← Back
Elevator cooperative
429 CLINTON AVENUE
BROOKLYN · Clinton Hill · BIN 3055988
💬 Discuss this project
1916Year Built
6Stories
D4Building Class
R6BZoning
25,701 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 429 CLINTON AVE COOP INC · 9,104 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 516p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 13p · 2 filings · 17 docs
Site & exterior1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
429 CLINTON AVENUE2303/21/2026
STEEL SYSTEMS403/21/2026
C O ADVANCED MANAGEMENT203/21/2026
429 CLINTON AVE COOP INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAJ ENGINEERING PLLC111/22/2024
SAL ARCHITECTS309/13/2022
ERIC RICHEY ARCHITECT, PLLC408/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER403/21/2026
CODE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P.S.I. MECHANICALPlumbing207/08/2026
EURO TECH P&H CONTRACTINGGeneral Contractor207/08/2026
VOSILLA, ALBERTOElectrical103/21/2026
WTG ELECTRIC INC.Electrical103/22/2026
KELLY INTERIORS LLCGeneral Contractor107/08/2026
PRINCE CONTRACTING & DEVEGeneral Contractor104/09/2026
DOOKER, KENYElectrical103/21/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
RYAN, ROBERTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930111/22/2024
VINCENT J. LIOTTA P. E.1974105/20/2022
ERIC RICHEY ARCHITECT, PL5444208/27/2021
Building Lifecycle
All (105)Filed (8)Permit Issued (7)Signed Off (5)Facade (FISP) (12)Violation (37)Inspection (3)Objection (20)Special Inspection (13)
10/27/2025
Signed off — Alteration
Facade Repairs
B01133709-I1
06/09/2025
Violation issued (HPD, closed)
A
11/26/2024
Permit issued — Structural
B01133709-I1-GC-CX
11/22/2024
Filed — Alteration
Facade Repairs
B01133709-I1
11/22/2024
Special inspection requirement — Masonry
Joseph Jabour
11/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Jabour
11/14/2024
Cycle 9 facade report signed — SWARMP
11/13/2024
Cycle 9 facade inspection completed
10/28/2024
Special inspection requirement — Final
Joseph Jabour
10/11/2024
Cycle 9 facade report submitted
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2023
Violation issued (HPD, closed)
I
04/12/2023
Signed off — Alteration
Renovation of existing apartment #10 on floor 001. Architectural work. There is to be no change of use, occupancy, or egress.
B00722234-I1
04/03/2023
Signed off — Alteration
Installation and modification of plumbing fixtures at existing apartment #10 on floor 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00722236-I1
03/22/2023
Violation issued (HPD, closed)
A
11/29/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2022
Violation issued (HPD, closed)
I
10/04/2022
Objection resolved — Addressed
09/14/2022
Objection raised — Admin
09/13/2022
Filed — Alteration
Installation and modification of plumbing fixtures at existing apartment #10 on floor 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00722236-P1
08/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2022
Permit issued — Plumbing
B00722236-I1-PL
07/07/2022
Permit issued — General Construction
B00722234-I1-GC
06/16/2022
Objection resolved — Addressed
06/16/2022
Objection resolved — Addressed
06/16/2022
Objection resolved — Addressed
06/15/2022
Objection raised — Other
06/15/2022
Objection raised — Admin
06/15/2022
Objection raised — Energy
06/10/2022
Objection resolved — Addressed
05/27/2022
Objection raised — Scope
05/20/2022
Filed — Alteration
Renovation of existing apartment #10 on floor 001. Architectural work. There is to be no change of use, occupancy, or egress.
B00722234-I1
05/20/2022
Filed — Alteration
Installation and modification of plumbing fixtures at existing apartment #10 on floor 001. Plumbing work. There is to be no change of use, occupancy, or egress.
B00722236-I1
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Liotta
04/20/2022
Special inspection requirement — Final
SANDRA ARANGUREN-LANGSTON
11/30/2021
Signed off — Alteration
PLUMBING WORKTYPE BEING FILED IN CONJUNCTION GENERAL CONSTRUCTION. KITCHEN AND BATHROOM RENOVATION.
B00463951-I1
11/30/2021
Signed off — Alteration
PLUMBING WORKTYPE BEING FILED IN CONJUNCTION GENERAL CONSTRUCTION. KITCHEN AND BATHROOM RENOVATION.
B00463951-S1
08/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC RICHEY
08/30/2021
Special inspection requirement — Energy Code Compliance
ERIC RICHEY
08/30/2021
Special inspection requirement — Final
ERIC RICHEY
08/30/2021
Special inspection requirement — Lighting in dwelling units
ERIC RICHEY
08/27/2021
Filed — Alteration
PLUMBING WORKTYPE BEING FILED IN CONJUNCTION GENERAL CONSTRUCTION. KITCHEN AND BATHROOM RENOVATION.
B00463951-P2
08/27/2021
Filed — Alteration
PLUMBING WORKTYPE BEING FILED IN CONJUNCTION GENERAL CONSTRUCTION. KITCHEN AND BATHROOM RENOVATION.
B00463951-P1
08/26/2021
Special inspection requirement — Lighting in dwelling units
ERIC RICHEY
08/26/2021
Special inspection requirement — Final
ERIC RICHEY
08/26/2021
Special inspection requirement — Energy Code Compliance
ERIC RICHEY
08/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC RICHEY
08/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2021
Permit issued — Plumbing
B00463951-S1-PL
04/13/2021
Violation issued (ECB, closed)
Construction
03/12/2021
Permit issued — General Construction
B00463951-I1-GC
03/05/2021
Permit issued — Plumbing
B00463951-S1-PL
02/26/2021
Permit issued — General Construction
B00463951-I1-GC
02/16/2021
Objection raised — Structural
02/16/2021
Objection resolved — Addressed
02/12/2021
Objection raised — Structural
02/12/2021
Objection resolved — Addressed
02/12/2021
Objection raised — Structural
02/12/2021
Objection resolved — Addressed
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPRINCE CONTRACTING & DEVE11/26/2024
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP07/16/2022
DOB NOWGeneral ConstructionSigned-offKELLY INTERIORS LLC07/07/2022
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL05/21/2021
DOB NOWGeneral ConstructionSigned-offEURO TECH P&H CONTRACTING03/12/2021
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL03/05/2021
DOB NOWGeneral ConstructionSigned-offEURO TECH P&H CONTRACTING02/26/2021
BISOTISSUEDNEW WAVE DESIGN & CONTRACTING11/16/2017
BISOTISSUEDPRESERV BLD RESTOR MGT IN11/14/2016
BISEQISSUEDSTEEL SYSTEMS LLC10/26/2016
BISEQISSUEDSTEEL SYSTEMS LLC10/25/2016
BISPLISSUEDMARCO POLO PLBG & HTG INC06/16/2015
BISOTISSUEDPINE BUILDERS CORP05/19/2015
BISBLISSUEDS.J. FUEL CO., INC07/21/2011
BISOTISSUEDCOMMERCIAL BUILDING AND R05/26/2011
BISOTISSUEDDENI HOME IMPROVEMENT CO12/23/2010
BISEQISSUEDEVEREST SCAFFOLDING INC02/11/2008
BISEQISSUEDEVEREST SCAFFOLDING INC01/14/2008
BISEQISSUEDEVEREST SCAFFOLDING INC12/10/2007
BISPLISSUEDGO GREENER PLUMBING LLC02/08/2005
BISOTISSUEDEQUILIBRIO11/16/2004
BISOTISSUEDOFFICE OF CONSTRUCTION SERVICES01/13/2003
BISPLISSUEDACE CONTRACTING CORP07/09/1991
BISOTISSUEDCRAIG HOFHEIMER INC06/20/1991
4 projects · most recent 07/11/2022
General Wiring
FiledStatusContractorScope
07/11/2022CompleteSEABRAVE ELECTRIC CORPGeneral Wiring
04/17/2021CompleteWTG ELECTRIC INC.General Wiring
03/04/2021CompleteWTG ELECTRIC INC.General Wiring
11/30/2018CompleteBNH ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/22/2024MasonryJoseph Jabourspecial
11/22/2024Tenant Protection Plan ComplianceJoseph Jabourspecial
10/28/2024FinalJoseph Jabourprogress
05/12/2022Fire-Resistant Penetrations and JointsVincent Liottaspecial
04/20/2022FinalSANDRA ARANGUREN-LANGSTONprogress
08/30/2021Fire-Resistant Penetrations and JointsERIC RICHEYspecial
08/30/2021Energy Code ComplianceERIC RICHEYprogress
08/30/2021FinalERIC RICHEYprogress
08/30/2021Lighting in dwelling unitsERIC RICHEYenergy_progress
08/26/2021Lighting in dwelling unitsERIC RICHEYenergy_progress
08/26/2021FinalERIC RICHEYprogress
08/26/2021Energy Code ComplianceERIC RICHEYprogress
08/26/2021Fire-Resistant Penetrations and JointsERIC RICHEYspecial
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
09/01/2026B00463951-P2Request digital key ↗
09/01/2026B00463951-S1Request digital key ↗
08/29/2026B00722236-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00463951-S1Request digital key ↗
08/15/2026B00463951-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00463951-P1Request digital key ↗
08/14/2026B00463951-I1Request digital key ↗
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION16
07/05/2019340685574Open ↗
06/28/2019340685574Open ↗
11/16/2017340542489Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/25/2016321465213Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit8
08/29/2026B00722236-I1Open ↗
08/13/2026B00722236-P1Open ↗
08/13/2026B00722234-I1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications57
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/21/2020340685574Open ↗
07/12/2018340542489Open ↗
05/31/2018340542489Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00463951-P1Open ↗
09/01/2026B00463951-I1Open ↗
09/01/2026B00463951-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
10/02/2026B00722234-I1Open ↗
09/01/2026B01133709-I1Open ↗
08/23/2026B00463951-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/24/2016340436219Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/24/2016340436219Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/24/2016340436219Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/02/2026B00722234-I1Open ↗
09/01/2026B01133709-I1Open ↗
09/01/2026B01133709-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/01/2011320272726Open ↗
11/29/2010320244829Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/01/2011320272726Open ↗
11/29/2010320244829Open ↗
▸BISPC FULL REPORT2
12/05/2007310063533Open ↗
12/05/2007310063463Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
02/03/2012320272726Open ↗
02/03/2012320272726Open ↗
02/03/2012320272726Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING2
05/13/2015340258688Open ↗
03/01/2011320272726Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES5
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/24/2016340436219Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/24/2016340436219Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00722236-I1Open ↗
08/13/2026B01133709-I1Open ↗
08/13/2026B00722236-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/05/2007310063533Open ↗
12/05/2007310063463Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/01/2011320272726Open ↗
11/29/2010320244829Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00463951-S1Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
03/21/2020340685574Open ↗
07/12/2018340542489Open ↗
05/31/2018340542489Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/21/2020340685574Open ↗
07/12/2018340542489Open ↗
04/17/2018321465213Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/28/2019340685574Open ↗
06/16/2015340258688Open ↗
05/13/2015340258688Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
05/13/2015340258688Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00463951-S1Open ↗
08/13/2026B00463951-I1Open ↗
▸BISNYCECC ANALYSIS1
05/13/2015340258688Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/01/2011320272726Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/21/2016340435595Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
06/28/2019340685574Open ↗
10/24/2016340436219Open ↗
10/24/2016340436219Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/21/2020340685574Open ↗
07/12/2018340542489Open ↗
05/31/2018340542489Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL9
06/28/2019340685574Open ↗
07/12/2018340542489Open ↗
09/11/2017340542489Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/01/2011320272726Open ↗
11/29/2010320244829Open ↗
12/05/2007310063533Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/17/2018321465213Open ↗
03/05/2018321465213Open ↗
12/18/2012320272726Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
03/21/2020340685574Open ↗
06/28/2019340685574Open ↗
05/31/2018340542489Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms16
▸BISBOROUGH INTAKE FORM5
03/21/2020340685574Open ↗
07/12/2018340542489Open ↗
05/31/2018340542489Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
06/28/2019340685574Open ↗
09/11/2017340542489Open ↗
10/24/2016340436219Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
10/20/2016321465213Open ↗
12/10/2011320244829Open ↗
08/08/2011320272726Open ↗
▸BISEFILING COVER SHEET3
10/17/2016321465213Open ↗
03/01/2011320272726Open ↗
11/29/2010320244829Open ↗
▸Other Documents4
▸DOB NOWProof of Historic Building3
08/29/2026B00722236-I1Open ↗
08/13/2026B00722234-I1Open ↗
08/13/2026B00722236-P1Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
05/13/2015340258688Open ↗