← Back
BuildNYC
Church, synagogue, chapel
Stuyvesant Heights Seventh Day Adventist Church
426 LEXINGTON AVENUE · Name © OpenStreetMap contributors · BIN 3050718
💬 Discuss this project
1931Year Built
1Stories
M1Building Class
R6BZoning
5,000 sfGross Floor Area
1Units
2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: Northeastern Conference Corp of Seventh- Day Afdven · 5,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stuyvesant103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brent M. Porter, Architect, and Associates105/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Enkay Design Consulting203/21/2026
Building Lifecycle
All (22)Filed (1)Violation (3)Objection (7)Special Inspection (11)
05/19/2021
Objection raised — Accessibility
05/19/2021
Objection raised — Structural
05/19/2021
Objection raised — Energy
05/19/2021
Objection raised — Fire_Protection
05/19/2021
Objection raised — Scope
05/19/2021
Objection raised — Other
05/19/2021
Objection raised — Inspections
05/11/2021
Filed — Alteration CO
CONVERSION OF EXISTING NON-CONFORMING USE (FACTORY) TO CONFORMING USE (CHURCH). INTER. RENOV.: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINS & LIGHT FIXTS. INSTALLATION OF NEW GWB, FLR, CLG & WALL FINS. INSTALLATION OF REPLACEMENT LIGHT FIXTS.
B00496448-I1
05/11/2021
Special inspection requirement — Lighting controls
05/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/11/2021
Special inspection requirement — Energy Code Compliance Inspections
05/11/2021
Special inspection requirement — Fire-Resistance Rated Construction
05/11/2021
Special inspection requirement — Air barrier - visual inspection
05/11/2021
Special inspection requirement — Fenestration air leakage
05/11/2021
Special inspection requirement — Exterior lighting power
05/11/2021
Special inspection requirement — Interior lighting power
05/11/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
05/11/2021
Special inspection requirement — Vestibules
04/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/20/2000
Work without a permit. Work noted: new sheet rock walls and ceilling installed and completed at interior rear-framing partitions and ceil- ings out…
DOB violation · closed · Issued 2000; DOB's record still lists it as active
01/20/2000
Work without a permit.work noted:new sheet rock walls & ceilinhg installed & completed at interior rear(2)framing & partitions & ceilings out of…
ECB violation · open
01/20/2000
Occupancy contrary to that allowed by the building dept. Records . Bldg dept. Computer index indicate . 1 story factory ,now building is now being…
ECB violation · open
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00496448-I1Request the plans ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/01/2026B00496448-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B00496448-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B00496448-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/15/2026B00496448-I1Open ↗