BuildNYC
Elevator cooperative
425 EAST 79TH STREET
MANHATTAN · BIN 1050349
💬 Discuss this project
1955Year Built
14Stories
D4Building Class
R10AZoning
184,816 sfGross Floor Area
193Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 79th St Tenants · 21,351 sf lot · 8.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1 filing
Floor 14Unit 14F1 filing · 8 docs
Floor 13
Floor 12Unit 12B, Unit 12C, Unit 12E +14 filings · 17 docs
Floor 11
Floor 10
Floor 9
Floor 8Unit 8F3 filings · 17 docs
Floor 7Unit 7F1p · 3 filings · 17 docs
Floor 6Unit 6G1 filing · 20 docs
Floor 5Unit 5J1 filing · 2 docs
Floor 4
Floor 3Unit 3F, Unit 3K3p · 2 filings · 8 docs
Floor 2Unit 2C1 filing · 3 docs
Floor 1
CellarBoiler burner replacement and fuel oil grade change1p · 1 filing · 20 docs
Sub-CellarBoiler burner replacement and fuel oil grade change2p · 1 filing · 20 docs
Site & exteriorInstallation of 300 psf sidewalk shed2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
79th St Tenants2607/08/2026
79st Tennents Corp Co-OP603/21/2026
425 East 79th Street Owners403/21/2026
425 East 79th Street Tenants303/21/2026
Maxwell Kate 9 ES 38th St103/21/2026
Pres103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G.palladino1109/21/2026
Asr Engineering107/07/2025
Jock Deboer, AIA312/20/2024
Robert Germain Jr. PE607/10/2024
Porter Clapp Architects110/30/2023
HC Engineering412/01/2022
Kojo Simpson Architect107/01/2022
Kelley Design106/08/2022
Engineering Professional Service P204/19/2022
Ashraf507/29/2021
WSP105/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ Expediting603/21/2026
J.A.M. Associates403/21/2026
Synchron Expediting603/21/2026
Zium Arch403/21/2026
Arinnity NYC203/21/2026
HH Building Consulting & Architectu603/21/2026
Naphtali Deutsch Architecture403/21/2026
Cadkay203/21/2026
Tribeca Construction Consulting203/21/2026
Progeny Management & Expediting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gotham General CarpentryGeneral Contractor607/08/2026
Intersystem InstallationScaffold407/08/2026
Platinum Services NYScaffold407/08/2026
C C Controlled CombustionGeneral Contractor403/21/2026
Gbi ConstructionGeneral Contractor303/21/2026
HTC Construction ManagementScaffold303/21/2026
Renovation by MY HomeGeneral Contractor307/08/2026
Van Gogh Paintersspecialty_contractor303/21/2026
CC Controlled Plumbing CoPlumbing207/08/2026
M&G Plumbing and HeatingPlumbing207/08/2026
TM Construction of NYGeneral Contractor107/08/2026
Accurate MechanicalPlumbing107/08/2026
Aura PlumbingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Jam ElectricalElectrical103/21/2026
TMS Plumbing & HeatingPlumbing107/08/2026
Argon ElectricalElectrical103/22/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
Mazza ElectricElectrical103/21/2026
Nion ElectricElectrical103/22/2026
PCS Electrical ServicesElectrical103/21/2026
PCS Electrical ServicesElectrical103/22/2026
Tikvah Electric CoElectrical103/22/2026
Gallery Restorationspecialty_contractor107/08/2026
Gaudioso ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Asr Engineering8404107/07/2025
Jock Deboer, AIA - Sia7008312/20/2024
Robert F. Germain Jr. PE5100607/10/2024
Dean Mendez Architect, P8621103/20/2024
Porter Clapp Architects5343110/30/2023
Beyond Arch3600212/01/2022
Erik Sun, Architect3010106/08/2022
Buildtech Engineering6369104/19/2022
WSP USA1848105/26/2021
Building Lifecycle
All (219)Filed (36)Permit Issued (27)Signed Off (16)Facade (FISP) (15)Violation (46)Inspection (17)Objection (32)Special Inspection (30)
09/21/2026
Filed — Alteration
Plumbing work related to the renovation/combination of apartments 12B and 12C on the 12th floor.
M01246737-P2
09/17/2026
Cycle 10 facade report signed — SWARMP
09/16/2026
Cycle 10 facade report submitted
09/10/2026
Cycle 10 facade inspection completed
08/31/2026
Signed off — Alteration
Filing for minor plumbing modifications for apartment renovation
M01338530-I1
08/31/2026
Signed off — Alteration
Filing for minor plumbing modifications for apartment renovation
M01338530-S1
07/27/2026
Filed — Alteration
Filing for minor plumbing modifications for apartment renovation
M01338530-P1
07/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2026
Signed off — Alteration
Plumbing work related to the renovation/combination of apartments 12B and 12C on the 12th floor.
M01246737-I1
03/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2026
Permit issued — Plumbing
M01338530-S1-PL
02/05/2026
Permit issued — General Construction
M01338530-I1-GC
01/14/2026
Filed — Alteration
Filing for minor plumbing modifications for apartment renovation
M01338530-I1
01/14/2026
Filed — Alteration
Filing for minor plumbing modifications for apartment renovation
M01338530-S1
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE PALLADINO
11/18/2025
Special inspection requirement — Lighting in dwelling units
GEORGE PALLADINO
11/18/2025
Special inspection requirement — Interior lighting power
GEORGE PALLADINO
11/18/2025
Special inspection requirement — Lighting controls
GEORGE PALLADINO
11/18/2025
Special inspection requirement — Final
GEORGE PALLADINO
11/13/2025
Objection resolved — Addressed
11/07/2025
Objection raised — Admin
10/28/2025
Filed — Alteration
Plumbing work related to the renovation/combination of apartments 12B and 12C on the 12th floor.
M01246737-P1
10/20/2025
Special inspection requirement — Interior lighting power
GEORGE PALLADINO
10/20/2025
Special inspection requirement — Lighting controls
GEORGE PALLADINO
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE PALLADINO
10/20/2025
Special inspection requirement — Lighting in dwelling units
GEORGE PALLADINO
10/20/2025
Special inspection requirement — Final
GEORGE PALLADINO
09/18/2025
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00548445-I1
09/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/22/2025
Permit issued — Plumbing
M01246737-S1-PL
08/13/2025
Signed off — Alteration
CREATE A NEW BEDROOM AT APARTMENT 5J. NO CHANGE IN EGRESS OCCUPANCY OR USE.
M01251465-I1
08/12/2025
Permit issued — General Construction
M01246737-I1-GC
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/08/2025
Permit issued — General Construction
M01251465-I1-GC
07/30/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Addressed
07/14/2025
Objection raised — Plumbing
07/14/2025
Objection raised — Plumbing
07/14/2025
Objection raised — Fire_Protection
07/11/2025
Objection resolved — Addressed
07/10/2025
Objection raised — Cost
07/10/2025
Objection raised — Other
07/10/2025
Objection raised — Other
07/07/2025
Filed — Alteration
CREATE A NEW BEDROOM AT APARTMENT 5J. NO CHANGE IN EGRESS OCCUPANCY OR USE.
M01251465-I1
07/02/2025
Filed — Alteration
Plumbing work related to the renovation/combination of apartments 12B and 12C on the 12th floor.
M01246737-S1
06/30/2025
Filed — Alteration
Plumbing work related to the renovation/combination of apartments 12B and 12C on the 12th floor.
M01246737-I1
05/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2025
Special inspection requirement — Insulation placement and R values
Jock deBoer
01/28/2025
Special inspection requirement — Lighting controls
Jock deBoer
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jock deBoer
01/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jock deBoer
01/28/2025
Special inspection requirement — Final
Jock deBoer
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
01/28/2025
Special inspection requirement — Lighting in dwelling units
Jock deBoer
01/07/2025
Signed off — Alteration
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. CHANGE GRADE OF FUEL OIL FROM #4 TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00926210-I1
01/07/2025
Signed off — Alteration
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. CHANGE GRADE OF FUEL OIL FROM #4 TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00926210-S2
Latest 60 of 219 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM&G Plumbing and Heating02/13/2026
DOB NOWGeneral ConstructionSigned-offGotham General Carpentry02/05/2026
DOB NOWPlumbingPermit IssuedM&G Plumbing and Heating08/22/2025
DOB NOWGeneral ConstructionSigned-offGotham General Carpentry08/12/2025
DOB NOWGeneral ConstructionSigned-offGbi Construction08/08/2025
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co07/24/2024
DOB NOWGeneral ConstructionPermit IssuedGotham General Carpentry05/10/2024
DOB NOWGeneral ConstructionPermit IssuedRenovation by MY Home03/04/2024
DOB NOWPlumbingPermit IssuedTMS Plumbing & Heating02/29/2024
DOB NOWGeneral ConstructionSigned-offC C Controlled Combustion01/03/2024
DOB NOWGeneral ConstructionPermit IssuedRenovation by MY Home12/15/2023
DOB NOWGeneral ConstructionSigned-offTM Construction of NY12/08/2023
DOB NOWBoiler EquipmentSigned-offC C Controlled Combustion09/20/2023
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co09/20/2023
DOB NOWGeneral ConstructionSigned-offC C Controlled Combustion09/20/2023
DOB NOWGeneral ConstructionSigned-offGaudioso Contracting06/23/2023
DOB NOWPlumbingSigned-offAura Plumbing07/05/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/04/2022
DOB NOWMechanical SystemsSigned-offVan Gogh Painters06/20/2022
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I05/31/2022
DOB NOWGeneral ConstructionSigned-offGallery Restoration05/23/2022
DOB NOWStructuralPermit IssuedGotham General Carpentry08/03/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/09/2021
DOB NOWPlumbingPermit IssuedAnthony Disabato07/02/2021
DOB NOWGeneral ConstructionSigned-offGotham General Carpentry05/25/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/24/2020
DOB NOWSidewalk ShedSigned-offIntersystem Installation10/02/2019
BISOTISSUEDDJM NYC02/18/2022
BISOTISSUEDDJM NYC02/12/2021
BISOTISSUEDDJM NYC08/19/2020
BISOTISSUEDAlma Design07/14/2020
BISOTISSUEDDJM NYC03/12/2020
BISOTISSUEDBarry Fishelberg Co08/08/2017
BISPLISSUEDF1 Mechanical07/26/2017
BISOTISSUEDBarry Fishelberg Co07/17/2017
BISOTISSUEDWK Renovation11/28/2016
BISPLISSUEDSuperb Plumbing & Heating09/19/2016
BISOTISSUEDWK Renovation08/26/2016
BISOTISSUEDDJM NYC01/15/2015
BISEQISSUEDRockledge Scaffold09/19/2014
+ 37 more permits on file
5 projects · most recent 09/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/21/2026Permit IssuedM&G Plumbing and HeatingGas, Water/Sanitary
07/27/2026Signed-offM&G Plumbing and HeatingGas, Water/Sanitary
12/20/2024Permit IssuedTMS Plumbing & HeatingGas, Water/Sanitary
07/10/2024Signed-offCC Controlled Plumbing CoGas
10/18/2021Permit IssuedAccurate MechanicalWater/Sanitary
25 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedPCS Electrical ServicesGeneral Wiring
02/13/2026Permit IssuedPCS Electrical ServicesGeneral Wiring
01/30/2026Permit IssuedJam Electrical—
09/17/2025CompletePower Up NYC ElectricGeneral Wiring
08/18/2025CompletePCS Electrical ServicesGeneral Wiring
07/01/2025CompleteSunbird Electrical ContractingGeneral Wiring
03/31/2025Permit IssuedKJK ElectricGeneral Wiring
02/10/2025CompleteRobert Chimenti—
01/28/2025CompleteN.Z. Pilgrim ElectricGeneral Wiring
07/02/2024CompleteNash Electric ServicesGeneral Wiring
05/17/2024CompleteEmpire Lic Electrical ContractorsGeneral Wiring
04/17/2024CompleteArgon ElectricalGeneral Wiring
06/27/2023CompleteSunbird Electrical ContractingGeneral Wiring
04/06/2023CompleteEmpire Lic Electrical Contractors—
02/23/2023CompleteNion ElectricGeneral Wiring
1 project · most recent 05/26/2021
Steel
FiledStatusContractorScope
05/26/2021Permit IssuedGotham General CarpentrySteel
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
11/18/2025Energy Code Compliance InspectionsGEORGE PALLADINOprogress
11/18/2025Lighting in dwelling unitsGEORGE PALLADINOenergy_progress
11/18/2025Interior lighting powerGEORGE PALLADINOenergy_progress
11/18/2025Lighting controlsGEORGE PALLADINOenergy_progress
11/18/2025FinalGEORGE PALLADINOprogress
10/20/2025Interior lighting powerGEORGE PALLADINOenergy_progress
10/20/2025Lighting controlsGEORGE PALLADINOenergy_progress
10/20/2025Energy Code Compliance InspectionsGEORGE PALLADINOprogress
10/20/2025Lighting in dwelling unitsGEORGE PALLADINOenergy_progress
10/20/2025FinalGEORGE PALLADINOprogress
01/28/2025Insulation placement and R valuesJock deBoerenergy_progress
01/28/2025Lighting controlsJock deBoerenergy_progress
01/28/2025Fire-Resistant Penetrations and JointsJock deBoerspecial
01/28/2025Fire-Resistance Rated ConstructionJock deBoerprogress
01/28/2025FinalJock deBoerprogress
01/28/2025Energy Code Compliance InspectionsJock deBoerprogress
01/28/2025Lighting in dwelling unitsJock deBoerenergy_progress
12/12/2024Lighting in dwelling unitsJock deBoerenergy_progress
12/12/2024Insulation placement and R valuesJock deBoerenergy_progress
12/12/2024Lighting controlsJock deBoerenergy_progress
12/12/2024Fire-Resistance Rated ConstructionJock deBoerprogress
12/12/2024FinalJock deBoerprogress
12/12/2024Energy Code Compliance InspectionsJock deBoerprogress
12/12/2024Fire-Resistant Penetrations and JointsJock deBoerspecial
07/12/2024Tenant Protection Plan ComplianceRobert Germain Jr.special
Latest 25 of 56.
▾Documents — 333 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch35
09/03/2026M00509818-I1Request digital key ↗
09/03/2026M00548445-I1Request digital key ↗
09/03/2026M00548445-P1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00238140-I1Request digital key ↗
09/04/2026M00238140-P2Request digital key ↗
09/04/2026M00238140-P1Request digital key ↗
▸Applications & Permits42
▸BISWORK PERMIT APPLICATION23
07/14/2020123789640Open ↗
03/13/2020123786055Open ↗
08/04/2017122912697Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
09/15/2021123786055Open ↗
08/30/2021123786055Open ↗
01/09/2020123789640Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications99
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/04/2026M00238140-I1Open ↗
09/04/2026M00238140-P1Open ↗
09/04/2026M00238140-P2Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/05/2026M00238140-I1Open ↗
09/01/2026M00917955-S1Open ↗
09/01/2026M01246737-I1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
03/13/2020123786055Open ↗
01/09/2020123789640Open ↗
10/15/2019123786055Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M00926210-S2Open ↗
09/23/2026M00926210-S2Open ↗
09/01/2026M00917955-S1Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/09/2013140122999Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/09/2013140122999Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/29/2008110371703Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/09/2013140122999Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/29/2008110371703Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING7
08/12/2011120670201Open ↗
04/25/2011120670201Open ↗
12/21/2009110371703Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS6
09/09/2010110371703Open ↗
09/09/2010110371703Open ↗
09/09/2010110371703Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
03/12/2012120670201Open ↗
01/19/2012120670201Open ↗
01/19/2010110371703Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/29/2016122912697Open ↗
09/26/2016122783728Open ↗
05/23/2016122783728Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
09/09/2010110371703Open ↗
09/09/2010110371703Open ↗
08/24/2010110371703Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/28/2009110422043Open ↗
12/19/2008110422043Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
01/09/2020123789640Open ↗
11/29/2016122912697Open ↗
08/10/2016122783728Open ↗
▸DOB NOWTenant Protection Plan3
09/04/2026M00238140-P1Open ↗
09/04/2026M00238140-I1Open ↗
09/04/2026M00238140-P2Open ↗
▸BISSTREET TREE CHECKLIST1
10/29/2008110371703Open ↗
▸Environmental & Asbestos40
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/03/2026M00510822-I1Open ↗
09/03/2026M00510822-P1Open ↗
09/03/2026M00510822-P2Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
09/15/2021123786055Open ↗
01/09/2020123789640Open ↗
10/15/2019123786055Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/25/2011120670201Open ↗
12/19/2008110422043Open ↗
10/29/2008110371703Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
01/09/2020123789640Open ↗
10/15/2019123786055Open ↗
07/18/2018122912697Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/02/2026M00749070-I1Open ↗
08/13/2026M00675371-I1Open ↗
08/13/2026M00716105-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/10/2020123789640Open ↗
07/18/2018122912697Open ↗
10/14/2015121775472Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
05/16/2022123786055Open ↗
05/16/2022123786055Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/09/2013140122999Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/10/2020123789640Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/16/2022123786055Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/25/2011120670201Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/15/2021123786055Open ↗
09/15/2021123786055Open ↗
09/10/2020123789640Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
05/16/2022123786055Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/16/2022123786055Open ↗
▸BISMASONRY1
05/16/2022123786055Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
05/18/2022123786055Open ↗
09/10/2020123789640Open ↗
07/18/2018122912697Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/18/2018122912697Open ↗
06/26/2017122783728Open ↗
09/27/2014140122999Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/25/2011120670201Open ↗
01/05/2009110422043Open ↗
10/29/2008110371703Open ↗
▸BISSUPERSEDING LETTER2
01/29/2015121775472Open ↗
03/04/2014121775472Open ↗
▸BISFINAL1
05/16/2022123786055Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT19
09/15/2021123786055Open ↗
09/10/2020123789640Open ↗
01/09/2020123789640Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/16/2022123786055Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET6
01/09/2020123789640Open ↗
10/15/2019123786055Open ↗
11/29/2016122912697Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
09/15/2021123786055Open ↗
02/14/2020123789640Open ↗
10/15/2019123786055Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/18/2018122912697Open ↗
09/07/2017122783728Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/09/2013140122999Open ↗