← Back
Walk-up cooperative
425 LINCOLN PLACE
BROOKLYN · Prospect Heights · BIN 3029567
💬 Discuss this project
1907Year Built
3Stories
C6Building Class
R7AZoning
5,670 sfGross Floor Area
6Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 425 LINCOLN HOUSING CORP · 2,800 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
425 LINCOLN HOUSING1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.503/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APPROVED OIL CO BROOKLYNGeneral Contractor203/21/2026
BELL FUEL OIL, LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851203/09/2022
Building Lifecycle
All (40)Filed (5)Permit Issued (3)Signed Off (3)Violation (22)Inspection (2)Special Inspection (5)
04/10/2024
Violation issued (HPD, closed)
A
03/23/2023
Violation issued (HPD, closed)
A
06/07/2022
Signed off — Alteration
REPLACE GAS BOILER
B00581359-I1
06/07/2022
Signed off — Alteration
B00582143-I1
06/07/2022
Signed off — Alteration
GAS CONNECTION TO NEW GAS WATER HEATER AND REPLACEMENT GAS BOILER.
B00582469-I1
05/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2022
Filed — Alteration
REPLACE GAS BOILER
B00581359-P1
03/09/2022
Filed — Alteration
GAS CONNECTION TO NEW GAS WATER HEATER AND REPLACEMENT GAS BOILER.
B00582469-P1
03/09/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
03/09/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/09/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/07/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/25/2022
Violation issued (HPD, closed)
A
09/28/2021
Permit issued — General Construction
B00582143-I1-GC
09/27/2021
Permit issued — Plumbing
B00582469-I1-PL
09/27/2021
Permit issued — Boiler Equipment
B00581359-I1-BE
09/09/2021
Filed — Alteration
REPLACE GAS BOILER
B00581359-I1
09/09/2021
Filed — Alteration
B00582143-I1
09/09/2021
Filed — Alteration
GAS CONNECTION TO NEW GAS WATER HEATER AND REPLACEMENT GAS BOILER.
B00582469-I1
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2004
Violation issued (ECB, closed)
Boilers
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/14/1988
Violation issued (HPD, open)
A
07/14/1988
Violation issued (HPD, closed)
B
07/14/1988
Violation issued (HPD, closed)
B
07/14/1988
Violation issued (HPD, closed)
B
07/14/1988
Violation issued (HPD, closed)
B
07/14/1988
Violation issued (HPD, open)
B
06/10/1988
Violation issued (HPD, closed)
C
06/08/1988
Violation issued (HPD, closed)
B
06/08/1988
Violation issued (HPD, open)
A
06/08/1988
Violation issued (HPD, closed)
C
06/08/1988
Violation issued (HPD, closed)
B
06/08/1988
Violation issued (HPD, open)
B
06/08/1988
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAPPROVED OIL CO BROOKLYN09/28/2021
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC09/27/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC09/27/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/09/2022Heating SystemsLOUIS ARENAspecial
03/09/2022Maintenance informationLOUIS ARENAenergy_progress
03/09/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/09/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/09/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00582469-I1Request digital key ↗
09/01/2026B00582469-P1Request digital key ↗
09/01/2026B00582143-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00582469-I1Open ↗
09/01/2026B00582469-P1Open ↗
09/01/2026B00582143-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00581359-I1Open ↗
08/24/2026B00582469-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00581359-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00582469-I1Open ↗
09/01/2026B00582469-P1Open ↗
09/01/2026B00582143-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00581359-I1Open ↗