← Back
STATEN ISLAND
428GAR HOLTEN AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175273
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
ArchitectureStructural
Floor 14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
355 ARDEN603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC310/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. SMITH CONSTRUCTION INC.General Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738310/23/2025
Building Lifecycle
All (38)Filed (3)Permit Issued (2)Inspection (3)Special Inspection (30)
10/28/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/28/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/28/2025
Special inspection requirement — Footing and Foundation
anthony santoro
10/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
10/28/2025
Special inspection requirement — Lowest Floor Elevation
anthony santoro
10/28/2025
Special inspection requirement — Final
anthony santoro
10/28/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
10/28/2025
Special inspection requirement — Interior lighting power
anthony santoro
10/28/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
10/23/2025
Filed — New Building
CONSTRUCT DETACHED TWO CAR GARAGE FOR NEW DWELLING UNIT
S00708329-P2
10/22/2025
Special inspection requirement — Interior lighting power
anthony santoro
10/22/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/22/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
10/22/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/22/2025
Special inspection requirement — Final
anthony santoro
10/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
10/22/2025
Special inspection requirement — Footing and Foundation
anthony santoro
10/22/2025
Special inspection requirement — Lowest Floor Elevation
anthony santoro
10/22/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
10/22/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
05/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/31/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2023
Permit issued — General Construction
S00708329-I1-GC-CX
01/24/2023
Filed — New Building
CONSTRUCT DETACHED TWO CAR GARAGE FOR NEW DWELLING UNIT
S00708329-P1
01/09/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/09/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
01/09/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
01/09/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
01/09/2023
Special inspection requirement — Final
anthony santoro
05/02/2022
Permit issued — Structural
S00708329-I1-GC-CX
04/01/2022
Filed — New Building
CONSTRUCT DETACHED TWO CAR GARAGE FOR NEW DWELLING UNIT
S00708329-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ. SMITH CONSTRUCTION INC03/09/2023
DOB NOWStructuralPermit IssuedJ. SMITH CONSTRUCTION INC05/02/2022
1 project · most recent 05/09/2023
General Wiring
FiledStatusContractorScope
05/09/2023CompleteRIDGE ELECTRIC CORP.General Wiring
1 project · most recent 10/23/2025
Wood
FiledStatusContractorScope
10/23/2025Permit IssuedJ. SMITH CONSTRUCTION INCWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/31/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/28/2025Subgrade Inspectionsanthony santorospecial
10/28/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
10/28/2025Concrete - Cast-In-Placeanthony santorospecial
10/28/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
10/28/2025Energy Code Compliance Inspectionsanthony santoroprogress
10/28/2025Footing and Foundationanthony santoroprogress
10/28/2025Fire-Resistance Rated Constructionanthony santoroprogress
10/28/2025Lowest Floor Elevationanthony santoroprogress
10/28/2025Finalanthony santoroprogress
10/28/2025Structural Wood Frameanthony santoroprogress
10/28/2025Interior lighting poweranthony santoroenergy_progress
10/28/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
10/22/2025Interior lighting poweranthony santoroenergy_progress
10/22/2025Concrete - Cast-In-Placeanthony santorospecial
10/22/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
10/22/2025Subgrade Inspectionsanthony santorospecial
10/22/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
10/22/2025Energy Code Compliance Inspectionsanthony santoroprogress
10/22/2025Finalanthony santoroprogress
10/22/2025Fire-Resistance Rated Constructionanthony santoroprogress
10/22/2025Footing and Foundationanthony santoroprogress
10/22/2025Lowest Floor Elevationanthony santoroprogress
10/22/2025Structural Wood Frameanthony santoroprogress
10/22/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
01/09/2023Concrete - Cast-In-Placeanthony santorospecial
Latest 25 of 36.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026S00708329-P1Request digital key ↗
08/18/2026S00708329-I1Request digital key ↗
08/18/2026S00708329-P2Request digital key ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-I1Open ↗
08/13/2026S00708329-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00708329-I1Open ↗
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00708329-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026S00708329-I1Open ↗
08/29/2026S00708329-I1Open ↗
08/29/2026S00708329-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026S00708329-I1Open ↗
08/29/2026S00708329-I1Open ↗
08/28/2026S00708329-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026S00708329-I1Open ↗
08/18/2026S00708329-P2Open ↗
08/18/2026S00708329-P1Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00708329-I1Open ↗
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-P2Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026S00708329-P2Open ↗
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00708329-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-I1Open ↗
08/13/2026S00708329-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00708329-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00708329-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-I1Open ↗
08/13/2026S00708329-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026S00708329-I1Open ↗
08/18/2026S00708329-P2Open ↗
08/18/2026S00708329-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00708329-P1Open ↗
08/13/2026S00708329-P2Open ↗
08/13/2026S00708329-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00708329-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S00708329-I1Open ↗