← Back
BuildNYC
Self-storage warehouse
428 EAST 92ND STREET
MANHATTAN · BIN 1050759
💬 Discuss this project
2020Year Built
6Stories
E7Building Class
C8-4Zoning
44,386 sfGross Floor Area
1Units
LL97 Covered1 Active Violation ▸FDNY Report ↗
Self-storage warehouse · 7,553 sf lot · 5.88 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCS SJM E.92ndStreet Owner LLC2p · 1 filing · 5 docs
Floor 6CS SJM E.92ndStreet Owner LLC4p · 1 filing · 5 docs
Floor 5CS SJM E.92ndStreet Owner LLC4p · 1 filing · 5 docs
Floor 4CS SJM E.92ndStreet Owner LLC4p · 1 filing · 5 docs
Floor 3CS SJM E.92ndStreet Owner LLC4p · 1 filing · 5 docs
Floor 2CS SJM E.92ndStreet Owner LLC3p · 1 filing · 5 docs
Floor 1CS SJM E.92ndStreet Owner LLC4p · 1 filing · 5 docs
CellarCS SJM E.92ndStreet Owner LLC4p · 1 filing · 5 docs
Site & exteriorCs Sjm E92nd Street Owner, LLC25p · 13 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CS SJM E92ND Street Owner5507/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
J.A.M. Associates203/21/2026
Green Studio403/21/2026
Expedite Dem203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold807/08/2026
Balaton ConsultingSign hanger507/08/2026
North Shore Neon Signspecialty_contractor403/21/2026
Spire Scaffolding & HoistScaffold407/08/2026
Always FirstScaffold403/21/2026
The Zenith GroupGeneral Contractor303/22/2026
Casino Plumbing & HeatingFire Protection207/08/2026
City Electrical Sign ErectorsElectrical203/21/2026
Jam ElectricalGeneral Contractor203/22/2026
Kings Group NYScaffold207/08/2026
The Zenith GroupScaffold207/08/2026
Jam ElectricalElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sterling Engineering Service1012102/05/2021
Building Lifecycle
All (97)Filed (15)Permit Issued (21)Signed Off (14)Violation (38)Special Inspection (9)
10/01/2024
Violation issued (ECB, open)
Construction
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/07/2022
Signed off — Alteration
construction fence to protect site during construction
M00015516-I1
05/20/2022
Permit issued — Construction Fence
M00015516-I1-FN
03/02/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS.SIDEWALK SHED LIVE LOAD WILL BE 300 PSF. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00387157-I1
01/14/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00115903-I1
01/14/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00115895-I1
01/04/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00434735-I1
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2021
Signed off — Alteration
Erect non-illuminated accessory business wall sign copy reading "Loading"
M00490614-I1
10/05/2021
Signed off — Alteration
Erect steel flag pole on exterior facade
M00490975-I1
10/05/2021
Signed off — Alteration
Erect non-illuminated accessory business wall sign copy reading "Rental Office"
M00490599-I1
10/05/2021
Signed off — Alteration
Erect steel flag pole on exterior facade
M00490963-I1
10/05/2021
Signed off — Alteration
Erect illuminated accessory business D/F projecting sign copy reading "Public Storage"
M00490559-I1
10/05/2021
Signed off — Alteration
Erect illuminated accessory business projecting sign copy reading "Public Storage"
M00490552-I1
10/05/2021
Signed off — Alteration
Erect illuminated accessory business wall sign copy reading "Public Storage"
M00490584-I1
09/08/2021
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB #122961321
M00464150-I1
08/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2021
Violation issued (ECB, closed)
Unknown
06/09/2021
Violation issued (ECB, closed)
Construction
06/09/2021
Violation issued (ECB, closed)
Construction
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2021
Permit issued — Sign
M00490599-I1-SG
04/23/2021
Permit issued — Sign
M00490552-I1-SG
04/23/2021
Permit issued — Sign
M00490559-I1-SG
04/14/2021
Permit issued — General Construction
M00490963-I1-GC
04/14/2021
Permit issued — General Construction
M00490975-I1-GC
04/09/2021
Filed — Alteration
Erect non-illuminated accessory business wall sign copy reading "Loading"
M00490614-I1
04/09/2021
Filed — Alteration
Erect steel flag pole on exterior facade
M00490975-I1
04/09/2021
Filed — Alteration
Erect non-illuminated accessory business wall sign copy reading "Rental Office"
M00490599-I1
04/09/2021
Filed — Alteration
Erect steel flag pole on exterior facade
M00490963-I1
04/09/2021
Filed — Alteration
Erect illuminated accessory business D/F projecting sign copy reading "Public Storage"
M00490559-I1
04/09/2021
Filed — Alteration
Erect illuminated accessory business projecting sign copy reading "Public Storage"
M00490552-I1
04/09/2021
Filed — Alteration
Erect illuminated accessory business wall sign copy reading "Public Storage"
M00490584-I1
04/09/2021
Permit issued — Sign
M00490614-I1-SG
04/09/2021
Permit issued — Sign
M00490584-I1-SG
04/09/2021
Special inspection requirement — Final
AHMED SHAABAN
04/09/2021
Special inspection requirement — Final
AHMED SHAABAN
04/09/2021
Special inspection requirement — Final
AHMED SHAABAN
04/09/2021
Special inspection requirement — Final
AHMED SHAABAN
03/31/2021
Permit issued — Supported Scaffold
M00434735-I1-SF
03/31/2021
Permit issued — Sidewalk Shed
M00387157-I1-SH
03/23/2021
Special inspection requirement — Final
AHMED SHAABAN
03/23/2021
Special inspection requirement — Final
AHMED SHAABAN
02/12/2021
Permit issued — Standpipe
M00464150-I1-EW-SD
02/12/2021
Permit issued — Sprinklers
M00464150-I1-EW-SP
02/05/2021
Filed — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB #122961321
M00464150-I1
02/02/2021
Special inspection requirement — Sprinkler Systems
THomas DeLorenzo
02/02/2021
Special inspection requirement — Standpipe Systems
THomas DeLorenzo
12/15/2020
Violation issued (ECB, closed)
Construction
12/02/2020
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00434735-I1
12/02/2020
Permit issued — Supported Scaffold
M00434735-I1-SF
12/01/2020
Special inspection requirement — Final
FADY HABEEL
09/29/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS.SIDEWALK SHED LIVE LOAD WILL BE 300 PSF. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00387157-P1
09/18/2020
Violation issued (ECB, closed)
Construction
08/24/2020
Permit issued — Sidewalk Shed
M00387157-I1-SH
08/22/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS.SIDEWALK SHED LIVE LOAD WILL BE 300 PSF. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00387157-I1
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offThe Zenith Group05/20/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/23/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/23/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/23/2021
DOB NOWGeneral ConstructionSigned-offNorth Shore Neon Sign04/14/2021
DOB NOWGeneral ConstructionSigned-offNorth Shore Neon Sign04/14/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/09/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/09/2021
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding03/31/2021
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding03/31/2021
DOB NOWStandpipeSigned-offCasino Plumbing & Heating02/12/2021
DOB NOWSprinklersSigned-offCasino Plumbing & Heating02/12/2021
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding12/02/2020
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding08/24/2020
DOB NOWSidewalk ShedSigned-offSpire Scaffolding & Hoist01/24/2019
DOB NOWSupported ScaffoldSigned-offSpire Scaffolding & Hoist01/18/2019
DOB NOWSidewalk ShedSigned-offKings Group NY09/28/2018
DOB NOWConstruction FenceSigned-offThe Zenith Group05/25/2018
DOB NOWConstruction FenceSigned-offAlways First05/01/2018
DOB NOWConstruction FenceSigned-offAlways First03/07/2018
DOB NOWSidewalk ShedSigned-offKings Group NY02/02/2018
BIS—ISSUEDThe Zenith Group08/16/2021
BIS—ISSUEDThe Zenith Group08/02/2021
BIS—ISSUEDThe Zenith Group12/16/2020
BISEQISSUEDThe Zenith Group09/10/2020
BISPLISSUEDAqua Plumbing & Heating08/24/2020
BIS—ISSUEDThe Zenith Group07/21/2020
BIS—ISSUEDThe Zenith Group09/26/2019
BISEQISSUEDThe Zenith Group09/26/2019
BIS—ISSUED94th Street Construction03/05/2019
BISEQISSUED94th Street Construction03/05/2019
BISEQISSUEDSpire Scaffolding & Hoist02/01/2019
BISSDISSUEDPrecision Plumbing Services08/23/2018
BIS—ISSUEDAlways First05/24/2018
BIS—ISSUEDAlways First03/07/2018
BISOTISSUEDKings Group NY02/05/2018
BISEQISSUEDAll-Safe04/10/2013
BISEQISSUEDAll-Safe04/09/2012
BISEQISSUEDAll-Safe03/09/2012
BISFPISSUEDFire Guard of Long Island05/10/2006
11 projects · most recent 02/23/2022
General Wiring Lighting
FiledStatusContractorScope
02/23/2022CompleteDouble "R" Electrical ContractingGeneral Wiring
01/05/2022CancelledElectric Essentials—
01/05/2022CancelledElectric EssentialsGeneral Wiring, Lighting
10/08/2021CompleteCity Electrical Sign Erectors—
10/08/2021CompleteCity Electrical Sign Erectors—
10/08/2021CompleteCity Electrical Sign Erectors—
08/20/2020CompleteV. Vass Electric—
07/31/2020CompleteJam Electrical—
11/22/2019CompleteDouble "R" Electrical Contracting1 meters, 1 new_meters
01/23/2019CompleteTop Shelf Electric—
02/02/2018CompleteMeo Electric—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/09/2021FinalAHMED SHAABANprogress
04/09/2021FinalAHMED SHAABANprogress
04/09/2021FinalAHMED SHAABANprogress
04/09/2021FinalAHMED SHAABANprogress
03/23/2021FinalAHMED SHAABANprogress
03/23/2021FinalAHMED SHAABANprogress
02/02/2021Sprinkler SystemsTHomas DeLorenzospecial
02/02/2021Standpipe SystemsTHomas DeLorenzospecial
12/01/2020FinalFADY HABEELprogress
▾Documents — 300 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch9
09/06/2026M00016314-I1Request digital key ↗
09/06/2026M00015516-I1Request digital key ↗
09/03/2026M00490599-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00115895-I1Request digital key ↗
09/04/2026M00387157-I1Request digital key ↗
09/04/2026M00387157-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00115903-I1Request digital key ↗
09/04/2026M00434735-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00464150-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/04/2026M00464150-I1Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION29
04/14/2023123063086Open ↗
08/26/2022123063086Open ↗
06/13/2022123553234Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION15
08/17/2021122961321Open ↗
08/02/2021122961321Open ↗
08/24/2020122961321Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISDOB - ZONING DIAGRAM (ZD1)1
06/06/2023122961321Open ↗
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
03/05/2019122961321Open ↗
03/05/2019122961321Open ↗
03/05/2019122961321Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00115903-I1Open ↗
09/05/2026M00115895-I1Open ↗
09/04/2026M00387157-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/19/2026M00490599-I1Open ↗
08/31/2026M00490963-I1Open ↗
08/25/2026M00490584-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/24/2019140827906Open ↗
06/12/2018123553234Open ↗
02/03/2018140737031Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/12/2018123553234Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/24/2019140827906Open ↗
02/03/2018140737031Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/24/2019140827906Open ↗
02/03/2018140737031Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026M00464150-I1Open ↗
08/24/2026M00464150-I1Open ↗
▸Trade Schedules & Equipment26
▸BISEQUIPMENT USE PERMITS9
04/08/2022122961321Open ↗
03/22/2022122961321Open ↗
03/22/2022122961321Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/12/2018123553234Open ↗
03/22/2018122961321Open ↗
Showing 2 of 4 on file for this type
▸BISHEATING SYSTEMS2
01/25/2022122961321Open ↗
01/25/2022122961321Open ↗
▸BISSCHEDULE B - PLUMBING2
09/28/2021122961321Open ↗
02/01/2021122961321Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/22/2022122961321Open ↗
03/22/2022122961321Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/12/2023123063086Open ↗
▸BISWATER CUT-OFF1
03/08/2018123338209Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/25/2022122961321Open ↗
▸BISELECTRIC CUT-OFF1
03/08/2018123338209Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
04/26/2023122961321Open ↗
▸BISSEWER CUT-OFF1
03/08/2018123338209Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/25/2022122961321Open ↗
▸Safety & Tenant Protection10
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE6
05/25/2018123338209Open ↗
05/25/2018123338209Open ↗
05/25/2018123338209Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/08/2018123338209Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/05/2019122961321Open ↗
▸Environmental & Asbestos3
▸BISRODENT CONTROL2
05/25/2018123338209Open ↗
03/08/2018123338209Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/08/2018123338209Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/05/2019122961321Open ↗
03/05/2019122961321Open ↗
10/17/2018140737031Open ↗
Showing 3 of 8 on file for this type
▸BISFENESTRATION AIR LEAKAGE1
01/25/2022122961321Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/25/2022122961321Open ↗
▸BISEXTERIOR LIGHTING POWER1
01/25/2022122961321Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
04/28/2023122961321Open ↗
▸BISINTERIOR LIGHTING POWER1
01/25/2022122961321Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/17/2018140737031Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/25/2022122961321Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/25/2022122961321Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/03/2018140737031Open ↗
▸BISFENESTRATION AREAS1
01/25/2022122961321Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
03/19/2020122961321Open ↗
03/19/2020122961321Open ↗
03/19/2020122961321Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
01/12/2021122961321Open ↗
12/29/2020122961321Open ↗
11/27/2020122961321Open ↗
Showing 3 of 7 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7202
03/19/2020122961321Open ↗
03/19/2020122961321Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/30/2022122961321Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/26/2022122961321Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/26/2022122961321Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/26/2022122961321Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/26/2022122961321Open ↗
▸BISMASONRY1
01/26/2022122961321Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/28/2023122961321Open ↗
08/17/2021122961321Open ↗
09/27/2019122961321Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
11/22/2021122961321Open ↗
11/17/2021122961321Open ↗
09/28/2021122961321Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/21/2023123063086Open ↗
10/17/2018140737031Open ↗
Showing 2 of 3 on file for this type
▸Cost, Insurance & Ownership12
▸BISPROJECT-SPECIFIC GL INSURANCE6
08/02/2021122961321Open ↗
09/27/2019122961321Open ↗
03/05/2019122961321Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT6
04/19/2023123063086Open ↗
04/18/2023123063086Open ↗
04/13/2023123063086Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET13
06/12/2018123553234Open ↗
12/01/2017123338209Open ↗
Showing 2 of 13 on file for this type
▸BISBOROUGH INTAKE FORM9
08/17/2021122961321Open ↗
08/02/2021122961321Open ↗
03/19/2020122961321Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
10/07/2021122961321Open ↗
02/03/2021122961321Open ↗
03/05/2019122961321Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/24/2019140827906Open ↗
02/03/2018140737031Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
05/25/2018123338209Open ↗
05/25/2018123338209Open ↗
03/08/2018123338209Open ↗
Showing 3 of 7 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION2
05/25/2018123338209Open ↗
03/08/2018123338209Open ↗
▸BISSHUTOFF DAMPERS1
01/25/2022122961321Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/25/2022122961321Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00016314-I1Open ↗