← Back
Elevator apt, semi-fireproof without stores
424 WEST 119 STREET
MANHATTAN · Morningside Heights · BIN 1059508
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R8Zoning
53,352 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized29 Open Violations 26 unresolved · 3 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: TRUSTEES OF COLUMBIA UNIVERSITY · 11,396 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLUMBIA RESIDENTIAL507/08/2026
COLUMBIA UNIVERSITY603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAPACH DESIGN GROUP212/01/2025
ENVIRONMENTAL ENGINEERING SOLUTIONS210/01/2024
JOEL PHAGOO P.E. PLLC107/10/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Grettel Carbo Design203/21/2026
Enviornmental & Energy Solutions203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CRUGNALE, MICHAELElectrical303/21/2026
DIFUSCO, ALFONSOElectrical303/21/2026
DUNN, JEREMYElectrical303/21/2026
COSMOPOLITAN CONSTRUCTIO*General Contractor204/09/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor207/08/2026
ALAFOGIANNIS PLBG & HTGPlumbing107/08/2026
ABSOLUTE PLBG & HTG CORPPlumbing106/28/2026
HESO ELECTRICAL INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NAPACH ARCHITECTU2945212/01/2025
NUENERGEN1717111/03/2022
Building Lifecycle
All (87)Filed (5)Permit Issued (6)Signed Off (3)Facade (FISP) (9)Violation (55)Special Inspection (9)
08/12/2026
Signed off — Alteration
APARTMENTS 26 AND 68: WORK IS LIMITED TO INTERIOR RENOVATION AS SHOWN ON THESE DRAWINGS. NO CHANGE TO EXISTING FLOOR AREA, BUILDING BULK, YARDS, USE,OCCUPANCY OR EGRESS.
M01321598-S1
08/12/2026
Signed off — Alteration
APARTMENTS 26 AND 68: WORK IS LIMITED TO INTERIOR RENOVATION AS SHOWN ON THESE DRAWINGS. NO CHANGE TO EXISTING FLOOR AREA, BUILDING BULK, YARDS, USE,OCCUPANCY OR EGRESS.
M01321598-I1
04/02/2026
Permit issued — General Construction
M01321598-I1-GC
01/13/2026
Permit issued — Plumbing
M01321598-S1-PL
01/08/2026
Permit issued — General Construction
M01321598-I1-GC
12/01/2025
Filed — Alteration
APARTMENTS 26 AND 68: WORK IS LIMITED TO INTERIOR RENOVATION AS SHOWN ON THESE DRAWINGS. NO CHANGE TO EXISTING FLOOR AREA, BUILDING BULK, YARDS, USE,OCCUPANCY OR EGRESS.
M01321598-S1
12/01/2025
Filed — Alteration
APARTMENTS 26 AND 68: WORK IS LIMITED TO INTERIOR RENOVATION AS SHOWN ON THESE DRAWINGS. NO CHANGE TO EXISTING FLOOR AREA, BUILDING BULK, YARDS, USE,OCCUPANCY OR EGRESS.
M01321598-I1
11/19/2025
Special inspection requirement — Lighting controls
JOEL NAPACH
11/19/2025
Special inspection requirement — Interior lighting power
JOEL NAPACH
11/19/2025
Special inspection requirement — Lighting in dwelling units
JOEL NAPACH
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
11/19/2025
Special inspection requirement — Final
JOEL NAPACH
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
JOEL NAPACH
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOEL NAPACH
10/01/2024
Filed — Alteration
M00755084-I1
04/01/2024
Violation issued (HPD, closed)
A
02/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/17/2023
Violation issued (HPD, open)
C
09/28/2023
Violation issued (HPD, open)
B
09/28/2023
Violation issued (HPD, open)
B
09/22/2023
Permit issued — Boiler Equipment
M00754056-I1-BE
11/03/2022
Filed — Alteration
REGISTER AND OBTAIN INSPECTION SIGN-OFF FOR TWO EXISTING A.O. SMITH HOT WATER HEATERS (7709-02, 7709-03)
M00754056-I1
11/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rengasamy Kasinathan
11/02/2022
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
10/30/2020
Cycle 9 facade report submitted
10/26/2020
Cycle 9 facade inspection completed
10/19/2020
Cycle 9 facade report signed — SAFE
08/03/2020
Violation issued (HPD, open)
A
05/04/2020
Violation issued (ECB, open)
Local Law
01/07/2020
Signed off — Alteration
M00059062-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/17/2019
Permit issued — Sidewalk Shed
M00059062-I1-SH
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2019
Violation issued (HPD, open)
A
07/10/2018
Filed — Alteration
M00059062-I1
07/10/2018
Permit issued — Sidewalk Shed
M00059062-I1-SH
05/03/2018
Violation issued (ECB, closed)
Construction
05/03/2018
Violation issued (ECB, closed)
Construction
10/10/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/01/2017
Violation issued (ECB, open)
Boilers
08/01/2017
Violation issued (ECB, open)
Boilers
09/24/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/18/2012
Cycle 7 facade report submitted
05/07/2012
Cycle 7 facade report signed — SWARMP
04/10/2012
Cycle 7 facade inspection completed
01/27/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2009
Violation issued (HPD, open)
B
08/22/2008
Violation issued (HPD, open)
A
08/22/2008
Violation issued (HPD, open)
B
08/22/2008
Violation issued (HPD, open)
A
08/22/2008
Violation issued (HPD, open)
A
08/22/2008
Violation issued (HPD, open)
A
08/22/2008
Violation issued (HPD, open)
A
08/22/2008
Violation issued (HPD, open)
B
08/22/2008
Violation issued (HPD, open)
A
08/22/2008
Violation issued (HPD, open)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCOSMOPOLITAN CONSTRUCTIO*04/02/2026
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP01/13/2026
DOB NOWGeneral ConstructionSigned-offCOSMOPOLITAN CONSTRUCTIO*01/08/2026
DOB NOWBoiler EquipmentPermit IssuedALAFOGIANNIS PLBG & HTG09/22/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP07/17/2019
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP07/10/2018
BISOTISSUEDMALBRO CONST SERVICES INC04/19/2021
BISOTISSUEDMALBRO CONST SERVICES INC09/28/2020
BISOTISSUEDMALBRO CONST SERVICES INC08/26/2019
BISOTISSUEDIDEAL ROOFING & SHEET ME06/26/2019
BISOTISSUEDIDEAL ROOFING & SHEET ME08/27/2018
BISPLISSUEDCC CONTROLLED PLBG CO INC01/13/2015
BISPLISSUEDCC CONTROLLED PLBG CO INC11/08/2013
BISFBISSUEDC C CONTROLLED COMBUSTION11/01/2013
BISOTISSUEDCOLUMBIA UNIVERSITY12/19/2012
BISPLISSUEDCLOVERDALE MASTER P&H INC10/24/2012
BISOTISSUEDCOLUMBIA UNIVERSITY10/19/2012
BISOTISSUEDCOLUMBIA UNIVERSITY08/20/2010
BISEQISSUEDOUTDOOR INSTALLATIONS LLC03/25/2010
BISOTISSUEDIDEAL ROOFING & SHEET ME03/18/2010
BISPLISSUEDPSEC PLUMBING & HEATING06/16/2008
BISPLISSUEDABSOLUTE PLBG & HTG CORP10/23/2007
BISOTISSUEDCOLUMBIA UNIVERSITY10/21/2005
BISPLISSUEDTHE RIGHT CONNECTION P&H12/10/2004
BISOTISSUEDCOLUMBIA UNIVERSITY11/22/2004
BISOTISSUEDCOLUMBIA UNIVERSITY11/22/2004
BISOTISSUEDHENRY RESTORATION LTD06/08/2004
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.04/23/2004
10 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026CompleteHESO ELECTRICAL INCGeneral Wiring
01/08/2026CompleteHESO ELECTRICAL INC—
01/08/2026CompleteHESO ELECTRICAL INCGeneral Wiring
01/08/2026CompleteHESO ELECTRICAL INC—
06/19/2023CompleteNEE ELECTRICAL, LLC—
07/06/2020CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
03/10/2020CancelledPLATINUM ELEC'L SVC. INCGeneral Wiring
12/12/2019CompleteZIN ELECTRICAL, INCGeneral Wiring
12/11/2019CompleteA.L. ELECTRICAL CORP.General Wiring
07/05/2018CompleteANTHONY G FERRY INC—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/19/2025Lighting controlsJOEL NAPACHenergy_progress
11/19/2025Interior lighting powerJOEL NAPACHenergy_progress
11/19/2025Lighting in dwelling unitsJOEL NAPACHenergy_progress
11/19/2025Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
11/19/2025FinalJOEL NAPACHprogress
11/19/2025Energy Code Compliance InspectionsJOEL NAPACHprogress
11/19/2025Fire-Resistance Rated ConstructionJOEL NAPACHprogress
02/16/2024Tenant Protection Plan Compliance—special
11/03/2022Fire-Resistant Penetrations and JointsRengasamy Kasinathanspecial
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/06/2026M00059062-I1Request digital key ↗
09/01/2026M00754056-I1Request digital key ↗
08/26/2026M00755084-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits36
▸BISWORK PERMIT APPLICATION18
08/27/2019123760073Open ↗
08/21/2019123760073Open ↗
07/26/2019123760073Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
06/17/2019140786166Open ↗
06/11/2019123760073Open ↗
06/11/2019140786166Open ↗
Showing 3 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/28/2011120303705Open ↗
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
06/11/2019123760073Open ↗
06/11/2019123760073Open ↗
05/08/2015110160183Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026M01321598-I1Open ↗
08/29/2026M01321598-I1Open ↗
08/29/2026M01321598-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026M00755084-I1Open ↗
08/20/2026M01321598-I1Open ↗
08/20/2026M01321598-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/11/2019123760073Open ↗
11/05/2013121829771Open ↗
03/26/2010120303705Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/11/2019123760073Open ↗
08/23/2018140786166Open ↗
11/05/2013121829771Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/19/2026M00754056-I1Open ↗
08/29/2026M01321598-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/23/2018140786166Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/23/2018140786166Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/26/2010120303705Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING5
11/05/2013121829771Open ↗
10/26/2012121415637Open ↗
10/03/2012121386990Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
10/05/2015121829771Open ↗
10/05/2015121829771Open ↗
04/03/2013121386990Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/05/2013121829771Open ↗
11/05/2013121829771Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/11/2019123760073Open ↗
02/27/2014121829771Open ↗
▸BISBOILER APPROVAL : 900A1
10/05/2015121829771Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
08/23/2018140786166Open ↗
06/11/2019123760073Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
06/11/2019123760073Open ↗
08/23/2018140786166Open ↗
11/05/2013121829771Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
07/29/2010120421659Open ↗
07/29/2010120421659Open ↗
03/02/2010120268968Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026M00755084-I1Open ↗
08/13/2026M00754056-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/20/2026M01321598-I1Open ↗
08/20/2026M01321598-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/26/2010120303705Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
06/11/2019123760073Open ↗
06/11/2019123760073Open ↗
11/05/2013121829771Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/30/2020140786166Open ↗
07/14/2020140786166Open ↗
07/13/2020140786166Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/23/2018140786166Open ↗
▸BISNYCECC ANALYSIS1
08/23/2018140786166Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/30/2020140786166Open ↗
07/30/2020140786166Open ↗
07/14/2020140786166Open ↗
Showing 3 of 6 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/17/2018121829771Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS6
10/26/2012121415637Open ↗
10/03/2012121386990Open ↗
07/29/2010120421659Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
07/30/2020140786166Open ↗
05/08/2015110160183Open ↗
09/04/2013121386990Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/05/2013121386990Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
07/30/2020140786166Open ↗
07/14/2020140786166Open ↗
07/13/2020140786166Open ↗
Showing 3 of 16 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/26/2019123760073Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
06/11/2019123760073Open ↗
11/05/2013121829771Open ↗
11/05/2013121829771Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
08/21/2019123760073Open ↗
06/11/2019140786166Open ↗
09/17/2018121829771Open ↗
▸BISADDITIONAL INFORMATION2
02/27/2014121829771Open ↗
12/13/2011120268968Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/23/2018140786166Open ↗
11/05/2013121829771Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/14/2020140786166Open ↗