← Back
Three families
425 EAST 118 STREET
MANHATTAN · East Harlem (North) · BIN 1054850
💬 Discuss this project
1909Year Built
4Stories
C0Building Class
R7BZoning
4,122 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,170 sf lot · 1.9 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Floor 11p · 1 filing · 6 docs
Cellar3p · 2 filings · 20 docs
Site & exterior10p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY408/29/2026
HOUSING PRESERVATION COMMISSION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMA DESIGNS LLC204/16/2026
PIRO STUDIO LLC105/20/2022
JOSE L. PENA,P.E.308/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JANCO BUILDING CONSULTANTS, LLC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALBERT MENDOZAGeneral Contractor307/08/2026
STEVEN BURKEElectrical303/21/2026
KINGS GROUP NY CORPGeneral Contractor207/08/2026
ROBERT STAR PLBG AND HTGPlumbing107/08/2026
ALBERT MENDOZAGeneral Contractor103/21/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503105/20/2022
JOSE L. PENA, P.E5969308/30/2021
Building Lifecycle
All (55)Filed (6)Permit Issued (5)Signed Off (5)Violation (14)Objection (2)Special Inspection (23)
06/09/2026
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01384030-S1
06/09/2026
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01384030-I1
04/29/2026
Violation issued (HPD, closed)
A
04/16/2026
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01384030-S1
04/16/2026
Permit issued — Supported Scaffold
M01384030-S1-SF
04/08/2026
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01384030-I1
04/08/2026
Permit issued — Sidewalk Shed
M01384030-I1-SH
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/15/2023
Violation issued (HPD, closed)
A
11/22/2022
Signed off — Alteration
PROPOSED INTERIOR RENOVATION TO FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00680718-I1
11/03/2022
Violation issued (HPD, closed)
I
07/07/2022
Permit issued — General Construction
M00680718-I1-GC
05/20/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00680718-I1
05/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Special inspection requirement — Final
PIETRO ROSATO
02/15/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
10/15/2021
Signed off — Alteration
PROPOSED INSTALLATION OF A NEW SPLIT MECHANICAL SYSTEM FILE TO REMOVED VIOLATIONS #039008953Z, #039008959J, #039008964Y. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. OT AND PL FILED UNDER DIFFERENT APPLICATION.
M00226112-I1
09/02/2021
Special inspection requirement — HVAC and service water heating equipment
Jose Pena
09/02/2021
Special inspection requirement — HVAC and service water heating system controls
Jose Pena
09/02/2021
Special inspection requirement — Maintenance information
Jose Pena
09/02/2021
Special inspection requirement — Permanent certificate
Jose Pena
09/02/2021
Special inspection requirement — HVAC insulation and sealing
Jose Pena
08/31/2021
Signed off — Alteration
TO LEGALIZE COPPER PIPES INSTALLED FOR A A/C. UNITS AND CERTIFY CORRECTION OF VIOLATION #039008959J. REMOVAL OF THE SHOWERS. OT AND MECHANICAL TO BE FILLED ON SEPARATE APPLICATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00226077-I1
08/30/2021
Filed — Alteration
PROPOSED INSTALLATION OF A NEW SPLIT MECHANICAL SYSTEM FILE TO REMOVED VIOLATIONS #039008953Z, #039008959J, #039008964Y. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. OT AND PL FILED UNDER DIFFERENT APPLICATION.
M00226112-P1
08/02/2021
Special inspection requirement — HVAC insulation and sealing
Jose Pena
08/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
08/02/2021
Special inspection requirement — Mechanical Systems
Jose Pena
08/02/2021
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
08/02/2021
Special inspection requirement — Final
Jose Pena
08/02/2021
Special inspection requirement — HVAC and service water heating equipment
Jose Pena
08/02/2021
Special inspection requirement — Maintenance information
Jose Pena
08/02/2021
Special inspection requirement — HVAC and service water heating system controls
Jose Pena
08/02/2021
Special inspection requirement — Permanent certificate
Jose Pena
04/01/2021
Violation issued (HPD, closed)
A
03/21/2021
Permit issued — Plumbing
M00226077-I1-PL
02/28/2020
Permit issued — Mechanical Systems
M00226112-I1-MS
11/04/2019
Objection resolved — Addressed
10/18/2019
Objection raised — Structural
10/08/2019
Filed — Alteration
PROPOSED INSTALLATION OF A NEW SPLIT MECHANICAL SYSTEM FILE TO REMOVED VIOLATIONS #039008953Z, #039008959J, #039008964Y. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. OT AND PL FILED UNDER DIFFERENT APPLICATION.
M00226112-I1
10/08/2019
Filed — Alteration
TO LEGALIZE COPPER PIPES INSTALLED FOR A A/C. UNITS AND CERTIFY CORRECTION OF VIOLATION #039008959J. REMOVAL OF THE SHOWERS. OT AND MECHANICAL TO BE FILLED ON SEPARATE APPLICATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00226077-I1
10/08/2019
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
10/02/2019
Special inspection requirement — Maintenance information
Jose Pena
10/02/2019
Special inspection requirement — HVAC and service water heating equipment
Jose Pena
10/02/2019
Special inspection requirement — HVAC and service water heating system controls
Jose Pena
10/02/2019
Special inspection requirement — HVAC insulation and sealing
Jose Pena
10/01/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
09/05/2019
Violation issued (ECB, closed)
Construction
10/09/2018
Violation issued (HPD, closed)
I
10/25/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
10/27/1983
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP04/16/2026
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/08/2026
DOB NOWGeneral ConstructionSigned-offALBERT MENDOZA07/07/2022
DOB NOWPlumbingSigned-offROBERT STAR PLBG AND HTG03/21/2021
DOB NOWMechanical SystemsSigned-offALBERT MENDOZA02/28/2020
BISOTISSUEDBROOKLYN SOLARWORKS LLC10/12/2023
BISOTISSUEDALBERT MENDOZA02/04/2020
BISPLISSUEDJUNIOR CARTER MECH. CORP06/29/2005
BISPLISSUEDCOPPER SERVICES, LLC04/12/2005
BIS—ISSUEDA. ALEEM CONSTRUCTION INC.12/27/2004
BIS—ISSUEDA. ALEEM CONSTRUCTION INC.01/29/2004
BISPLISSUEDARCO PLBG AND HTG INC01/26/2004
BIS—ISSUEDA. ALEEM CONSTRUCTION INC.09/11/2003
4 projects · most recent 03/16/2026
General Wiring
FiledStatusContractorScope
03/16/2026CompleteHIGH QUALITY ELEC.OF NYC—
02/22/2024CompleteBROOKYLN SOLARWORKS, LLC4 meters
01/08/2024CompleteBROOKYLN SOLARWORKS, LLC—
03/25/2020CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 04/16/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/16/2026Signed-offKINGS GROUP NY CORPScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/17/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
02/15/2022FinalPIETRO ROSATOprogress
02/15/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
09/02/2021HVAC and service water heating equipmentJose Penaenergy_progress
09/02/2021HVAC and service water heating system controlsJose Penaenergy_progress
09/02/2021Maintenance informationJose Penaenergy_progress
09/02/2021Permanent certificateJose Penaenergy_progress
09/02/2021HVAC insulation and sealingJose Penaenergy_progress
08/02/2021HVAC insulation and sealingJose Penaenergy_progress
08/02/2021Fire-Resistant Penetrations and JointsJose Penaspecial
08/02/2021Mechanical SystemsJose Penaspecial
08/02/2021Energy Code Compliance InspectionsJose Penaprogress
08/02/2021FinalJose Penaprogress
08/02/2021HVAC and service water heating equipmentJose Penaenergy_progress
08/02/2021Maintenance informationJose Penaenergy_progress
08/02/2021HVAC and service water heating system controlsJose Penaenergy_progress
08/02/2021Permanent certificateJose Penaenergy_progress
10/08/2019Energy Code Compliance InspectionsJose Penaprogress
10/02/2019Maintenance informationJose Penaenergy_progress
10/02/2019HVAC and service water heating equipmentJose Penaenergy_progress
10/02/2019HVAC and service water heating system controlsJose Penaenergy_progress
10/02/2019HVAC insulation and sealingJose Penaenergy_progress
10/01/2019Fire-Resistant Penetrations and JointsJose Penaspecial
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
09/02/2026M00680718-I1Request digital key ↗
08/17/2026M01384030-I1Request digital key ↗
08/17/2026M01384030-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00226112-P1Request digital key ↗
09/03/2026M00226112-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00226077-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
10/10/2023141024647Open ↗
04/07/2021123886526Open ↗
11/30/2020123886526Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
10/12/2023141024647Open ↗
02/04/2020123886526Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature19
08/29/2026M00680718-I1Open ↗
08/29/2026M00680718-I1Open ↗
08/22/2026M00226112-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00226112-P1Open ↗
09/03/2026M00226112-I1Open ↗
09/02/2026M00680718-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M00680718-I1Open ↗
08/22/2026M00226112-P1Open ↗
08/22/2026M00226077-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/21/2020123886526Open ↗
10/08/2019123886526Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/10/2023141024647Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
10/08/2019123886526Open ↗
▸DOB NOWTenant Protection Plan1
09/03/2026M00226112-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00226112-I1Open ↗
09/03/2026M00226112-P1Open ↗
09/02/2026M00680718-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/10/2023141024647Open ↗
10/08/2019123886526Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/27/2024141024647Open ↗
10/12/2023141024647Open ↗
10/10/2023141024647Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/03/2020123886526Open ↗
10/08/2019123886526Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/27/2024141024647Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/01/2024141024647Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/10/2023141024647Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/22/2021123886526Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/22/2021123886526Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/27/2024141024647Open ↗
10/12/2023141024647Open ↗
10/10/2023141024647Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/22/2021123886526Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/01/2024141024647Open ↗
04/22/2021123886526Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/01/2024141024647Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
02/27/2024141024647Open ↗
10/10/2023141024647Open ↗
10/08/2019123886526Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/22/2021123886526Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
10/10/2023141024647Open ↗
04/14/2021123886526Open ↗
04/07/2021123886526Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
10/08/2019123886526Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/10/2023141024647Open ↗
▸BISBOROUGH INTAKE FORM1
11/06/2019123886526Open ↗
▸Other Documents1
▸BISFINAL INSPAECTION PER BB 2018-0181
04/22/2021123886526Open ↗