← Back
Two family converted from one family
4214 WICKHAM AVENUE
BRONX · Wakefield-Woodlawn · BIN 2068794
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4AZoning
1,344 sfGross Floor Area
2Units
Two family converted from one family · 2,379 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/05/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
11/12/2025
Permit issued — Solar
X01311385-I1-SL
11/05/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01311385-I1
11/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/30/2025
Special inspection requirement — Final
Walid Abdulla
10/30/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/12/2025
1 project · most recent 04/08/2026
General Wiring
FiledStatusContractorScope
04/08/2026Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 11/05/2025
FiledStatusContractorScope
11/05/2025Signed-offSUNRUN INSTALLATION SVC40 panels, 16.4 kw, 420 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/05/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/30/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/30/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/30/2025FinalWalid Abdullaprogress
10/30/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026X01311385-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/19/2026X01311385-I1Open ↗
09/19/2026X01311385-I1Open ↗
09/19/2026X01311385-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/19/2026X01311385-I1Open ↗
09/19/2026X01311385-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01311385-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01311385-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026X01311385-I1Open ↗