← Back
Three families
424 58 STREET
BROOKLYN · BIN 3015984
💬 Discuss this project
1897Year Built
2Stories
C0Building Class
R6BZoning
2,832 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,003 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
Architecture
Floor 34p · 1 filing · 8 docs
Floor 2
Floor 1
Cellar4p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUANTUM CONTRACTING LLC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/19/2021$1.1M—— → —$380/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KYLE MAY, ARCHITECT304/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & Y PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198304/19/2023
Building Lifecycle
All (46)Filed (3)Permit Issued (2)Signed Off (1)Violation (14)Inspection (6)Objection (14)Special Inspection (6)
06/06/2025
Violation issued (HPD, closed)
A
04/08/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
05/10/2023
Signed off — Alteration
PLUMBING WORK INCLUDES FIXTURE REPLACEMENT IN THE SAME LOCATION, AND RECONFIGURATION OF FIRST FLOOR BATHROOM TO COMPLY WITH ACCESSIBILITY REQUIREMENTS, PER BC 1107. GASWORK INCLUDES NEW GASMETERS INSTALLED IN THE CELLAR. NO CHANGES TO OCCUPAN.,USE, EGRESS
B00678162-I1
05/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
04/19/2023
Filed — Alteration
PLUMBING WORK INCLUDES FIXTURE REPLACEMENT IN THE SAME LOCATION, AND RECONFIGURATION OF FIRST FLOOR BATHROOM TO COMPLY WITH ACCESSIBILITY REQUIREMENTS, PER BC 1107. GASWORK INCLUDES NEW GASMETERS INSTALLED IN THE CELLAR. NO CHANGES TO OCCUPAN.,USE, EGRESS
B00678162-P1
04/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
03/27/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/20/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
10/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2022
Permit issued — General Construction
B00678141-I1-GC
09/13/2022
Permit issued — Plumbing
B00678162-I1-PL
08/03/2022
Objection resolved — Addressed
08/03/2022
Objection resolved — Addressed
08/03/2022
Objection resolved — Addressed
08/03/2022
Objection resolved — Addressed
07/27/2022
Objection resolved — Addressed
07/21/2022
Objection resolved — Addressed
05/16/2022
Objection resolved — Addressed
04/07/2022
Objection raised — Scope
04/07/2022
Objection raised — Admin
04/07/2022
Objection raised — Fire_Protection
04/07/2022
Objection raised — Scope
04/07/2022
Objection raised — Scope
04/07/2022
Objection raised — Inspections
04/07/2022
Objection raised — Inspections
04/06/2022
Filed — Alteration
B00678141-I1
04/04/2022
Filed — Alteration
PLUMBING WORK INCLUDES FIXTURE REPLACEMENT IN THE SAME LOCATION, AND RECONFIGURATION OF FIRST FLOOR BATHROOM TO COMPLY WITH ACCESSIBILITY REQUIREMENTS, PER BC 1107. GASWORK INCLUDES NEW GASMETERS INSTALLED IN THE CELLAR. NO CHANGES TO OCCUPAN.,USE, EGRESS
B00678162-I1
04/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
04/04/2022
Special inspection requirement — Interior lighting power
MAHFUZAR RAHMAN
04/04/2022
Special inspection requirement — Lighting in dwelling units
MAHFUZAR RAHMAN
04/04/2022
Special inspection requirement — Lighting controls
MAHFUZAR RAHMAN
03/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
A
12/17/2021
Violation issued (ECB, closed)
Unknown
12/17/2021
Violation issued (ECB, closed)
Construction
04/06/2021
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offQUANTUM CONTRACTING LLC09/21/2022
DOB NOWPlumbingSigned-offK & Y PLBG AND HTG INC09/13/2022
2 projects · most recent 12/15/2022
General Wiring
FiledStatusContractorScope
12/15/2022CompleteTMF ELEC'L CONTR. INC.General Wiring
04/27/2022Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/20/2023Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
04/07/2023Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
04/04/2022Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
04/04/2022Interior lighting powerMAHFUZAR RAHMANenergy_progress
04/04/2022Lighting in dwelling unitsMAHFUZAR RAHMANenergy_progress
04/04/2022Lighting controlsMAHFUZAR RAHMANenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/30/2026B00678162-P1Request digital key ↗
08/30/2026B00678141-I1Request digital key ↗
08/14/2026B00678162-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/14/2026B00678162-I1Open ↗
08/13/2026B00678141-I1Open ↗
08/13/2026B00678162-P1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/30/2026B00678162-I1Open ↗
08/13/2026B00678141-I1Open ↗
08/13/2026B00678162-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026B00678141-I1Open ↗
08/22/2026B00678141-I1Open ↗
08/22/2026B00678141-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00678162-P1Open ↗
08/24/2026B00678162-I1Open ↗
08/22/2026B00678141-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026B00678162-I1Open ↗
08/13/2026B00678141-I1Open ↗
08/13/2026B00678162-P1Open ↗