← Back
General warehouse
429 FAILE STREET
BRONX · BIN 2006897
💬 Discuss this project
1960Year Built
1Stories
E1Building Class
M3-1Zoning
5,000 sfGross Floor Area
1Units
General warehouse · Owner of record: 421, 429 FAILE STREET HOLDINGS LLC · 5,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Mechanical
Roof4p · 1 filing · 11 docs
Floor 11p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
421-429 FAILE ST607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LCW ENGINEERING, P.C.206/28/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A. MECHANICAL SOL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW ENGINEERING, PC1103206/28/2021
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (4)
07/12/2021
Signed off — Alteration
Install pre-fabricated walk in freezer & cooler on the 1st floor with condensing units on the roof on exist. steel dunnage.
X00468198-I1
06/30/2021
Special inspection requirement — Mechanical Systems
luis wong
06/30/2021
Special inspection requirement — Energy Code Compliance Inspections
luis wong
06/30/2021
Special inspection requirement — Final
luis wong
06/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
06/28/2021
Filed — Alteration
Install pre-fabricated walk in freezer & cooler on the 1st floor with condensing units on the roof on exist. steel dunnage.
X00468198-P1
02/25/2021
Permit issued — Mechanical Systems
X00468198-I1-MS
02/24/2021
Filed — Alteration
Install pre-fabricated walk in freezer & cooler on the 1st floor with condensing units on the roof on exist. steel dunnage.
X00468198-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA.A. MECHANICAL SOL INC02/25/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/30/2021Mechanical Systemsluis wongspecial
06/30/2021Energy Code Compliance Inspectionsluis wongprogress
06/30/2021Finalluis wongprogress
06/30/2021HVAC-R and service water heating equipmentluis wongenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00468198-I1Request digital key ↗
08/15/2026X00468198-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026X00468198-I1Open ↗
08/27/2026X00468198-I1Open ↗
08/27/2026X00468198-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00468198-I1Open ↗
08/13/2026X00468198-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026X00468198-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00468198-I1Open ↗
08/13/2026X00468198-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00468198-I1Open ↗