Public elementary, junior or senior high
4263 3 AVENUE
BRONX · Tremont · BIN 2129815
💬 Discuss this project
2025Year Built
6Stories
W1Building Class
M1-4/R7AZoning
65,231 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: TREMONT PARK FACILITY LLC · 13,371 sf lot · 4.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction299p · 3 filings · 20 docs
Floor 6Under Construction282p · 2 filings · 20 docs
Floor 5Under Construction282p · 2 filings · 20 docs
Floor 4Under Construction282p · 2 filings · 20 docs
Floor 3Under Construction282p · 2 filings · 20 docs
Floor 2Under Construction282p · 2 filings · 20 docs
Floor 1Under Construction282p · 2 filings · 20 docs
CellarUnder Construction277p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEM CONTRACTING304/09/2026
TREMONT PARK FACILITY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WESBUILT CONSTRUCTION MANGeneral Contractor907/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor909/16/2026
MILL BROOK FIRE PROTECTIONFire Protection607/08/2026
METROTECH MECHANICAL CORPPlumbing407/30/2026
JEM CONTRACTING CORPGeneral Contractor407/08/2026
A M A HOLDINGSScaffold208/11/2026
NEPTUNE MECHANICAL INCFire Protection107/08/2026
KG SPRINKLER CORPFire Protection108/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432806/04/2026
ANCORA ENGINEERING, PLLC6818301/05/2026
Building Lifecycle
All (250)Filed (57)Permit Issued (41)Signed Off (5)Violation (7)Inspection (31)Objection (79)Special Inspection (30)
09/15/2026
Permit issued — Construction Fence
X01111270-I1-FN
09/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2026
Permit issued — Sidewalk Shed
X01111270-S2-SH
08/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/10/2026
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR BRONX TREMONT PARK SCHOOL - IN PROPERTY LINES - Z. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01409099-I1
08/10/2026
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR BRONX TREMONT PARK SCHOOL - IN PROPERTY LINES - ZETA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01409098-I1
08/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Permit issued — Sprinklers
X01386179-I1-EW-SP
08/05/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/03/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/29/2026
Permit issued — Plumbing
X01052617-Z1-PL
07/17/2026
Permit issued — Sign
X01409098-I1-SG
07/16/2026
Permit issued — Sign
X01409099-I1-SG
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, closed)
Construction
07/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR BRONX TREMONT PARK SCHOOL - IN PROPERTY LINES - Z. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01409099-I1
06/16/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY SIGN FOR BRONX TREMONT PARK SCHOOL - IN PROPERTY LINES - ZETA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01409098-I1
06/16/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01365434-P1
06/16/2026
Special inspection requirement — Final
LEON SKVIRSKY
06/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2026
Filed — Alteration
Temp Spinkler loop for Annex portion of building
X01386179-I1
06/03/2026
Permit issued — Mechanical Systems
X01052617-S7-MS
05/29/2026
Filed — No Work
X01064340-I1
05/29/2026
Filed — No Work
X01064343-I1
05/29/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/29/2026
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
05/28/2026
Permit issued — Sidewalk Shed
X01111270-S2-SH
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01365434-I1
05/05/2026
Permit issued — Supported Scaffold
X01365434-I1-SF
05/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/01/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
04/30/2026
Filed — New Building
Sprinkler/Standpipe for NB
X01052617-C4
04/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/21/2026
Objection resolved — Resolved
04/17/2026
Permit issued — Standpipe
X01120673-I1-EW-SD
04/17/2026
Permit issued — Supported Scaffold
X01111270-S5-SF
04/16/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01111270-S5
04/16/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01111270-P5
04/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 250 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP09/15/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP08/24/2026
DOB NOWSprinklersPermit IssuedKG SPRINKLER CORP08/06/2026
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP07/29/2026
DOB NOWSignSigned-offA.M.A HOLDINGS INC07/17/2026
DOB NOWSignSigned-offA.M.A HOLDINGS INC07/16/2026
DOB NOWMechanical SystemsPermit IssuedWESBUILT CONSTRUCTION MAN06/03/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP05/28/2026
DOB NOWSupported ScaffoldPermit IssuedJEM CONTRACTING CORP05/05/2026
DOB NOWStandpipeSigned-offMILL BROOK FIRE PROTECTION04/17/2026
DOB NOWSupported ScaffoldPermit IssuedROCKLEDGE SCAFFOLD CORP04/17/2026
DOB NOWSupported ScaffoldPermit IssuedJEM CONTRACTING CORP03/27/2026
DOB NOWFoundationPermit IssuedWESBUILT CONSTRUCTION MAN03/26/2026
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN03/20/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP02/27/2026
DOB NOWSupport of ExcavationPermit IssuedWESBUILT CONSTRUCTION MAN01/20/2026
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP01/20/2026
DOB NOWFoundationPermit IssuedWESBUILT CONSTRUCTION MAN12/15/2025
DOB NOWSupported ScaffoldPermit IssuedJEM CONTRACTING CORP12/11/2025
DOB NOWStructuralPermit IssuedWESBUILT CONSTRUCTION MAN12/10/2025
DOB NOWStandpipePermit IssuedLEGUCI PIPING&HEATING LLC12/04/2025
DOB NOWStandpipePermit IssuedLEGUCI PIPING&HEATING LLC12/04/2025
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN11/21/2025
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP09/18/2025
DOB NOWMechanical SystemsPermit IssuedWESBUILT CONSTRUCTION MAN05/14/2025
DOB NOWSupported ScaffoldPermit IssuedJEM CONTRACTING CORP04/24/2025
DOB NOWStandpipeSigned-offLEGUCI PIPING&HEATING LLC04/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP04/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP04/01/2025
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP03/06/2025
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP01/22/2025
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP01/14/2025
DOB NOWStandpipePermit IssuedLEGUCI PIPING&HEATING LLC01/07/2025
DOB NOWStandpipePermit IssuedLEGUCI PIPING&HEATING LLC01/07/2025
DOB NOWStructuralPermit IssuedWESBUILT CONSTRUCTION MAN12/11/2024
DOB NOWFoundationPermit IssuedWESBUILT CONSTRUCTION MAN12/10/2024
DOB NOWGeneral ConstructionPermit IssuedWESBUILT CONSTRUCTION MAN11/20/2024
DOB NOWStandpipeSigned-offNEPTUNE MECHANICAL INC11/12/2024
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP09/27/2024
DOB NOWConstruction FenceSigned-offROCKLEDGE SCAFFOLD CORP09/16/2024
+ 2 more permits on file
2 projects · most recent 06/04/2026
Sprinkler System
FiledStatusContractorScope
06/04/2026Permit IssuedKG SPRINKLER CORP12 heads
04/30/2026Permit IssuedLEGUCI PIPING&HEATING LLCSprinkler System
1 project · most recent 04/30/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/30/2026Permit IssuedMETROTECH MECHANICAL CORPStorm, Water/Sanitary
6 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedANTHONY G FERRY INC—
12/12/2025Permit IssuedPATRIOT ELECTRIC CORPGeneral Wiring
12/04/2025Permit IssuedPATRIOT ELECTRIC CORP2 meters, 2 new_meters
05/11/2025Permit IssuedTF ELECTRICAL CORPGeneral Wiring
03/24/2025Permit IssuedPATRIOT ELECTRIC CORP—
01/30/2025Permit IssuedPATRIOT ELECTRIC CORPGeneral Wiring
1 project · most recent 04/30/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/30/2026Permit IssuedMETROTECH MECHANICAL CORPSteel, Concrete, Masonry
3 projects · most recent 06/16/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/16/2026Permit IssuedJEM CONTRACTING CORPScaffold
04/30/2026Permit IssuedMETROTECH MECHANICAL CORPScaffold
04/16/2026Permit IssuedROCKLEDGE SCAFFOLD CORPScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
09/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2026Pass-Final PL - UndergroundPassView ↗
08/03/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/18/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/31/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/16/2026FinalLEON SKVIRSKYprogress
05/29/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
05/29/2026Fenestration areasJOHN MCMONAGLEenergy_progress
05/29/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
05/29/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/29/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/29/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
05/29/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
05/29/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
05/29/2026Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
05/29/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
05/29/2026VestibulesJOHN MCMONAGLEenergy_progress
05/27/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
05/27/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
05/27/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/27/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/01/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
04/16/2026Sprinkler SystemsJOHN MCMONAGLEspecial
04/16/2026Standpipe SystemsJOHN MCMONAGLEspecial
04/13/2026Sprinkler SystemsJOHN MCMONAGLEspecial
03/06/2026VestibulesJOHN MCMONAGLEenergy_progress
03/06/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
03/06/2026Fenestration areasJOHN MCMONAGLEenergy_progress
03/06/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
03/06/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
Latest 25 of 150.
▾Documents — 320 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch57
08/21/2026X01102806-I1Request digital key ↗
08/20/2026X01120673-I1Request digital key ↗
08/20/2026X01120673-P1Request digital key ↗
Showing 3 of 57 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZoning Exhibit form (1-5)6
08/19/2026X01052617-I1Open ↗
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/19/2026X01052617-I1Open ↗
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/19/2026X01052617-I1Open ↗
▸Seals & Professional Certifications122
▸DOB NOWDPL-1: Design Professional Seal & Signature58
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A4Open ↗
08/19/2026X01052617-Z2Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
09/25/2026X01052617-B8Open ↗
09/01/2026X01052617-B6Open ↗
09/01/2026X01052617-A7Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/25/2026X01052617-B8Open ↗
09/25/2026X01052617-B8Open ↗
09/25/2026X01052617-B8Open ↗
Showing 3 of 30 on file for this type
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/19/2026X01052617-A2Open ↗
08/19/2026X01052617-P4Open ↗
08/19/2026X01052617-S9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/19/2026X01052617-I1—
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist8
08/19/2026X01052617-I1Open ↗
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/19/2026X01052617-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWOER: Notice to Proceed24
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
08/19/2026X01052617-P4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/19/2026X01052617-S4Open ↗
08/19/2026X01052617-I1Open ↗
08/19/2026X01052617-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/19/2026X01052617-P2Open ↗
08/19/2026X01052617-P1Open ↗
08/19/2026X01052617-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHydrant Flow Test Letter4
08/19/2026X01052617-P7Open ↗
08/19/2026X01052617-S8Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/19/2026X01052617-S3Open ↗
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter45
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
08/19/2026X01052617-A1Open ↗
Showing 3 of 45 on file for this type
▸Other Documents27
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
08/19/2026X01052617-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/19/2026X01052617-I1Open ↗
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification6
08/19/2026X01052617-I1Open ↗
08/19/2026X01052617-A5Open ↗
08/19/2026X01052617-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHydraulic Calculations4
08/19/2026X01052617-P7Open ↗
08/19/2026X01052617-S8Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/19/2026X01052617-S2Open ↗