← Back
Elevator apt, semi-fireproof without stores
425 EAST 84 STREET
MANHATTAN · BIN 1050488
💬 Discuss this project
1976Year Built
6Stories
D1Building Class
R8BZoning
8,470 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: MMP 425 OWNER LLC · 2,043 sf lot · 4.15 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Roof2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOTAL NY CONSTRUCTION1007/08/2026
LIVINGSTON MANAGEMENT SERVICES503/22/2026
MMP 425 OWNER LLC103/22/2026
425 E 84 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/10/2015$6.7M—— → —$790/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OSPINO ENGINEERING PLLC208/01/2024
M. HAMDI GUNAL, PE, P. C.105/20/2024
AP PROFESSIONAL ENGINEERING PLLC101/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR103/21/2026
HIERARCH-E403/21/2026
CSR EXPEDITERS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APEX GROUP NY CORPGeneral Contractor403/21/2026
TOTAL NY CONSTRUCTION CORPGeneral Contractor407/08/2026
PHARAOHS RESTORATIONGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. HAMDI GUNAL, PE, P.C.3000105/20/2024
Building Lifecycle
All (70)Filed (4)Permit Issued (6)Signed Off (2)Facade (FISP) (21)Violation (33)Special Inspection (4)
11/17/2025
Violation issued (HPD, closed)
I
07/21/2025
Cycle 10 facade report signed — SWARMP
07/09/2025
Cycle 10 facade report submitted
05/28/2025
Cycle 10 facade inspection completed
02/04/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00671797-I1
01/02/2025
Cycle 9 facade report signed — SAFE
12/17/2024
Cycle 9 facade report submitted
12/04/2024
Cycle 9 facade inspection completed
10/28/2024
Signed off — Alteration
Suspended scaffold as per plans filed herewith.
M01045227-I1
08/01/2024
Filed — Alteration
Suspended scaffold as per plans filed herewith.
M01045227-P1
07/22/2024
Filed — Alteration
Suspended scaffold as per plans filed herewith.
M01045227-S1
07/22/2024
Permit issued — Suspended Scaffold
M01045227-S1-SC
06/12/2024
Permit issued — General Construction
M01045227-I1-GC
05/20/2024
Filed — Alteration
Suspended scaffold as per plans filed herewith.
M01045227-I1
05/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Mehmet Gunal
05/02/2024
Special inspection requirement — Masonry
Mehmet Gunal
05/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mehmet Gunal
05/02/2024
Special inspection requirement — Final
Mehmet Gunal
03/01/2024
Permit issued — Sidewalk Shed
M00671797-I1-SH
03/01/2023
Permit issued — Sidewalk Shed
M00671797-I1-SH
02/09/2023
Permit issued — Sidewalk Shed
M00671797-I1-SH
01/06/2023
Cycle 9 facade report submitted
01/05/2023
Cycle 9 facade report signed — UNSAFE
11/08/2022
Cycle 9 facade inspection completed
10/14/2022
Violation issued (ECB, closed)
Construction
09/13/2022
Violation issued (ECB, closed)
Construction
08/08/2022
Violation issued (ECB, closed)
Construction
08/04/2022
Violation issued (ECB, closed)
Construction
05/25/2022
Violation issued (ECB, closed)
Construction
04/08/2022
Violation issued (ECB, closed)
Construction
03/10/2022
Violation issued (ECB, closed)
Construction
03/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2022
Cycle 9 facade report submitted
02/17/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Cycle 9 facade report signed — UNSAFE
02/01/2022
Permit issued — Sidewalk Shed
M00671797-I1-SH
01/31/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00671797-I1
01/20/2022
Cycle 9 facade inspection completed
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2021
Violation issued (ECB, open)
Elevators
10/24/2018
Violation issued (ECB, closed)
Construction
10/02/2018
Cycle 8 facade report signed — SWARMP
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2018
Violation issued (ECB, closed)
Local Law
05/08/2018
Cycle 8 facade report submitted
04/17/2018
Cycle 8 facade inspection completed
11/18/2017
Violation issued (ECB, closed)
Construction
09/19/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/14/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/14/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/25/2012
Violation issued (ECB, closed)
Elevators
08/17/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2011
Cycle 7 facade report submitted
01/19/2011
Cycle 7 facade report signed — SAFE
01/10/2011
Cycle 7 facade inspection completed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAMERICAN VENTILATION SERV07/22/2024
DOB NOWGeneral ConstructionSigned-offPHARAOHS RESTORATION06/12/2024
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP03/01/2024
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP03/01/2023
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR02/09/2023
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR02/01/2022
1 project · most recent 02/04/2022
FiledStatusContractorScope
02/04/2022Permit IssuedBDS ELECTRIC CORP.—
1 project · most recent 08/01/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/01/2024Permit IssuedAMERICAN VENTILATION SERVSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/17/2024Tenant Protection Plan ComplianceMehmet Gunalspecial
05/02/2024MasonryMehmet Gunalspecial
05/02/2024Structural Stability – Alterations of existing buildingsMehmet Gunalspecial
05/02/2024FinalMehmet Gunalprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/02/2026M00671797-I1Request digital key ↗
08/26/2026M01045227-P1Request digital key ↗
08/26/2026M01045227-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026M00671797-I1Open ↗
08/26/2026M01045227-S1Open ↗
08/26/2026M01045227-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M01045227-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M01045227-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026M01045227-I1Open ↗
▸Other Documents4
▸DOB NOWCalculations2
08/13/2026M01045227-S1Open ↗
08/13/2026M01045227-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01045227-P1Open ↗
08/13/2026M01045227-S1Open ↗