ECB11/20/2025AS PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 08/08/2025 BY BADGE 3226 FOR A STRUCTURE ERECTED AT REAR ATTACHED TO THE BUILDING, THERE IS NO PERMIT IN DEPT RECORDS FOR THIS WORK ., OBTAIN ALL PERMITS$6K due
ECB11/20/2025FENCE EXCEEDS REQUIRED HEIGHT OF 4 FEET. NOTED : AT TIME OF INSPECTION ,OBSERVED AT EXPOSURE 2 ,SHARED DRIVEWAY ,THE FENCE IS 7 FEET ,WHICH EXCEEDS THE REQUIRED HEIGHT OF 4 FEET ., CONFORM FENCE TO HEIGHT REQUI$500 due
Two stories - detached, small or mid-size · 1,620 sf lot · 0.78 FAR built · Flood zone X