ECB01/20/2000Work without a permit.work noted:new sheet rock walls & ceilinhg installed & completed at interior rear(2)framing & partitions & ceilings out of 21/2 metal studs(3)new electrical cable installed at front sectioNothing owed — awaiting certificate of correction
ECB01/20/2000Occupancy contrary to that allowed by the building dept. Records . Bldg dept. Computer index indicate . 1 story factory ,now building is now being used as a church. Also sign at building ,front display; stuyvNothing owed — awaiting certificate of correction
Church, synagogue, chapel · Owner of record: Northeastern Conference Corp of Seventh- Day Afdven · 5,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
All (22)Filed (1)Violation (3)Objection (7)Special Inspection (11)
05/19/2021
Objection raised — Accessibility
05/19/2021
Objection raised — Structural
05/19/2021
Objection raised — Energy
05/19/2021
Objection raised — Fire_Protection
05/19/2021
Objection raised — Scope
05/19/2021
Objection raised — Other
05/19/2021
Objection raised — Inspections
05/11/2021
Filed — Alteration CO
CONVERSION OF EXISTING NON-CONFORMING USE (FACTORY) TO CONFORMING USE (CHURCH). INTER. RENOV.: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINS & LIGHT FIXTS. INSTALLATION OF NEW GWB, FLR, CLG & WALL FINS. INSTALLATION OF REPLACEMENT LIGHT FIXTS.
B00496448-I1
05/11/2021
Special inspection requirement — Lighting controls
05/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/11/2021
Special inspection requirement — Energy Code Compliance Inspections
05/11/2021
Special inspection requirement — Fire-Resistance Rated Construction
05/11/2021
Special inspection requirement — Air barrier - visual inspection
05/11/2021
Special inspection requirement — Fenestration air leakage
05/11/2021
Special inspection requirement — Exterior lighting power
05/11/2021
Special inspection requirement — Interior lighting power
05/11/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
05/11/2021
Special inspection requirement — Vestibules
04/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/20/2000
Work without a permit. Work noted: new sheet rock walls and ceilling installed and completed at interior rear-framing partitions and ceil- ings out…
DOB violation · closed · Issued 2000; DOB's record still lists it as active
01/20/2000
Work without a permit.work noted:new sheet rock walls & ceilinhg installed & completed at interior rear(2)framing & partitions & ceilings out of…
ECB violation · open
01/20/2000
Occupancy contrary to that allowed by the building dept. Records . Bldg dept. Computer index indicate . 1 story factory ,now building is now being…