← Back
Primarily 2 family with 1 store or office
4213 8 AVENUE
BROOKLYN · BIN 3018374
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6Zoning
3,231 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 4213 8TH AVE LLC · 1,830 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 34p · 1 filing · 16 docs
Floor 22p · 1 filing · 16 docs
Floor 13p · 1 filing · 12 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THYAGO307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2025$1.5M—Private party → 4213 8TH AVE LLC$458/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMIREZ ENGINEERING PLLC112/01/2025
BASSIRI1411/14/2025
LEON SKVIRSKY PE210/30/2025
HUAN DESIGN INC.210/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO2803/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing207/08/2026
J & R CONTRACTORS SERVICEGeneral Contractor107/08/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
RIVIERA ELECT BROS CORPElectrical103/22/2026
PAUL SIGNS INCGeneral Contractor104/09/2026
PAUL SIGNSScaffold107/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAMIREZ ENGINEERING PLLC8679112/01/2025
AG ENGINEERING PLLC8899110/30/2025
BASSIRI8394410/06/2025
HUAN DESIGN INC7669210/04/2024
Building Lifecycle
All (87)Filed (19)Permit Issued (7)Signed Off (7)Violation (10)Inspection (6)Objection (16)Special Inspection (22)
05/07/2026
Signed off — Alteration
PROPOSE TO INSTALL TWO STEEL LINTELS AND PROVIDE A WALL OPENING WITH A 3-HR RATED ROLL DOWN GATE WITH FUSIBLE LINKS AS PER PLANS SUBMITTED HEREWITH.
B01323344-I1
04/20/2026
Permit issued — General Construction
B01323344-I1-GC-CX
04/03/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Amauris Ramirez
02/03/2026
Objection raised — Scope
02/03/2026
Objection raised — Scope
02/03/2026
Objection raised — Structural
02/03/2026
Objection raised — Structural
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/14/2026
Objection resolved — Addressed
01/02/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ADA RESTROOM IN FIRST FLOOR. NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01245424-I1
01/02/2026
Signed off — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246269-I1
01/02/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01245421-I1
12/10/2025
Signed off — Alteration
B01296126-I1
12/09/2025
Signed off — Alteration
INSTALL STOREFRONT AWNING WITH NO COPY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01296109-I1
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Scope
12/02/2025
Objection raised — Admin
12/01/2025
Filed — Alteration
PROPOSE TO INSTALL TWO STEEL LINTELS AND PROVIDE A WALL OPENING WITH A 3-HR RATED ROLL DOWN GATE WITH FUSIBLE LINKS AS PER PLANS SUBMITTED HEREWITH.
B01323344-I1
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Amauris Ramirez
11/24/2025
Violation issued (HPD, open)
I
11/21/2025
Special inspection requirement — Structural Steel - Details
Amauris Ramirez
11/21/2025
Special inspection requirement — Final
Amauris Ramirez
11/21/2025
Special inspection requirement — Masonry
Amauris Ramirez
11/14/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ADA RESTROOM IN FIRST FLOOR. NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01245424-P5
11/14/2025
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246269-P3
11/10/2025
Permit issued — General Construction
B01296109-I1-GC
11/07/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/31/2025
Permit issued — Sign
B01296126-I1-SG
10/31/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/30/2025
Filed — Alteration
B01296126-I1
10/30/2025
Filed — Alteration
INSTALL STOREFRONT AWNING WITH NO COPY. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01296109-I1
10/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/06/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ADA RESTROOM IN FIRST FLOOR. NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01245424-P4
10/06/2025
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246269-P2
10/06/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01245421-P3
10/06/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ADA RESTROOM IN FIRST FLOOR. NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01245424-P3
08/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/22/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ADA RESTROOM IN FIRST FLOOR. NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01245424-P2
08/22/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01245421-P2
08/22/2025
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01246269-P1
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/11/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01245421-P1
07/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & R CONTRACTORS SERVICE04/20/2026
DOB NOWGeneral ConstructionSigned-offPAUL SIGNS INC11/10/2025
DOB NOWSignSigned-offPAUL SIGNS, INC10/31/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC07/02/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC07/02/2025
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC07/02/2025
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/23/2024
3 projects · most recent 11/18/2025
General Wiring
FiledStatusContractorScope
11/18/2025Permit IssuedLIMITLESS ELECT RESOURCES—
07/18/2025CompleteKJK ELECTRIC INCGeneral Wiring
05/19/2025Permit IssuedRIVIERA ELECT BROS CORPGeneral Wiring
1 project · most recent 12/01/2025
Steel Masonry
FiledStatusContractorScope
12/01/2025Signed-offJ & R CONTRACTORS SERVICESteel, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/07/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/19/2026Structural Stability – Alterations of existing buildingsAmauris Ramirezspecial
12/01/2025Tenant Protection Plan ComplianceAmauris Ramirezspecial
11/21/2025Structural Steel - DetailsAmauris Ramirezspecial
11/21/2025FinalAmauris Ramirezprogress
11/21/2025MasonryAmauris Ramirezspecial
10/07/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/07/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/07/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/06/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/06/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/06/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/20/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/20/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/20/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/11/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/11/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/11/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/04/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/04/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
10/03/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/03/2024FinalZHENHUAN XUprogress
10/03/2024Chimneys and ventsZHENHUAN XUspecial
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/23/2026B01121146-I1Request digital key ↗
08/23/2026B01121146-S1Request digital key ↗
08/21/2026B01245424-P5Request digital key ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/21/2026B01245424-P1Open ↗
08/21/2026B01245424-P5Open ↗
08/21/2026B01245424-P4Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/26/2026B01121146-I1Open ↗
09/26/2026B01121146-I1Open ↗
09/01/2026B01245421-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026B01121146-I1Open ↗
09/01/2026B01245421-P3Open ↗
08/31/2026B01245421-P1Open ↗
Showing 3 of 6 on file for this type