← Back
BuildNYC
Predominantly retail with other uses
427 7TH AVENUE
MANHATTAN · BIN 1087308
💬 Discuss this project
1924Year Built
3Stories
K4Building Class
C6-6Zoning
4,373 sfGross Floor Area
2Units
0 Active Violations
Predominantly retail with other uses · Owner of record: FO 427 Seventh Avenue · 1,180 sf lot · 3.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVornado Realty TrustUnder Construction7p · 4 filings · 20 docs
Floor 4Vornado Realty TrustUnder Construction2 filings · 12 docs
Floor 3Vornado Realty TrustUnder Construction2 filings · 12 docs
Floor 2Vornado Realty TrustUnder Construction2 filings · 12 docs
Floor 1Vornado Realty TrustUnder Construction10p · 3 filings · 18 docs
CellarVornado Realty TrustUnder Construction2 filings · 12 docs
Site & exteriorVornado Realty TrustUnder Construction16p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust1910/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2019$30.0M—DK CHINA LLC → FO 427 SEVENTH AVENUE LLC$6,860/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold409/15/2026
Andamio ScaffoldingScaffold303/21/2026
Platinum Services NYScaffold207/08/2026
Balaton ConsultingSign hanger207/08/2026
Tri-Star ConstructionGeneral Contractor104/09/2026
W5 GroupGeneral Contractor109/02/2026
Building Lifecycle
All (49)Filed (15)Permit Issued (11)Signed Off (3)Violation (1)Objection (2)Special Inspection (17)
10/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01469950-I1
09/24/2026
Filed — Full Demolition
FULL DEMOLITION 4-STORY BUILDING.
M01414574-S2
09/14/2026
Permit issued — Supported Scaffold
M01430519-S2-SF
09/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY FALL PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01430519-S2
09/01/2026
Permit issued — General Construction
M01431538-I1-GC
08/28/2026
Permit issued — Protection and Mechanical Methods
M01430519-S3-PMM
08/28/2026
Objection resolved — Open
08/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY FALL PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01430519-S3
08/19/2026
Special inspection requirement — Final
PETER STROH
08/18/2026
Filed — Alteration
Interior demolition of floors cellar thru 4 and remove mechanical equipment on roof
M01431538-P1
08/17/2026
Special inspection requirement — Final
08/07/2026
Permit issued — Sidewalk Shed
M01430519-S1-SH
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY FALL PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01430519-S1
07/29/2026
Filed — Alteration
Interior demolition of floors cellar thru 4 and remove mechanical equipment on roof
M01431538-I1
07/21/2026
Filed — Full Demolition
FULL DEMOLITION 4-STORY BUILDING.
M01414574-S1
07/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY FALL PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01430519-I1
07/16/2026
Permit issued — Construction Fence
M01430519-I1-FN
07/09/2026
Objection raised — Admin
07/06/2026
Special inspection requirement — Demolition
07/02/2026
Filed — Full Demolition
FULL DEMOLITION 4-STORY BUILDING.
M01414574-I1
06/24/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
06/24/2026
Special inspection requirement — Demolition
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
06/12/2026
Permit issued — Construction Fence
M01170123-I1-FN
06/16/2025
Permit issued — Construction Fence
M01170123-I1-FN
06/14/2025
Filed — Alteration
M01170123-I1
06/11/2025
Permit issued — General Construction
M01172134-I1-GC
06/05/2025
Filed — Alteration
Installation of new storefront on the 1st floor as indicated on drawings.
M01172134-I1
03/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
03/11/2025
Special inspection requirement — Insulation placement and R values
Ryan Hansen
03/11/2025
Special inspection requirement — Air barrier - visual inspection
Ryan Hansen
03/11/2025
Special inspection requirement — Fenestration air leakage
Ryan Hansen
03/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Ryan Hansen
03/11/2025
Special inspection requirement — Air barrier continuity plan testing
Ryan Hansen
03/11/2025
Special inspection requirement — Fenestration areas
Ryan Hansen
03/11/2025
Special inspection requirement — Air barrier — testing
Ryan Hansen
01/27/2025
Special inspection requirement — Final
Ryan Hansen
07/20/2022
Signed off — Alteration
REPLACE EXISTING LED FLASHING ROOF SIGN FILED UNDER BIS#121686130
M00638507-I1
07/20/2022
Signed off — Alteration
REPLACE EXISTING LED FLASHING ROOF SIGN FILED UNDER BIS#121686363
M00638513-I1
02/22/2022
Signed off — Alteration
M00638354-I1
01/27/2022
Filed — Alteration
REPLACE EXISTING LED FLASHING ROOF SIGN FILED UNDER BIS#121686130
M00638507-I1
01/27/2022
Filed — Alteration
REPLACE EXISTING LED FLASHING ROOF SIGN FILED UNDER BIS#121686363
M00638513-I1
01/27/2022
Permit issued — Sign
M00638507-I1-SG
01/27/2022
Permit issued — Sign
M00638513-I1-SG
01/19/2022
Special inspection requirement — Final
LEON SKVIRSKY
01/18/2022
Special inspection requirement — Final
LEON SKVIRSKY
12/06/2021
Permit issued — Sidewalk Shed
M00638354-I1-SH
12/04/2021
Filed — Alteration
M00638354-I1
11/18/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedSpring Scaffolding09/14/2026
DOB NOWGeneral ConstructionPermit IssuedW5 Group09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding08/28/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding08/07/2026
DOB NOWConstruction FencePermit IssuedSpring Scaffolding07/16/2026
DOB NOWConstruction FencePermit IssuedPlatinum Services NY06/12/2026
DOB NOWConstruction FencePermit IssuedPlatinum Services NY06/16/2025
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction06/11/2025
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/27/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/27/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding12/06/2021
BISEQISSUEDSpring Scaffolding07/30/2013
BISOTISSUEDNorth Shore Neon Sign07/10/2013
BISOTISSUEDNorth Shore Neon Sign07/10/2013
BIS—ISSUEDNorth Shore Neon Sign Co06/26/2013
BIS—ISSUEDNorth Shore Neon Sign Co06/18/2013
4 projects · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedTop Shelf Electric—
01/27/2022CompleteCity Electrical Sign Erectors—
01/27/2022CompleteCity Electrical Sign Erectors—
12/07/2021CompleteBorowide Elect'l Contractors—
2 projects · most recent 10/07/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
10/07/2026——Fence
09/13/2026Permit IssuedSpring ScaffoldingFence, Scaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/19/2026FinalPETER STROHprogress
08/17/2026Final—progress
07/06/2026Demolition—special
06/24/2026Construction Operations Influencing Adjacent Structures—special
06/24/2026Demolition—special
06/24/2026Structural Stability – Alterations of existing Buildings—special
03/18/2025Fire-Resistance Rated ConstructionRyan Hansenprogress
03/11/2025Insulation placement and R valuesRyan Hansenenergy_progress
03/11/2025Air barrier - visual inspectionRyan Hansenenergy_progress
03/11/2025Fenestration air leakageRyan Hansenenergy_progress
03/11/2025Fenestration and door U-factor and product ratingsRyan Hansenenergy_progress
03/11/2025Air barrier continuity plan testingRyan Hansenenergy_progress
03/11/2025Fenestration areasRyan Hansenenergy_progress
03/11/2025Air barrier — testing Ryan Hansenenergy_progress
01/27/2025FinalRyan Hansenprogress
01/19/2022FinalLEON SKVIRSKYprogress
01/18/2022FinalLEON SKVIRSKYprogress
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
10/08/2026M01469950-I1Request digital key ↗
09/03/2026M00638354-I1Request digital key ↗
09/03/2026M00638513-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION5
07/29/2013140093397Open ↗
07/01/2013121686130Open ↗
06/21/2013121686069Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION5
07/29/2013140093397Open ↗
07/23/2013121686069Open ↗
07/23/2013121686381Open ↗
Showing 3 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/11/2014140093397Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature13
10/08/2026M01469950-I1Open ↗
09/10/2026M01430519-S3Open ↗
09/03/2026M00638354-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/22/2014121686130Open ↗
09/05/2014121686069Open ↗
09/05/2014121686069Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026M01431538-I1Open ↗
08/27/2026M00638507-I1Open ↗
08/25/2026M00638513-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
07/01/2013121686130Open ↗
06/21/2013121686069Open ↗
06/21/2013121686381Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/01/2013121686130Open ↗
06/21/2013121686069Open ↗
06/21/2013121686381Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/29/2013140093397Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/29/2013140093397Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/29/2013140093397Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026M01431538-P1Open ↗
08/16/2026M01431538-I1Open ↗
08/13/2026M01172134-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/21/2013121686069Open ↗
06/21/2013121686381Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/29/2013140093397Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/22/2014121686130Open ↗
09/05/2014121686069Open ↗
09/05/2014121686381Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/01/2013121686130Open ↗
06/21/2013121686069Open ↗
06/21/2013121686381Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTransit Authority Approval3
09/03/2026M00638513-I1Open ↗
08/13/2026M01172134-I1Open ↗
08/13/2026M00638507-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/15/2013121686130Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
07/29/2013140093397Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
10/22/2014121686130Open ↗
09/05/2014121686069Open ↗
09/05/2014121686381Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
07/01/2013121686130Open ↗
06/21/2013121686069Open ↗
06/21/2013121686363Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/29/2013140093397Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/15/2026M01414574-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026M01414574-I1Open ↗