← Back
BuildNYC
Three families
427 PENNSYLVANIA AVENUE
BROOKLYN · BIN 3084449
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6Zoning
3,000 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · Owner of record: 427 Pennsylvania · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 20 docs
Floor 331p · 1 filing · 20 docs
Floor 234p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Site & exterior27p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AY Consulting2507/08/2026
427 Pennsylvania103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2024$930K—Private party → 427 PENNSYLVANIA LLC$310/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates604/01/2025
Vasilios Artemiou PE111/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1003/21/2026
Advanced Builders Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WorksGeneral Contractor707/08/2026
S & J IndustrialFire Protection207/08/2026
Kishan PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616904/01/2025
Building Lifecycle
12/18/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01094145-I1-GC
07/17/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01094145-I1
B01094145-S2
06/25/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01094145-I1
B01094145-S3
05/19/2025
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01094145-I1
B01094145-S1
05/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
81 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offS & J Industrial04/23/2025
DOB NOWGeneral ConstructionPermit IssuedJSB Works02/11/2025
DOB NOWSprinklersSigned-offS & J Industrial12/23/2024
DOB NOWMechanical SystemsSigned-offJSB Works12/17/2024
DOB NOWPlumbingSigned-offN and S Plumbing12/13/2024
DOB NOWGeneral ConstructionPermit IssuedJSB Works12/02/2024
1 project · most recent 04/01/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
04/01/2025Permit IssuedJSB WorksHeating and Air Conditioning Systems
1 project · most recent 04/01/2025
Sprinkler System
FiledStatusContractorScope
04/01/2025Signed-offS & J IndustrialSprinkler System
1 project · most recent 04/01/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/01/2025Signed-offKishan PlumbingGas, Water/Sanitary
2 projects · most recent 12/02/2024
General Wiring
FiledStatusContractorScope
12/02/2024CompletePower Direct Electric—
12/02/2024CompletePower Direct ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
04/30/2025Maintenance informationFAHAD FATEHenergy_progress
04/30/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/30/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/30/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/09/2025Interior lighting powerFAHAD FATEHenergy_progress
04/09/2025Fenestration areasFAHAD FATEHenergy_progress
04/09/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/09/2025MeteringFAHAD FATEHenergy_progress
04/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/09/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/09/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/09/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/09/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/09/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/09/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/09/2025Permanent certificateFAHAD FATEHenergy_progress
03/19/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/19/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
03/19/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/19/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
Latest 25 of 58.
47 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account