← Back
One story - permanent living quarter
4239A DIGNEY AVENUE
BRONX · BIN 2068454
💬 Discuss this project
1930Year Built
1.5Stories
A2Building Class
R4-1Zoning
1,124 sfGross Floor Area
1Units
0 Open Violations
One story - permanent living quarter · 5,127 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Floor 22p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
132ND NY ST LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/13/2025$1.5M—— → —$1,311/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN606/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ELITE GC NY INCGeneral Contractor407/08/2026
POLANCO BROTHERS CORPGeneral Contractor303/21/2026
AUSTIN PLBG & HTG CO.INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOMA PROFESSIONAL ENGINEE8807506/03/2025
IP CONCRETE TESTING AND I6252202/04/2025
Building Lifecycle
All (99)Filed (6)Permit Issued (4)Signed Off (2)Violation (22)Inspection (7)Objection (28)Special Inspection (30)
06/12/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
06/12/2025
Special inspection requirement — Concrete - Cast-In-Place
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Subgrade Inspections
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Structural Wood Frame
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Final
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Footing and Foundation
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Interior lighting power
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Fenestration air leakage
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Permanent certificate
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Metering
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Insulation placement and R values
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Air barrier - visual inspection
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Fenestration areas
EBRAHIM HEKMAT
06/12/2025
Special inspection requirement — Electric vehicle service equipment requirements
EBRAHIM HEKMAT
06/11/2025
Objection resolved — Addressed
06/10/2025
Objection raised — Other
06/03/2025
Filed — Alteration CO
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling.
X00948434-P4
04/22/2025
Signed off — Alteration CO
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling.
X00948434-S2
03/24/2025
Signed off — Alteration
X01005396-I1
02/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
EBRAHIM HEKMAT
02/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EBRAHIM HEKMAT
02/11/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM HEKMAT
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
EBRAHIM HEKMAT
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
EBRAHIM HEKMAT
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EBRAHIM HEKMAT
02/11/2025
Special inspection requirement — Maintenance information
EBRAHIM HEKMAT
02/04/2025
Filed — Alteration CO
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling.
X00948434-P2
02/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM HEKMAT
02/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EBRAHIM HEKMAT
12/03/2024
Objection raised — Other
12/03/2024
Objection resolved — Addressed
11/23/2024
Filed — Alteration CO
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling.
X00948434-P1
11/21/2024
Permit issued — Construction Fence
X01005396-I1-FN
11/21/2024
Violation issued (ECB, closed)
Construction
11/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/01/2024
Permit issued — Plumbing
X00948434-S2-PL
10/01/2024
Filed — Alteration CO
installation of new gas fired equipment ,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling.
X00948434-S2
08/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Violation issued (ECB, closed)
Construction
05/29/2024
Permit issued — Structural
X00948434-I1-GC-CX
04/16/2024
Violation issued (ECB, closed)
Construction
02/22/2024
Objection resolved — Addressed
02/16/2024
Permit issued — Construction Fence
X01005396-I1-FN
02/15/2024
Filed — Alteration
X01005396-I1
02/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offELITE GC NY INC11/21/2024
DOB NOWPlumbingSigned-offAUSTIN PLBG & HTG CO.INC11/01/2024
DOB NOWStructuralPermit IssuedPOLANCO BROTHERS CORP05/29/2024
DOB NOWConstruction FenceSigned-offELITE GC NY INC02/16/2024
1 project · most recent 06/03/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/03/2025Signed-offAUSTIN PLBG & HTG CO.INCGas, Storm, Water/Sanitary
1 project · most recent 08/23/2024
General Wiring
FiledStatusContractorScope
08/23/2024CompleteWMS ELECTRICAL CONTNG LTDGeneral Wiring
1 project · most recent 06/03/2025
Concrete Wood
FiledStatusContractorScope
06/03/2025Signed-offAUSTIN PLBG & HTG CO.INCConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
06/12/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
06/12/2025Concrete - Cast-In-PlaceEBRAHIM HEKMATspecial
06/12/2025Fire-Resistant Penetrations and JointsEBRAHIM HEKMATspecial
06/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEBRAHIM HEKMATspecial
06/12/2025Subgrade InspectionsEBRAHIM HEKMATspecial
06/12/2025Structural Stability – Alterations of existing buildingsEBRAHIM HEKMATspecial
06/12/2025Energy Code Compliance InspectionsEBRAHIM HEKMATprogress
06/12/2025Fire-Resistance Rated ConstructionEBRAHIM HEKMATprogress
06/12/2025Structural Wood FrameEBRAHIM HEKMATprogress
06/12/2025FinalEBRAHIM HEKMATprogress
06/12/2025Footing and FoundationEBRAHIM HEKMATprogress
06/12/2025Interior lighting powerEBRAHIM HEKMATenergy_progress
06/12/2025Fenestration air leakageEBRAHIM HEKMATenergy_progress
06/12/2025Permanent certificateEBRAHIM HEKMATenergy_progress
06/12/2025MeteringEBRAHIM HEKMATenergy_progress
06/12/2025Insulation placement and R valuesEBRAHIM HEKMATenergy_progress
06/12/2025Fenestration and door U-factor and product ratingsEBRAHIM HEKMATenergy_progress
06/12/2025Air barrier - visual inspectionEBRAHIM HEKMATenergy_progress
06/12/2025Fenestration areasEBRAHIM HEKMATenergy_progress
06/12/2025Electric vehicle service equipment requirementsEBRAHIM HEKMATenergy_progress
02/11/2025HVAC-R and service water heating equipmentEBRAHIM HEKMATenergy_progress
02/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEBRAHIM HEKMATspecial
02/11/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
02/11/2025Fire-Resistant Penetrations and JointsEBRAHIM HEKMATspecial
02/11/2025Energy Code Compliance InspectionsEBRAHIM HEKMATprogress
Latest 25 of 56.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026X01005396-I1Request digital key ↗
08/20/2026X00948434-P2Request digital key ↗
08/20/2026X00948434-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P4Open ↗
08/13/2026X00948434-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P1Open ↗
08/13/2026X00948434-P4Open ↗
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature10
09/12/2026X00948434-S2Open ↗
09/12/2026X00948434-S2Open ↗
09/01/2026X00948434-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/12/2026X00948434-S2Open ↗
09/12/2026X00948434-S2Open ↗
09/01/2026X00948434-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026X01005396-I1Open ↗
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-S2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P4Open ↗
08/13/2026X00948434-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026X00948434-P1Open ↗
08/13/2026X00948434-P2Open ↗
08/13/2026X00948434-P4Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026X00948434-P1Open ↗
08/13/2026X00948434-P4Open ↗
08/13/2026X00948434-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00948434-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P1Open ↗
08/13/2026X00948434-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P1Open ↗
08/13/2026X00948434-P4Open ↗
▸DOB NOWPlot Diagram3
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P4Open ↗
08/13/2026X00948434-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026X00948434-P4Open ↗
08/13/2026X00948434-I1Open ↗
08/13/2026X00948434-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00948434-I1Open ↗