← Back
BuildNYC
MANHATTAN
Linea
428 WEST 19TH STREET · BIN 1091091
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active Violations
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects428 & 432 WEST 19 ST LLC c/o ANBAU ENTERPRISES INC.2 filings
RoofOverhead protection with netting2p · 3 filings
BulkheadInterior alterations new doorUnder Construction1p · 1 filing · 4 docs
Floor 9Overhead protection with netting1p · 2 filings
Floor 8
Floor 7
Floor 6Overhead protection with netting2 filings
Floor 5Temporary heavy duty sidewalk shed and pipe scaffold1 filing
Floor 4Temporary heavy duty sidewalk shed and pipe scaffold1 filing
Floor 3Temporary heavy duty sidewalk shed and pipe scaffold1 filing
Floor 2Temporary heavy duty sidewalk shed and pipe scaffold1 filing
Floor 1Interior alterations new doorUnder Construction3p · 4 filings · 4 docs
Site & exteriorSupported scaffold installation7 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Anbau209/06/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BKSK Architects1206/29/2026
George J. Xerakias, PE105/02/2025
Gea Consulting Engineers1511/15/2024
McHenery Testing Lab106/28/2024
Paul Perdek, Prof. Engineering501/04/2024
Tohfaz Uddin PE410/10/2023
AKRF205/20/2022
Joel Phagoo P.E104/19/2022
Syed Engineering201/12/2022
Ashraf109/14/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hudson BlackGeneral Contractor108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004106/29/2026
Atlantic Engineeringlabor13812310/02/2025
Atlas ATC Engineering8011503/27/2024
Desimone Consulting Engineering5942207/26/2021
Building Lifecycle
All (223)Filed (44)Permit Issued (41)Signed Off (18)Violation (20)Inspection (18)Objection (52)Special Inspection (30)
07/14/2026
Signed off — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-I1
07/07/2026
Permit issued — General Construction
M01418666-I1-GC
06/29/2026
Filed — Alteration
Interior alteration as per plans. No change in use, egress or occupancy.
M01418666-I1
06/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
06/17/2026
Special inspection requirement — Final
ERIC BERLENT
06/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
01/20/2026
Signed off — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-S5
10/30/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Christopher O'Malley
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
10/30/2025
Special inspection requirement — Insulation placement and R values
Christopher O'Malley
10/30/2025
Special inspection requirement — Lowest Floor Elevation
Christopher O'Malley
10/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher O'Malley
10/30/2025
Special inspection requirement — Air barrier continuity plan testing
Christopher O'Malley
10/30/2025
Special inspection requirement — Fenestration areas
Christopher O'Malley
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
10/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GARY MARCUS
10/30/2025
Special inspection requirement — Preliminary
Christopher O'Malley
10/30/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Christopher O'Malley
10/30/2025
Special inspection requirement — Maintenance information
Christopher O'Malley
10/30/2025
Special inspection requirement — Fenestration air leakage
Christopher O'Malley
10/30/2025
Special inspection requirement — Protection of exposed foundation insulation
Christopher O'Malley
10/30/2025
Special inspection requirement — Vestibules
Christopher O'Malley
10/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher O'Malley
10/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Christopher O'Malley
10/02/2025
Filed — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-A9
07/16/2025
Signed off — Alteration
Installation of a pipe scaffold.
M01218568-I1
05/02/2025
Filed — Alteration
Installation of a pipe scaffold.
M01218568-I1
05/02/2025
Permit issued — Supported Scaffold
M01218568-I1-SF
04/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Signed off — Alteration
Sprinkler and Standpipe work in conjunction with NB Construction. NB filed under M00503537.
M00541020-I1
02/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/30/2025
Signed off — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-S4
01/23/2025
Filed — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-A7
01/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/21/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Christopher O'Malley
01/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GARY MARCUS
01/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher O'Malley
01/21/2025
Special inspection requirement — Preliminary
Christopher O'Malley
01/21/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Christopher O'Malley
01/21/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Christopher O'Malley
01/21/2025
Special inspection requirement — Maintenance information
Christopher O'Malley
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
01/21/2025
Special inspection requirement — Fenestration air leakage
Christopher O'Malley
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
12/10/2024
Signed off — Alteration
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE PURSUANT TO SECTION AC-28-111 AND BUILDINGS BULLETIN 2010-002.APPLICATION FILED IN CONJUNCTION WITH NB# M00503537.
M01061785-I1
12/05/2024
Signed off — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-S7
11/29/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/18/2024
Signed off — Alteration
M00714099-I1
11/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00775763-I1
11/18/2024
Signed off — Alteration
M00775753-I1
11/15/2024
Filed — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-A6
10/31/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2024
Signed off — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-S8
10/11/2024
Filed — New Building
Installation of temporary, dry standpipe system as per plans. Filed in conjunction with NB Construction.
M00503537-A5
10/10/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/08/2024
Objection raised — Other
10/08/2024
Objection resolved — Addressed
10/04/2024
Objection raised — Other
10/04/2024
Objection resolved — Addressed
Latest 60 of 223 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHudson Black07/07/2026
DOB NOWSupported ScaffoldSigned-offKNS Building Rest05/02/2025
DOB NOWGeneral ConstructionSigned-offRyder Construction09/09/2024
DOB NOWPlumbingSigned-offReliable Plumbing & Heating07/15/2024
DOB NOWConstruction FenceSigned-offRockledge Scaffold04/18/2024
DOB NOWGeneral ConstructionPermit IssuedRyder Construction04/03/2024
DOB NOWGeneral ConstructionPermit IssuedRyder Construction03/28/2024
DOB NOWGeneral ConstructionPermit IssuedRyder Construction03/06/2024
DOB NOWMechanical SystemsSigned-offRyder Construction03/05/2024
DOB NOWSupported ScaffoldSigned-offRockledge Scaffold01/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold12/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold10/10/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold09/14/2023
DOB NOWStandpipeSigned-offFive Borough NYC09/04/2023
DOB NOWSprinklersSigned-offFive Borough NYC09/04/2023
DOB NOWPlumbingSigned-offReliable Plumbing & Heating08/14/2023
DOB NOWConstruction FenceSigned-offRockledge Scaffold04/18/2023
DOB NOWCurb CutSigned-offRyder Construction03/28/2023
DOB NOWMechanical SystemsSigned-offRyder Construction03/14/2023
DOB NOWGeneral ConstructionPermit IssuedRyder Construction03/14/2023
DOB NOWSupported ScaffoldSigned-offRockledge Scaffold02/01/2023
DOB NOWGeneral ConstructionPermit IssuedRyder Construction12/09/2022
DOB NOWMechanical SystemsSigned-offRyder Construction12/08/2022
DOB NOWSupport of ExcavationSigned-offRyder Construction12/08/2022
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold11/17/2022
DOB NOWGeneral ConstructionPermit IssuedRyder Construction11/03/2022
DOB NOWMechanical SystemsSigned-offRyder Construction10/28/2022
DOB NOWStandpipeSigned-offFive Borough NYC10/28/2022
DOB NOWStructuralSigned-offRyder Construction10/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold10/11/2022
DOB NOWSprinklersSigned-offFive Borough NYC09/23/2022
DOB NOWStandpipeSigned-offFive Borough NYC09/23/2022
DOB NOWSidewalk ShedSigned-offRockledge Scaffold09/16/2022
DOB NOWFoundationSigned-offRyder Construction09/16/2022
DOB NOWPlumbingSigned-offReliable Plumbing & Heating09/13/2022
DOB NOWSupport of ExcavationSigned-offRyder Construction04/22/2022
DOB NOWEarth WorkSigned-offRyder Construction04/22/2022
DOB NOWConstruction FenceSigned-offRockledge Scaffold04/20/2022
DOB NOWConstruction FenceSigned-offAlba Services09/15/2021
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding02/12/2021
+ 1 more permits on file
1 project · most recent 10/02/2025
Sprinkler System
FiledStatusContractorScope
10/02/2025Signed-offFive Borough NYCSprinkler System
1 project · most recent 10/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/02/2025Signed-offReliable Plumbing & HeatingGas, Storm, Water/Sanitary
7 projects · most recent 01/10/2024
General Wiring
FiledStatusContractorScope
01/10/2024CompleteRoz-A-Lite Electrical Contg IGeneral Wiring
01/10/2023CompleteRoz-A-Lite Electrical Contg I—
11/03/2022CompleteStar Electrical Contractors—
08/01/2022CompleteRoz-A-Lite Electrical Contg IGeneral Wiring
07/15/2022CompleteAnthony G Ferry—
09/23/2021CompleteV. Vass Electric—
02/16/2021CompleteV. Vass Electric—
1 project · most recent 10/02/2025
FiledStatusContractorScope
10/02/2025Signed-offReliable Plumbing & Heating2 scope_items
1 project · most recent 10/02/2025
Earthwork
FiledStatusContractorScope
10/02/2025Signed-offReliable Plumbing & HeatingEarthwork
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
04/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/31/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/24/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/24/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/19/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/16/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
01/16/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
10/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/16/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/17/2026Tenant Protection Plan ComplianceERIC BERLENTspecial
06/17/2026Fire-Resistance Rated ConstructionERIC BERLENTprogress
06/17/2026FinalERIC BERLENTprogress
10/30/2025Fenestration air leakageChristopher O'Malleyenergy_progress
10/30/2025Fenestration and door U-factor and product ratingsChristopher O'Malleyenergy_progress
10/30/2025VestibulesChristopher O'Malleyenergy_progress
10/30/2025Protection of exposed foundation insulationChristopher O'Malleyenergy_progress
10/30/2025Maintenance informationChristopher O'Malleyenergy_progress
10/30/2025Energy Code Compliance InspectionsChristopher O'Malleyprogress
10/30/2025Fenestration areasChristopher O'Malleyenergy_progress
10/30/2025Fire-Resistance Rated ConstructionChristopher O'Malleyprogress
10/30/2025Lowest Floor ElevationChristopher O'Malleyprogress
10/30/2025Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
10/30/2025Subsurface Investigations (Borings/Test Pits)GARY MARCUSspecial
10/30/2025Wall Panels, Curtain Walls, and VeneersChristopher O'Malleyspecial
10/30/2025Exterior Insulation and Finish Systems (EIFS)Christopher O'Malleyspecial
10/30/2025Mastic and Intumescent Fire-resistant CoatingsChristopher O'Malleyspecial
10/30/2025PreliminaryChristopher O'Malleyprogress
10/30/2025Insulation placement and R valuesChristopher O'Malleyenergy_progress
10/30/2025Air barrier continuity plan testingChristopher O'Malleyenergy_progress
01/21/2025Fenestration air leakageChristopher O'Malleyenergy_progress
01/21/2025Air barrier continuity plan testingChristopher O'Malleyenergy_progress
01/21/2025VestibulesChristopher O'Malleyenergy_progress
01/21/2025Insulation placement and R valuesChristopher O'Malleyenergy_progress
01/21/2025Protection of exposed foundation insulationChristopher O'Malleyenergy_progress
Latest 25 of 150.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch42
09/03/2026M00542157-I1Request digital key ↗
09/02/2026M00714099-I1Request digital key ↗
09/01/2026M00775784-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00468872-I1Request digital key ↗
08/15/2026M00468872-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00468872-P1Request digital key ↗
09/04/2026M00468872-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram8
08/13/2026M00503537-A5Open ↗
08/13/2026M00503537-A7Open ↗
08/13/2026M00503537-A3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/13/2026M00503537-A3Open ↗
08/13/2026M00503537-A7Open ↗
08/13/2026M00503537-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications122
▸DOB NOWSpecial Inspector Seal & Signature54
10/03/2026M00503537-I1Open ↗
10/03/2026M00503537-I1Open ↗
10/03/2026M00503537-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/03/2026M00542157-I1Open ↗
09/02/2026M00714099-I1Open ↗
08/29/2026M00775763-P2Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/03/2026M00503537-I1Open ↗
10/03/2026M00503537-I1Open ↗
09/19/2026M00503537-S2Open ↗
Showing 3 of 24 on file for this type
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/13/2026M00503537-A5Open ↗
08/13/2026M00503537-P8Open ↗
08/13/2026M00503537-A9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/28/2026M00503537-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist8
08/28/2026M00503537-P7Open ↗
08/28/2026M00503537-I1Open ↗
08/28/2026M00503537-A9Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00503537-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00503537-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/28/2026M00503537-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026M00503537-S6Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents16
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)3
08/13/2026M00503537-I1Open ↗
08/13/2026M00503537-S4Open ↗
08/13/2026M00503537-S5Open ↗
▸DOB NOWLowest Floor Elevation Plan2
08/15/2026M00503537-S6Open ↗
08/14/2026M00503537-S3Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00503537-S6Open ↗
08/13/2026M00503537-S3Open ↗
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type