← Back
Two stories - detached, small or mid-size
4211 AVENUE I
BROOKLYN · Flatlands · BIN 3214057
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4Zoning
1,488 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,600 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/31/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/27/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01086212-I1
08/12/2024
Permit issued — Solar
B01086212-I1-SL
07/31/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01086212-I1
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/25/2024
Special inspection requirement — Final
Walid Abdulla
07/25/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/12/2024
1 project · most recent 07/31/2024
FiledStatusContractorScope
07/31/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/25/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/25/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/25/2024Energy Code Compliance InspectionsWalid Abdullaprogress
07/25/2024FinalWalid Abdullaprogress
07/25/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026B01086212-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B01086212-I1Open ↗
08/23/2026B01086212-I1Open ↗
08/23/2026B01086212-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01086212-I1Open ↗
08/23/2026B01086212-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01086212-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01086212-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01086212-I1Open ↗