← Back
Primarily 5-6 family with 1 store or office
422 ST MARKS PLACE
STATEN ISLAND · BIN 5000206
💬 Discuss this project
2023Year Built
—Stories
S5Building Class
C4-2Zoning
4,108 sfGross Floor Area
6Units
0 Open ViolationsFDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 422 ST. MARKS PLACE PARTNERS LLC · 2,040 sf lot · 2.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 20 docs
Floor 4Under Construction13p · 1 filing · 20 docs
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVC GENERAL CONTRACTING3109/24/2026
YONA LOVE CONSULTING SERVICES806/28/2026
J G CONSTRUCTION SRVCS404/09/2026
RELIABLE ENTERPRISES904/09/2026
402 ST MARKS PLACE403/21/2026
402 ST MARKS PLACE PARTNERS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS1009/16/2026
ASHRAF CORP101/03/2025
MJE PROFESSIONAL SERVICES208/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCH-FORM DESIGN BUILD1403/21/2026
KC EXPEDITING203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVC GENERAL CONTRACTING LGeneral Contractor1709/24/2026
RELIABLE ENTERPRISES INCGeneral Contractor404/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
BIG APPLE AIR INCGeneral Contractor107/04/2026
J & G CONSTRUCTION SVCSGeneral Contractor104/09/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
NEU, RICHARDElectrical103/21/2026
PETER CATANZARO IIIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MTD GROUP INSPECTIONS,INC9388609/16/2026
JIAN ENGINEERING PLLC7397108/25/2023
Building Lifecycle
All (84)Filed (13)Permit Issued (19)Signed Off (2)Violation (6)Inspection (13)Objection (1)Special Inspection (30)
09/23/2026
Permit issued — Structural
S00612758-S1-GC-CX
09/22/2026
Permit issued — Earth Work
S00612758-S1-EA
09/17/2026
Special inspection requirement — Mechanical Systems
Tommaso Di Gesaro
09/17/2026
Special inspection requirement — Final
MICHAEL DERUVO
09/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Tommaso Di Gesaro
09/17/2026
Special inspection requirement — Shutoff dampers
Tommaso Di Gesaro
09/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL DERUVO
09/17/2026
Special inspection requirement — Ventilation and air distribution system
MICHAEL DERUVO
09/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Tommaso Di Gesaro
09/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Tommaso Di Gesaro
09/16/2026
Filed — New Building
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW TYPE I GREASE EXHAUST HOOD IN EXISTING COMMERCIAL SPACE. INSTALL HOOD, GREASE DUCT, ROOFTOP UTILITY SET EXHAUST FAN AND ASSOCIATED GREASE DUCT WITH CLEAN-OUT DOORS PER IMC 2024 SECTION 506.3.8, ROOF
S00612758-P7
08/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/24/2026
Special inspection requirement — Final
MICHAEL DERUVO
08/24/2026
Special inspection requirement — Mechanical Systems
Tommaso Di Gesaro
08/24/2026
Special inspection requirement — Ventilation and air distribution system
MICHAEL DERUVO
08/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL DERUVO
08/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/24/2026
Special inspection requirement — Shutoff dampers
07/02/2026
Permit issued — Mechanical Systems
S00612758-S7-MS
06/26/2026
Signed off — Alteration
S00429756-I1
06/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/22/2026
Permit issued — Sprinklers
S00612758-S5-EW-SP
04/30/2026
Permit issued — Plumbing
S00612758-S4-PL
03/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/19/2026
Filed — New Building
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW TYPE I GREASE EXHAUST HOOD IN EXISTING COMMERCIAL SPACE. INSTALL HOOD, GREASE DUCT, ROOFTOP UTILITY SET EXHAUST FAN AND ASSOCIATED GREASE DUCT WITH CLEAN-OUT DOORS PER IMC 2024 SECTION 506.3.8, ROOF
S00612758-S7
01/05/2026
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
S01159018-I1
11/20/2025
Objection raised — Admin
11/07/2025
Special inspection requirement — Sprinkler Systems
Tommaso Di Gesaro
11/06/2025
Filed — New Building
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW TYPE I GREASE EXHAUST HOOD IN EXISTING COMMERCIAL SPACE. INSTALL HOOD, GREASE DUCT, ROOFTOP UTILITY SET EXHAUST FAN AND ASSOCIATED GREASE DUCT WITH CLEAN-OUT DOORS PER IMC 2024 SECTION 506.3.8, ROOF
S00612758-P5
11/06/2025
Filed — New Building
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW TYPE I GREASE EXHAUST HOOD IN EXISTING COMMERCIAL SPACE. INSTALL HOOD, GREASE DUCT, ROOFTOP UTILITY SET EXHAUST FAN AND ASSOCIATED GREASE DUCT WITH CLEAN-OUT DOORS PER IMC 2024 SECTION 506.3.8, ROOF
S00612758-P2
11/06/2025
Filed — New Building
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A NEW TYPE I GREASE EXHAUST HOOD IN EXISTING COMMERCIAL SPACE. INSTALL HOOD, GREASE DUCT, ROOFTOP UTILITY SET EXHAUST FAN AND ASSOCIATED GREASE DUCT WITH CLEAN-OUT DOORS PER IMC 2024 SECTION 506.3.8, ROOF
S00612758-P4
11/06/2025
Permit issued — Construction Fence
S00429756-I1-FN
11/06/2025
Special inspection requirement — Sprinkler Systems
Tommaso Di Gesaro
10/17/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/13/2025
Permit issued — Foundation
S00612758-I1-GC-CX
08/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2025
Permit issued — Sprinklers
S00612758-S5-EW-SP
04/24/2025
Permit issued — Plumbing
S00612758-S4-PL
03/27/2025
Permit issued — Sidewalk Shed
S01051241-I1-SH
01/27/2025
Violation issued (ECB, closed)
Construction
01/06/2025
Permit issued — Supported Scaffold
S01159018-I1-SF
01/03/2025
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
S01159018-I1
12/06/2024
Permit issued — Construction Fence
S00429756-I1-FN
09/11/2024
Permit issued — General Construction
S00612758-I1-GC-CX
08/29/2024
Filed — Alteration
S01051241-P1
07/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2024
Filed — Alteration
S01051241-I1
05/16/2024
Permit issued — Sidewalk Shed
S01051241-I1-SH
05/02/2024
Violation issued (ECB, closed)
Construction
05/02/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAVC GENERAL CONTRACTING L09/23/2026
DOB NOWEarth WorkSigned-offAVC GENERAL CONTRACTING L09/22/2026
DOB NOWMechanical SystemsPermit IssuedBIG APPLE AIR INC07/02/2026
DOB NOWSprinklersPermit IssuedEXPERT FIRE SPRINKLER,LLC05/22/2026
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC04/30/2026
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L11/06/2025
DOB NOWFoundationPermit IssuedAVC GENERAL CONTRACTING L08/13/2025
DOB NOWSprinklersPermit IssuedBLETSAS P&H CORP06/11/2025
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC04/24/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/27/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS01/06/2025
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L12/06/2024
DOB NOWGeneral ConstructionPermit IssuedAVC GENERAL CONTRACTING L09/11/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC05/16/2024
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L01/05/2024
DOB NOWEarth WorkPermit IssuedAVC GENERAL CONTRACTING L09/14/2023
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L01/31/2023
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L02/26/2022
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L01/29/2021
1 project · most recent 09/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/16/2026Permit IssuedAVC GENERAL CONTRACTING LHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-HPR24-230VO 24,000 BTU · Heat Pump Outdoor ×4
CH-R28MES-230VO 28,000 BTU · Heat Pump Outdoor ×1
CH-RHP48LCU-230VO 48,000 BTU · Heat Pump Outdoor ×1
CH‑HPR36M‑230VO 36,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck DGX-P112-H12-MF , USF-16-3-B7-00-02-02 2,336 CFM · Makeup Air ×2
USF-16-3-B7-00-02-02 2,812 CFM · Exhaust Fan ×2
1 project · most recent 09/16/2026
Sprinkler System
FiledStatusContractorScope
09/16/2026Permit IssuedEXPERT FIRE SPRINKLER,LLCSprinkler System
1 project · most recent 09/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/16/2026Permit IssuedAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
3 projects · most recent 05/12/2025
General Wiring
FiledStatusContractorScope
05/12/2025CompletePETER J. CATANZARO, INC.General Wiring
05/16/2024Permit IssuedRICHARD NEU—
06/17/2021CompleteR.C.M. ELECTRIC CORP.General Wiring
1 project · most recent 09/16/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/16/2026Permit IssuedAVC GENERAL CONTRACTING LSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
09/17/2026Mechanical SystemsTommaso Di Gesarospecial
09/17/2026FinalMICHAEL DERUVOprogress
09/17/2026HVAC-R and service water piping design and insulationTommaso Di Gesaroenergy_progress
09/17/2026Shutoff dampersTommaso Di Gesaroenergy_progress
09/17/2026Duct leakage testing, insulation and designMICHAEL DERUVOenergy_progress
09/17/2026Ventilation and air distribution systemMICHAEL DERUVOenergy_progress
09/17/2026HVAC-R and service water heating equipmentTommaso Di Gesaroenergy_progress
09/17/2026HVAC-R and service water heating system controlsTommaso Di Gesaroenergy_progress
08/24/2026HVAC-R and service water piping design and insulation—energy_progress
08/24/2026FinalMICHAEL DERUVOprogress
08/24/2026Mechanical SystemsTommaso Di Gesarospecial
08/24/2026Ventilation and air distribution systemMICHAEL DERUVOenergy_progress
08/24/2026HVAC-R and service water heating system controls—energy_progress
08/24/2026Duct leakage testing, insulation and designMICHAEL DERUVOenergy_progress
08/24/2026HVAC-R and service water heating equipment—energy_progress
08/24/2026Shutoff dampers—energy_progress
11/07/2025Sprinkler SystemsTommaso Di Gesarospecial
11/06/2025Sprinkler SystemsTommaso Di Gesarospecial
08/25/2023Footing and FoundationJIAN DENGprogress
08/25/2023Insulation placement and R valuesMICHAEL DERUVOenergy_progress
08/25/2023Structural Steel - DetailsJIAN DENGspecial
08/25/2023FinalJIAN DENGprogress
08/25/2023MasonryJIAN DENGspecial
08/25/2023Structural Cold-Formed SteelJIAN DENGspecial
05/05/2023Insulation placement and R valuesMICHAEL DERUVOenergy_progress
Latest 25 of 54.
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/21/2026S01051241-I1Request digital key ↗
08/21/2026S01051241-P1Request digital key ↗
08/20/2026S01159018-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026S00429756-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
01/19/2021540194886Open ↗
12/07/2020520460983Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
02/09/2021540194886Open ↗
01/19/2021540194886Open ↗
▸BISWORK PERMIT APPLICATION1
06/04/2021520460983Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026S00612758-P2Open ↗
08/18/2026S00612758-I1Open ↗
08/13/2026S00612758-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/18/2026S00612758-I1Open ↗
08/18/2026S00612758-P2Open ↗
08/13/2026S00612758-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00612758-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/21/2026S00612758-P6Open ↗
09/21/2026S00612758-P7Open ↗
08/25/2026S00429756-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026S00612758-P7Open ↗
09/23/2026S00612758-P7Open ↗
09/23/2026S00612758-P7Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026S00612758-P7Open ↗
09/23/2026S00612758-S7Open ↗
09/01/2026S00612758-S1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/19/2021540194886Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/19/2021540194886Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/18/2026S00612758-P2Open ↗
08/18/2026S00612758-I1Open ↗
08/13/2026S00612758-S1Open ↗
Showing 3 of 4 on file for this type
▸BISGAS CUT-OFF1
06/04/2021520460983Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
06/04/2021520460983Open ↗
▸BISWATER CUT-OFF1
06/04/2021520460983Open ↗
▸BISELECTRIC CUT-OFF1
06/04/2021520460983Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/18/2026S00612758-P2Open ↗
08/18/2026S00612758-I1Open ↗
08/13/2026S00612758-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026S00612758-I1Open ↗
08/13/2026S00612758-S1Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/04/2021520460983Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/04/2021520460983Open ↗
▸BISRODENT CONTROL1
06/04/2021520460983Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00612758-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/18/2026S00612758-P2Open ↗
08/18/2026S00612758-I1Open ↗
08/13/2026S00612758-P3Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/19/2021540194886Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/19/2021540194886Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00612758-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
02/09/2021540194886Open ↗
01/19/2021540194886Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/04/2021520460983Open ↗
▸BISLANDMARKS SIGNOFF1
06/04/2021520460983Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/04/2021520460983Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
06/04/2021520460983Open ↗
12/07/2020520460983Open ↗
▸BISEFILING COVER SHEET1
12/07/2020520460983Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/19/2021540194886Open ↗
▸Other Documents25
▸BISLAA - Supporting Documentation12
06/04/2021520460983Open ↗
06/04/2021520460983Open ↗
06/04/2021520460983Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/18/2026S00612758-P2Open ↗
08/18/2026S00612758-I1Open ↗
08/13/2026S00612758-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/18/2026S00612758-P2Open ↗
08/18/2026S00612758-I1Open ↗
08/13/2026S00612758-P3Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026S00612758-S1Open ↗
08/13/2026S00612758-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00612758-S1Open ↗
08/13/2026S00612758-P2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/19/2021540194886Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026S00612758-I1Open ↗