DOB03/04/2026BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421915397-01-AL DUE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL
DOB03/04/2026BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421915397-01-AL DUE TO GENERAL CONTRACTOR OF CONSTRUCTION WITHDRAWAL
DOB03/03/2022BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421915397 D UE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL
DOB12/22/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB09/28/2021FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONST-MISSING/INADEQUATE GUARDRAILS.ATOI@ACTIVE JOBSITE ALT1 FOR ENLARGEMENTOF EXISTING BLDG TO 4STYB,IT WAS OBSERVED FAILURE TO PROVIDE ADEQUATE$25K due
ECB09/28/2021BC3314.4.8 FAILURE TO MAINTAIN SUPPORTED PIPE SCF.ATOI@ACTIVE JOBSITE ALT1 FOR VERT EXPANSION,IT WAS OBSERVED FAILURE TO ADEQUATELY INSTALL/MAINTAIN SUPPORTEDPIPE SCF@EXP4,(ILLEGIBLE) WORK PLATFORMS ARENT TIED$6K due
ECB09/28/2021WORK DOESNT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS-COLDFORM STEEL:ATOI@ACTIVE JOBSITE ALT1 FOR ENLARGEMENT FROM 2-4STY RESIDENTIAL BLDG,IT WAS OBSERVED COLD FORM STEEL WORK WAS CONTRARY TO APPR$6K due
ECB09/28/2021FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONST OPS:MISSING OVERHEAD PROTECTIONS@EXP4.ATOI@ACTIVE JOBSITE ALT1 FOR ENLARGEMENT OF EXISTING 2-4STY RESIDENTIAL BLDG,IT WAS OBSERVED FAILURE TO PROVIDE$6K due
ECB09/28/2021BC3301.6 DESIGN,SIZES&CAPACITY OF MATERIALS,STRUCTURES,TEMP CONST&EQUIPMENTS:NO DESIGN DRAWING FOR TEMP PLATFORMS.ATOI@ACTIVE JOBSITE ALT1 FOR ENLARGEMENT OF EXISTING BLDG IN WAS OBSERVED TEMP PLATFORMS ON VARI$6K due
Two stories - detached, small or mid-size · Owner of record: SRT MANAGEMENT LLC · 4,945 sf lot · 0.71 FAR built · Flood zone AE