construction—
BIS—Champion Combustion—
BIS—Dynamic Contracting—
BIS—Ism Electric—
BIS—Kafka Construction—
BIS—Varsity Plumbing and Heating—
BIS—Kafka Construction—
BIS—BH Plumbing and Heating—
BIS—Dixie Construction—
BIS—Dixie Construction—
BIS—Core Industries—
BIS—Reliable Plumbing & Heating—
BIS—WWC—
BIS—Lund Fire Products Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026S01311822-I1Request the plans ↗
08/17/2026S01312821-P2Request the plans ↗
08/17/2026S01312821-P1Request the plans ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026S01312821-S1Open ↗
08/17/2026S01312821-I1Open ↗
08/17/2026S01312821-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S01312821-S2Open ↗
08/24/2026S01312821-P1Open ↗
08/23/2026S01312821-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026S01312821-P1Open ↗
08/24/2026S01312821-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026S01311822-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01312821-P1Open ↗
08/15/2026S01312821-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026S01312821-P1Open ↗
08/13/2026S01312821-P2Open ↗
08/13/2026S01312821-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/13/2026S01311822-I1Open ↗
08/13/2026S01312821-P2Open ↗
08/13/2026S01312821-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents6
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal6
08/13/2026S01312821-P1Open ↗
08/13/2026S01312821-S2Open ↗
08/13/2026S01312821-I1Open ↗
Showing 3 of 6 on file for this type