← Back
BuildNYC
One family attached or semi-detached
423 EAST 135TH STREET
BRONX · Mott Haven-Port Morris · BIN 2000212
💬 Discuss this project
1901Year Built
3Stories
A5Building Class
R6Zoning
3,008 sfGross Floor Area
1Units
Rent Stabilized53 Active Violations ▸FDNY Report ↗
One family attached or semi-detached · Owner of record: 423 E 135th · 1,666 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 1 filing · 12 docs
Floor 2Under Construction2p · 1 filing · 12 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction2p · 2 filings · 15 docs
CellarUnder Construction2p · 1 filing · 12 docs
BasementUnder Construction2p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
423 E 135th403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/02/2024$695K—BRX GROUND 1 LLC → 423 E 135TH LLC$231/sf building
11/29/2017$500K—Private party → BRX GROUND 1 LLC$166/sf building
05/29/2015$450K—Private party → Private party$150/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ikra Consulting109/12/2026
Gerald Caliendo Architects202/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J. Caliendo R.A403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L J Electrical ServiceElectrical103/22/2026
Impact BuildersGeneral Contractor109/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519202/06/2025
Building Lifecycle
All (86)Filed (3)Permit Issued (1)Violation (60)Special Inspection (22)
09/12/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01458676-I1
09/01/2026
Permit issued — General Construction
X01170863-I1-GC-CX
08/17/2026
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/17/2026
Violation issued (ECB, open)
Construction
08/17/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/2026
Violation issued (HPD, open)
C
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
C
08/16/2026
Violation issued (HPD, open)
B
08/16/2026
Violation issued (HPD, open)
C
04/30/2026
Violation issued (HPD, closed)
A
09/10/2025
Violation issued (HPD, open)
B
06/05/2025
Violation issued (HPD, closed)
A
05/13/2025
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
05/13/2025
Special inspection requirement — Metering
JEFFREY BELL
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, open)
B
04/22/2025
Violation issued (HPD, open)
B
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, open)
B
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, open)
C
02/06/2025
Filed — Alteration CO
X01170863-S1
02/04/2025
Filed — Alteration CO
X01170863-I1
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
02/04/2025
Special inspection requirement — Interior lighting power
JEFFREY BELL
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
02/04/2025
Special inspection requirement — Permanent certificate
JEFFREY BELL
02/04/2025
Special inspection requirement — Maintenance information
JEFFREY BELL
02/04/2025
Special inspection requirement — Maintenance information
JEFFREY BELL
02/04/2025
Special inspection requirement — Lighting controls
JEFFREY BELL
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
02/04/2025
Special inspection requirement — Lighting in dwelling units
JEFFREY BELL
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
01/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFFREY BELL
01/31/2025
Special inspection requirement — Fenestration areas
JEFFREY BELL
01/31/2025
Special inspection requirement — Fenestration air leakage
JEFFREY BELL
01/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/23/2025
Violation issued (HPD, open)
B
01/23/2025
Violation issued (ECB, open)
Unknown
01/23/2025
Violation issued (ECB, open)
Construction
01/23/2025
Violation issued (ECB, open)
Construction
01/23/2025
Violation issued (HPD, open)
B
01/23/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
01/23/2025
Special inspection requirement — Final
NAVEEN KUMAR
11/25/2024
Violation issued (ECB, closed)
Construction
10/11/2024
Violation issued (HPD, open)
B
10/11/2024
Violation issued (HPD, open)
B
10/11/2024
Violation issued (HPD, open)
B
10/11/2024
Violation issued (HPD, open)
C
10/11/2024
Violation issued (HPD, closed)
C
10/11/2024
Violation issued (HPD, open)
C
10/11/2024
Violation issued (HPD, open)
C
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedImpact Builders09/01/2026
2 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025Permit IssuedL J Electrical ServiceGeneral Wiring
02/04/2025Permit IssuedL J Electrical ServiceGeneral Wiring
1 project · most recent 09/12/2026
Sidewalk Shed
FiledStatusContractorScope
09/12/2026——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/13/2025Air barrier - visual inspectionJEFFREY BELLenergy_progress
05/13/2025MeteringJEFFREY BELLenergy_progress
02/04/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
02/04/2025HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
02/04/2025Interior lighting powerJEFFREY BELLenergy_progress
02/04/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/04/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
02/04/2025HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
02/04/2025Permanent certificateJEFFREY BELLenergy_progress
02/04/2025Maintenance informationJEFFREY BELLenergy_progress
02/04/2025Maintenance informationJEFFREY BELLenergy_progress
02/04/2025Lighting controlsJEFFREY BELLenergy_progress
02/04/2025HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
02/04/2025Lighting in dwelling unitsJEFFREY BELLenergy_progress
02/04/2025HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
01/31/2025Fenestration and door U-factor and product ratingsJEFFREY BELLenergy_progress
01/31/2025Fenestration areasJEFFREY BELLenergy_progress
01/31/2025Fenestration air leakageJEFFREY BELLenergy_progress
01/31/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/31/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/23/2025Mechanical SystemsYounes Abouyaalaspecial
01/23/2025FinalNAVEEN KUMARprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
10/13/2026X01458676-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01170863-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026X01170863-S1Open ↗
08/23/2026X01170863-I1Open ↗
08/23/2026X01170863-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026X01170863-S1Open ↗
08/23/2026X01170863-I1Open ↗
08/23/2026X01170863-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
10/13/2026X01458676-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist3
10/13/2026X01458676-I1Open ↗
08/13/2026X01170863-I1Open ↗
08/13/2026X01170863-S1Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/13/2026X01170863-I1Open ↗
08/13/2026X01170863-S1Open ↗