Condo, residential tower (mixed-use, multi-family elevator) [derived]
425 BROOME STREET
MANHATTAN · SoHo-Little Italy-Hudson Square · BIN 1007020
💬 Discuss this project
1874Year Built
7Stories
RMBuilding Class
M1-5/R7XZoning
35,140 sfGross Floor Area
23Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 5,970 sf lot · 5.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Floor 41p · 1 filing · 4 docs
Floor 3
Floor 21p · 1 filing · 18 docs
Floor 1
Mezzanine1p · 1 filing · 18 docs
Site & exterior20p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIP HIN REALTY3003/21/2026
HIP HIN REALTY C O CBM2203/21/2026
425 BROOME STREET CONDOMINIUM1203/21/2026
CBM707/08/2026
CBM LIMITED503/22/2026
CEPRINE CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE205/13/2025
RIGID STRUCTURAL DESIGN, LLC403/01/2024
ALFRED KARMAN, ARCHITECT102/20/2024
MOTTOLA RINI ENGINEERS203/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
ALFRED KARMAN, ARCHITECT203/21/2026
JM ZONING, LLC.403/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.P. ELECTRIC INCElectrical203/22/2026
CEPRINE CONSTRUCTION INCGeneral Contractor207/08/2026
DEMAR PLUMBING CORPGeneral Contractor203/21/2026
PAUL SIGNSScaffold207/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
FRANCO REMODELING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352102/20/2024
MOTTOLA RINI ENGINEERS, P3251203/19/2021
Building Lifecycle
All (87)Filed (9)Permit Issued (6)Signed Off (6)Facade (FISP) (6)Violation (49)Special Inspection (11)
08/19/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (PALOMA WOOL)
M01205849-I1
08/19/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (PALOMA WOOL)
M01205870-I1
06/04/2025
Violation issued (HPD, closed)
A
05/19/2025
Permit issued — Sign
M01205870-I1-SG
05/16/2025
Permit issued — Sign
M01205849-I1-SG
05/13/2025
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (PALOMA WOOL)
M01205849-I1
04/25/2025
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (PALOMA WOOL)
M01205870-I1
04/04/2025
Special inspection requirement — Final
LEON SKVIRSKY
08/21/2024
Cycle 9 facade report signed — SAFE
07/30/2024
Cycle 9 facade report submitted
07/29/2024
Signed off — Alteration
M01005607-I1
07/09/2024
Signed off — Alteration
M00975368-I1
06/27/2024
Cycle 9 facade inspection completed
06/26/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00981597-I1
05/15/2024
Violation issued (ECB, closed)
Construction
03/04/2024
Permit issued — General Construction
M01005607-I1-GC
03/01/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00981597-P2
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2024
Filed — Alteration
M01005607-I1
01/19/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00981597-P1
01/03/2024
Permit issued — Supported Scaffold
M00981597-I1-SF
01/02/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00981597-I1
12/14/2023
Filed — Alteration
M00975368-I1
12/14/2023
Permit issued — Sidewalk Shed
M00975368-I1-SH
02/15/2022
Violation issued (HPD, closed)
A
03/22/2021
Signed off — Alteration
Installation of water heat pumps and fans as per plans
M00294687-I1
03/19/2021
Filed — Alteration
Installation of water heat pumps and fans as per plans
M00294687-P1
03/19/2021
Special inspection requirement — Final
Anthony Rini, III
03/19/2021
Special inspection requirement — HVAC and service water heating equipment
Anthony Rini, III
03/19/2021
Special inspection requirement — HVAC and service water heating system controls
Anthony Rini, III
03/19/2021
Special inspection requirement — HVAC insulation and sealing
Anthony Rini, III
03/19/2021
Special inspection requirement — Mechanical Systems
Anthony Rini, III
03/17/2021
Special inspection requirement — Final
Anthony Rini, III
03/17/2021
Special inspection requirement — HVAC and service water heating equipment
Anthony Rini, III
03/17/2021
Special inspection requirement — HVAC insulation and sealing
Anthony Rini, III
03/17/2021
Special inspection requirement — HVAC and service water heating system controls
Anthony Rini, III
03/17/2021
Special inspection requirement — Mechanical Systems
Anthony Rini, III
03/06/2021
Permit issued — Mechanical Systems
M00294687-I1-MS
10/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/28/2020
Filed — Alteration
Installation of water heat pumps and fans as per plans
M00294687-I1
10/25/2019
Violation issued (HPD, closed)
I
03/27/2019
Cycle 8 facade report signed — SWARMP
02/15/2019
Cycle 8 facade report submitted
01/28/2019
Cycle 8 facade inspection completed
10/05/2018
Violation issued (HPD, closed)
I
05/07/2018
Violation issued (ECB, closed)
Elevators
02/08/2018
Violation issued (ECB, closed)
Local Law
12/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (HPD, closed)
I
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2008
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
04/22/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC05/19/2025
DOB NOWSignSigned-offPAUL SIGNS, INC05/16/2025
DOB NOWGeneral ConstructionSigned-offFRANCO REMODELING CORP03/04/2024
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC01/03/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC12/14/2023
DOB NOWMechanical SystemsSigned-offDEMAR PLUMBING CORP03/06/2021
BIS—ISSUEDCHC CONTRACTING LTD01/10/2020
BISMHISSUEDDEMAR PLUMBING CORP01/09/2018
BISMHISSUEDCHC CONTRACTING LTD04/25/2017
BISPLISSUEDDEMAR PLUMBING CORP03/29/2012
BISOTISSUEDCHC CONTRACTING LTD03/21/2012
BISPLISSUEDDEMAR PLUMBING CORP04/05/2010
BISPLISSUEDDEMAR PLUMBING CORP03/29/2010
BISOTISSUEDCHC CONTRACTING LTD02/12/2010
BIS—ISSUEDCHC CONTRACTING LTD02/12/2010
BISSDISSUEDDEMAR PLUMBING CORP02/12/2010
BIS—ISSUEDCHC CONTRACTING LTD01/16/2009
BISOTISSUEDCHC CONTRACTING LTD01/16/2009
BISSPISSUEDDEMAR PLUMBING CORP10/27/2008
BISPLISSUEDDEMAR PLUMBING CORP10/22/2008
BISSDISSUEDDEMAR PLUMBING CORP10/22/2008
BISPLISSUEDDEMAR PLUMBING CORP10/22/2008
BIS—ISSUEDCHC CONTRACTING LTD01/10/2008
BISOTISSUEDCHC CONTRACTING LTD01/10/2008
BISEQISSUEDCHC CONTRACTING LTD01/10/2008
BISPLISSUEDDEMAR PLUMBING CORP10/19/2007
BISOTISSUEDCHC CONTRACTING LTD07/20/2007
BIS—ISSUEDCHC CONTRACTING LTD02/12/2007
BISEQISSUEDCHC CONTRACTING LTD02/12/2007
BISMHISSUEDCHC CONTRACTING LTD10/25/2006
BISOTISSUEDCHC CONTRACTING01/04/2006
BISEQISSUEDCHC CONTRACTING LTD01/04/2006
BIS—ISSUEDCHC CONTRACTING LTD01/04/2006
BISBLISSUEDDEMAR PLUMBING CORP12/05/2005
BISCCISSUEDCHC CONTR. LTD.09/20/2005
BISSPISSUEDDEMAR PLUMBING CORP03/23/2005
BISPLISSUEDDEMAR PLUMBING CORP03/23/2005
BISOTISSUEDCHC CONTRACTING01/13/2005
BISEQISSUEDCHC CONTRACTING LTD01/13/2005
BIS—ISSUEDCHC CONTRACTING LTD01/13/2005
+ 11 more permits on file
3 projects · most recent 01/12/2024
General Wiring
FiledStatusContractorScope
01/12/2024CompleteBOROWIDE ELECT'L CONTR'S—
08/06/2021CompleteI.P. ELECTRIC INCGeneral Wiring
01/23/2020CompleteI.P. ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/04/2025FinalLEON SKVIRSKYprogress
03/19/2021FinalAnthony Rini, IIIprogress
03/19/2021HVAC and service water heating equipment Anthony Rini, IIIenergy_progress
03/19/2021HVAC and service water heating system controls Anthony Rini, IIIenergy_progress
03/19/2021HVAC insulation and sealing Anthony Rini, IIIenergy_progress
03/19/2021Mechanical SystemsAnthony Rini, IIIspecial
03/17/2021FinalAnthony Rini, IIIprogress
03/17/2021HVAC and service water heating equipment Anthony Rini, IIIenergy_progress
03/17/2021HVAC insulation and sealing Anthony Rini, IIIenergy_progress
03/17/2021HVAC and service water heating system controls Anthony Rini, IIIenergy_progress
03/17/2021Mechanical SystemsAnthony Rini, IIIspecial
▾Documents — 179 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/28/2026M00975368-I1Request digital key ↗
08/28/2026M00981597-P2Request digital key ↗
08/28/2026M00981597-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00294687-I1Request digital key ↗
09/05/2026M00294687-P1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION19
03/03/2021123812703Open ↗
02/10/2021123812703Open ↗
02/04/2021123812703Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION11
01/10/2020123812703Open ↗
01/09/2018123166812Open ↗
04/27/2017123003828Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit5
09/05/2026M00294687-I1Open ↗
09/05/2026M00294687-P1Open ↗
08/13/2026M01205870-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/05/2020123812703Open ↗
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/10/2020123812703Open ↗
12/23/2019123812703Open ↗
09/17/2019123812703Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00294687-I1Open ↗
09/05/2026M00294687-P1Open ↗
08/28/2026M00981597-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00294687-P1Open ↗
09/01/2026M00294687-P1Open ↗
09/01/2026M00294687-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
03/19/2012121008970Open ↗
07/30/2008110288331Open ↗
07/30/2008110288331Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/27/2017123166812Open ↗
02/08/2017123003828Open ↗
07/30/2008110288331Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/27/2017123166812Open ↗
02/08/2017123003828Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00294687-P1Open ↗
08/29/2026M00294687-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
08/22/2012121008970Open ↗
06/27/2012121008970Open ↗
03/19/2012121008970Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
02/02/2009110288331Open ↗
02/02/2009110288331Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
02/02/2009110288331Open ↗
02/02/2009110288331Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
09/17/2019123812703Open ↗
12/27/2017123166812Open ↗
02/08/2017123003828Open ↗
▸BISST-1: Street Tree Checklist2
02/06/2009110288331Open ↗
09/17/2019123812703Open ↗
▸BISPLEASE PROVIDE ST-1:STREET TREE SIGN OFF FORM AND CHECK OFF EXEMPTION SECTION 4 (CHOOSE APPROPIATE WAIVER BASED ONZR 23-03, 24-05, 33-03)WE DO NOT WAIVETHIS FORM OR RQUIREMENT!1
08/31/2021123812703Open ↗
▸Environmental & Asbestos12
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
03/19/2012121008970Open ↗
07/30/2008110288331Open ↗
07/30/2008110288331Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/02/2019123812703Open ↗
12/02/2019123812703Open ↗
12/27/2017123166812Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00294687-P1Open ↗
09/05/2026M00294687-I1Open ↗
08/13/2026M01005607-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/13/2020123812703Open ↗
10/13/2020123812703Open ↗
▸Approvals, Objections & Sign-offs40
▸BISSCHEDULE A - OCCUPANCY / USE16
03/03/2021123812703Open ↗
03/03/2021123812703Open ↗
02/10/2021123812703Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
03/24/2020123841566Open ↗
03/24/2020123841566Open ↗
03/24/2020123841566Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/30/2020123812703Open ↗
12/09/2020123812703Open ↗
03/08/2018123166812Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL5
12/23/2019123812703Open ↗
03/08/2018123166812Open ↗
12/27/2017123166812Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M00981597-I1Open ↗
08/13/2026M00981597-P1Open ↗
08/13/2026M00981597-P2Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/19/2012121008970Open ↗
07/30/2008110288331Open ↗
▸BISLANDMARKS SIGNOFF1
06/22/2021123812703Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
09/17/2019123812703Open ↗
03/08/2018123166812Open ↗
03/08/2018123166812Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/22/2021123812703Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION7
08/31/2021123812703Open ↗
08/31/2021123812703Open ↗
08/31/2021123812703Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
03/05/2020123841566Open ↗
09/17/2019123812703Open ↗
12/27/2017123166812Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
03/24/2020123812703Open ↗
03/08/2018123166812Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
09/17/2019123812703Open ↗
▸BISTCO - Supporting Documents1
12/07/2020123812703Open ↗