| Owner | Filings | Most Recent |
|---|---|---|
| SOLSTICE RESIDENTIAL GROUP | 10 | 09/01/2026 |
| KINGS GROUP NY | 3 | 07/10/2026 |
| DOUGLASS ELLIMAN | 45 | 07/08/2026 |
| RELIABLE ENTERPRISES | 9 | 03/22/2026 |
| 423-443 TENANTS | 87 | 03/22/2026 |
| TOM | 1 | 03/22/2026 |
| 423-443 ATLANTIC TENANTS CORP | 7 | 03/21/2026 |
| 423 TENANTS ASSOCIATION | 1 | 03/21/2026 |
| CENTURY MANAGEMENT SERVICES | 1 | 03/21/2026 |
| DOUGLAS ELLIMAN PROPERTY MNGMT | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| BERTOLINI ARCHITECTURAL WORKS, DPC | 2 | 08/11/2026 |
| LAST DESIGN BUILD LLC | 4 | 08/10/2026 |
| CORTNEY WALLESTON ARCHITECT, PC | 2 | 07/14/2026 |
| SETH P. ROYE ARCHITECT PC | 2 | 04/28/2026 |
| NAVKIRAN CHEEMA | 1 | 04/16/2026 |
| JENNIFER CRAMM ARCHITECT PLLC | 3 | 09/16/2025 |
| TABRIZ GROUP ENTERPRISES | 1 | 08/29/2025 |
| CHRISTOPHER TEETER | 4 | 03/25/2025 |
| STAVROS I. MALLIAROS, P.E., P.C. | 1 | 04/04/2024 |
| ATELIER GOUX ARCHITECTURE PLLC | 6 | 08/18/2023 |
| JEFFREY KAMEN ARCHITECT | 4 | 04/20/2023 |
| ANDREW HERDEG | 1 | 07/05/2022 |
| GABOR SZAKAL CONSULTING ENGINEERS | 4 | 06/09/2022 |
| SPIELER BOEHMKE ARCHITECTS PLLC | 3 | 03/11/2022 |
| ENTHINK ENGINEERS LLC | 2 | 07/23/2021 |
| ABS ENGINEERING, PLLC | 1 | 05/26/2021 |
| MANIFOLD ARCHITECTURE STUDIO PLLC | 2 | 05/14/2021 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 04/07/2021 |
| RICHARD H BALSER, P.E. | 2 | 04/05/2021 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 1 | 04/05/2021 |
| MALETZ DESIGN | 1 | 09/24/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| CHRISTOPHER TEETER RA | 8 | 03/21/2026 |
| ANZALONE ARCHITECTURE | 8 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| BERTOLINI ARCHITECTURAL WORKS DPC | 2 | 03/21/2026 |
| DVA Advisors | 4 | 03/21/2026 |
| GM CONSULTING SERVICES GROUP | 2 | 03/21/2026 |
| BAY RESTORATION | 4 | 03/21/2026 |
| EPAC BUILDING CONSULTING INC | 2 | 03/21/2026 |
| S M EXPEDITING | 2 | 03/21/2026 |
| CODE | 12 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TCM CORPORATION | General Contractor | 15 | 03/21/2026 |
| RED OAK RENOVATIONS CORP | General Contractor | 7 | 07/08/2026 |
| SYNC CONSTRUCTION LLC | General Contractor | 6 | 03/21/2026 |
| RELIABLE ENTERPRISES INC | General Contractor | 6 | 03/21/2026 |
| JOHN FITZGERALD PLBG &HTG | Plumbing | 5 | 07/08/2026 |
| BAY RESTORATION CORP | General Contractor | 4 | 07/08/2026 |
| PRESTIGE RENOVATION GROUP | General Contractor | 4 | 07/08/2026 |
| RRP PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| UNICORN BUILDERS GROUP LL | General Contractor | 2 | 07/08/2026 |
| J&S WATERPROOFING LLC | General Contractor | 2 | 07/08/2026 |
| WHITE LEAF MECHANICAL COR | General Contractor | 2 | 03/21/2026 |
| KINGS GROUP NY CORP | General Contractor | 2 | 07/10/2026 |
| KJK ELECTRIC INC | Electrical | 2 | 03/22/2026 |
| P.H. WORKS INC | Plumbing | 2 | 07/08/2026 |
| PASSEGGIO PLBG & HTG CORP. | Plumbing | 1 | 07/08/2026 |
| VSP MECHANICAL INC | Plumbing | 1 | 07/08/2026 |
| CHRIS ALL AROUND GEN CONT | Electrical | 1 | 03/21/2026 |
| XH&RC PLBG AND HTG INC | Plumbing | 1 | 03/22/2026 |
| DOWLING, KENNETH | Electrical | 1 | 03/21/2026 |
| FERGUS PLUNKETT | Electrical | 1 | 03/21/2026 |
| HUDSON SCENIC STUDIO | Electrical | 1 | 03/21/2026 |
| IVAN DUBBS | Electrical | 1 | 03/21/2026 |
| PORTER, LLOYD | Electrical | 1 | 03/21/2026 |
| UPDATE SYSTEMS ELECTRICAL | Electrical | 1 | 03/22/2026 |
| WM KIRBY PLBG & HTG CO | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLANTIC ENGINEERINGLABOR | 1381 | 2 | 08/11/2026 |
| CORTNEY WALLESTON ARCHITE | 3881 | 1 | 06/09/2026 |
| SAG ENGINEERING & CONSULT | 608 | 2 | 04/28/2026 |
| SETH P ROYE ARCHITECT PC | 8554 | 2 | 04/28/2026 |
| MUNICIPAL TESTING LABORAT | 230 | 3 | 09/16/2025 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 07/09/2025 |
| ASSURE PROFESSIONAL ENGIN | 6962 | 4 | 03/25/2025 |
| AVT ENGINEERING | 345 | 2 | 08/18/2023 |
| ACE STRUCTURAL ENGINEERIN | 496 | 4 | 04/20/2023 |
| SPECIAL TESTING & CONSULT | 1688 | 2 | 06/09/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | KINGS GROUP NY CORP | 07/08/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | J&S WATERPROOFING LLC | 06/22/2026 |
| DOB NOW | General Construction | Permit Issued | J&S WATERPROOFING LLC | 06/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNICORN BUILDERS GROUP LL | 06/04/2026 |
| DOB NOW | General Construction | Permit Issued | J&S WATERPROOFING LLC | 06/03/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | KINGS GROUP NY CORP | 04/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | J&S WATERPROOFING LLC | 04/01/2026 |
| DOB NOW | Plumbing | Permit Issued | VSP MECHANICAL INC | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | UNICORN BUILDERS GROUP LL | 12/17/2025 |
| DOB NOW | General Construction | Signed-off | LA RENOVATIONS, LLC | 09/02/2025 |
| DOB NOW | Plumbing | Signed-off | RRP PLUMBING CORP | 09/02/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | BAY RESTORATION CORP | 07/08/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | BAY RESTORATION CORP | 07/08/2025 |
| DOB NOW | General Construction | Permit Issued | BAY RESTORATION CORP | 04/14/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | BAY RESTORATION CORP | 06/28/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | BAY RESTORATION CORP | 05/23/2024 |
| DOB NOW | General Construction | Permit Issued | BAY RESTORATION CORP | 04/11/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | BAY RESTORATION CORP | 04/10/2024 |
| DOB NOW | Plumbing | Signed-off | P.H. WORKS INC | 01/24/2024 |
| DOB NOW | Plumbing | Signed-off | JOHN FITZGERALD PLBG &HTG | 12/06/2023 |
| DOB NOW | General Construction | Signed-off | SYNC CONSTRUCTION LLC | 04/21/2023 |
| DOB NOW | Plumbing | Signed-off | P.H. WORKS INC | 01/30/2023 |
| DOB NOW | General Construction | Signed-off | PK & SONS HOME IMPROVEMEN | 01/25/2023 |
| DOB NOW | General Construction | Signed-off | PRESTIGE RENOVATION GROUP | 01/06/2023 |
| DOB NOW | Mechanical Systems | Signed-off | WHITE LEAF MECHANICAL COR | 01/06/2023 |
| DOB NOW | Plumbing | Signed-off | JOHN FITZGERALD PLBG &HTG | 12/07/2022 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 11/10/2022 |
| DOB NOW | Plumbing | Signed-off | ASTORIA P & H CORP | 10/27/2022 |
| DOB NOW | General Construction | Signed-off | SYNC CONSTRUCTION LLC | 10/25/2022 |
| DOB NOW | Mechanical Systems | Signed-off | PRESTIGE RENOVATION GROUP | 10/12/2022 |
| DOB NOW | Plumbing | Signed-off | JOHN FITZGERALD PLBG &HTG | 07/26/2022 |
| DOB NOW | General Construction | Signed-off | RED OAK RENOVATIONS CORP | 02/28/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | RED OAK RENOVATIONS CORP | 02/28/2022 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 01/08/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | RED OAK RENOVATIONS CORP | 12/17/2021 |
| DOB NOW | General Construction | Signed-off | RED OAK RENOVATIONS CORP | 12/16/2021 |
| DOB NOW | Plumbing | Signed-off | JOHN FITZGERALD PLBG &HTG | 12/02/2021 |
| DOB NOW | Mechanical Systems | Signed-off | TCM CORPORATION | 11/23/2021 |
| DOB NOW | Mechanical Systems | Signed-off | TCM CORPORATION | 11/15/2021 |
| DOB NOW | General Construction | Signed-off | TCM CORPORATION | 11/12/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/16/2025 | Permit Issued | UNICORN BUILDERS GROUP LL | Air Conditioning Systems | Cooling Mitsubishi Electric MLZ-KPI12NA2-UI 12,000 BTU · Fan Coil Indoor ×1 MSZ-GS09NA 9,000 BTU · Fan Coil Indoor ×1 MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×1 SB_PEAD-A18AA(8) 18,000 BTU · Vrf Indoor ×1 SB_PEAD-A24AA(8) 24,000 BTU · Vrf Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/10/2026 | Signed-off | RRP PLUMBING CORP | Gas, Water/Sanitary |
| 07/14/2026 | — | — | Gas, Water/Sanitary |
| 09/16/2025 | Permit Issued | VSP MECHANICAL INC | Gas, Water/Sanitary |
| 05/14/2021 | Signed-off | ASPECT PLBNG&HTNG CO LLC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | Permit Issued | FRIED ELECTRIC CO. | General Wiring |
| 04/07/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 08/29/2024 | Complete | P & Z ELECTRIC CORP | General Wiring |
| 04/23/2024 | Complete | VERTEX ELECTRIC CORP. | — |
| 01/11/2023 | Complete | BRANDL ELECTRIC INC. | General Wiring |
| 01/06/2023 | Complete | KJK ELECTRIC INC | General Wiring |
| 11/17/2022 | Permit Issued | UPDATE SYSTEMS ELECTRICAL | General Wiring |
| 11/07/2022 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 11/03/2022 | Complete | TWINTECH ELECTRIC INC | General Wiring |
| 04/18/2022 | Complete | KJK ELECTRIC INC | General Wiring |
| 01/19/2022 | Complete | P & Z ELECTRIC CORP | General Wiring |
| 07/23/2021 | Complete | RICHARD NEU | — |
| 10/28/2020 | Complete | ACCURATE ELEC'L CORP. | General Wiring |
| 10/21/2020 | Complete | PK ELECTRIC INC | — |
| 08/26/2020 | Complete | DENMAR ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2022 | Signed-off | PK & SONS HOME IMPROVEMEN | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/10/2026 | Signed-off | RRP PLUMBING CORP | Tenant Protection Plan 72 Hour |
| 09/16/2025 | Permit Issued | UNICORN BUILDERS GROUP LL | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2026 | Permit Issued | J&S WATERPROOFING LLC | Suspended Scaffold (SC) |
| 05/08/2024 | Permit Issued | BAY RESTORATION CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/20/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/13/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/22/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/17/2025 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 11/17/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 10/30/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/06/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/10/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/08/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/11/2023 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 08/07/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/02/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/18/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/05/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/04/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/22/2026 | Final | Seth Roye | progress |
| 04/22/2026 | Tenant Protection Plan Compliance | Chester Kowalski | special |
| 04/22/2026 | Fire-Resistant Penetrations and Joints | Seth Roye | special |
| 04/22/2026 | Masonry | Seth Roye | special |
| 04/22/2026 | Energy Code Compliance Inspections | Seth Roye | progress |
| 03/20/2026 | Fire-Resistant Penetrations and Joints | Cortney Walleston | special |
| 03/20/2026 | Lighting in dwelling units | Cortney Walleston | energy_progress |
| 03/20/2026 | Fire-Resistance Rated Construction | Cortney Walleston | progress |
| 02/03/2026 | Energy Code Compliance Inspections | Cortney Walleston | progress |
| 02/03/2026 | Final | Cortney Walleston | progress |
| 10/21/2025 | Tenant Protection Plan Compliance | — | special |
| 09/12/2025 | Post-installed Anchors | CLOUD LEE | special |
| 09/09/2025 | Tenant Protection Plan Compliance | CLOUD LEE | special |
| 09/09/2025 | Tenant Protection Plan Compliance | CLOUD LEE | special |
| 09/09/2025 | Tenant Protection Plan Compliance | CLOUD LEE | special |
| 09/05/2025 | Structural Stability – Alterations of existing buildings | Christopher O'Malley | special |
| 09/05/2025 | Final | OSVALDO BERTOLINI | progress |
| 09/05/2025 | Energy Code Compliance Inspections | OSVALDO BERTOLINI | progress |
| 08/18/2025 | Maintenance information | Jennifer Cramm | energy_progress |
| 08/18/2025 | HVAC-R and service water heating system controls | Jennifer Cramm | energy_progress |
| 08/18/2025 | HVAC-R and service water piping design and insulation | Jennifer Cramm | energy_progress |
| 08/18/2025 | HVAC-R and service water heating equipment | Jennifer Cramm | energy_progress |
| 08/18/2025 | Energy Code Compliance Inspections | Jennifer Cramm | progress |
| 08/18/2025 | Fire-Resistant Penetrations and Joints | CLOUD LEE | special |
| 08/12/2025 | Fire-Resistant Penetrations and Joints | CLOUD LEE | special |