← Back
Single or multiple dwelling with stores or offices
427 CENTRAL AVENUE
BROOKLYN · BIN 3077050
💬 Discuss this project
1910Year Built
3Stories
S9Building Class
R6Zoning
4,700 sfGross Floor Area
4Units
45 Open Violations 44 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: CENTRAL-MADISON LLC · 2,540 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Cellar5p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL-MADISON LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A M ENGINEERING SERVICES PC207/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM ENGINEERING SERVICES403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975107/22/2025
Building Lifecycle
All (86)Filed (2)Violation (60)Objection (19)Special Inspection (5)
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
05/06/2026
Violation issued (ECB, open)
Construction
03/24/2026
Objection raised — Structural
03/10/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Cost
02/13/2026
Objection resolved — Addressed
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Admin
10/15/2025
Objection raised — Scope
10/03/2025
Objection resolved — Addressed
09/29/2025
Objection raised — Admin
09/11/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Plumbing
08/06/2025
Objection raised — Plumbing
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Scope
07/22/2025
Filed — Alteration
Application filed to remove cap and seal 3 piece bathroom (Shower, toilet, lavatory),kitchen sink and gas range from cellar level.
B01257997-S1
07/22/2025
Filed — Alteration
Application filed to remove cap and seal 3 piece bathroom (Shower, toilet, lavatory),kitchen sink and gas range from cellar level.
B01257997-I1
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
07/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Albert Munoz
07/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
C
10/18/2024
Violation issued (HPD, open)
C
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
C
10/18/2024
Violation issued (HPD, open)
C
10/18/2024
Violation issued (HPD, open)
C
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
C
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, open)
B
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, open)
B
10/15/2024
Violation issued (HPD, open)
I
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, closed)
C
10/14/2024
Violation issued (HPD, closed)
C
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
C
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
10/14/2024
Violation issued (HPD, open)
B
Latest 60 of 86 events.
Nothing on file for this building.
1 project · most recent 07/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2025——Gas, Water/Sanitary
1 project · most recent 07/02/2025
General Wiring
FiledStatusContractorScope
07/02/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/22/2025Fire-Resistant Penetrations and JointsAlbert Munozspecial
07/22/2025Tenant Protection Plan ComplianceAlbert Munozspecial
07/22/2025Tenant Protection Plan Compliance—special
07/22/2025Fire-Resistant Penetrations and Joints—special
07/22/2025Fire-Resistance Rated Construction—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01257997-S1Request digital key ↗
08/21/2026B01257997-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01257997-S1Open ↗
08/13/2026B01257997-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01257997-S1Open ↗
08/26/2026B01257997-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01257997-S1Open ↗
08/13/2026B01257997-I1Open ↗