← Back
BuildNYC
Over six families without stores
429 PENNSYLVANIA AVENUE
BROOKLYN · BIN 3084448
💬 Discuss this project
1901Year Built
4Stories
C1Building Class
R6Zoning
—Gross Floor Area
8Units
23 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 429 Penn OZ Fund · 2.07 FAR built · Flood zone X
Locations of Work
StructuralElectricalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprinkler system installation2p · 1 filing · 14 docs
Floor 4Sprinkler system installation3p · 1 filing · 14 docs
Floor 3Sprinkler system installation3p · 1 filing · 14 docs
Floor 2Sprinkler system installation2p · 1 filing · 14 docs
Floor 1Sprinkler system installation7p · 2 filings · 17 docs
Site & exteriorSprinkler system installation5p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bluestone Equity Group604/09/2026
429 Pennsylvania303/21/2026
429 Penn OZ Fund203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bricolage Designs204/06/2021
Enthink Engineers103/17/2020
KZ Engineering102/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bricolage Designs203/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&J PLG & Heating Co of NYPlumbing403/22/2026
Village P & H NYspecialty_contractor407/08/2026
M.N.C. General ContractorsScaffold203/21/2026
J & G Construction ServicesScaffold104/09/2026
M.N.C. General ContractorsGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-Tech Engineering6659204/06/2021
O'Rourke Engineering5873204/06/2021
Sia Inspections7306204/06/2021
Building Lifecycle
08/16/2026
§ 27-2033 ADM code provide ready access to buildings heating system door locked leading to cellar at boiler room
HPD violation · open
08/16/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2R , 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · open
03/18/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT…
HPD violation · open
02/25/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CILING, EAST AND WEST WALLS IN THE…
HPD violation · open
02/25/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CILING, EAST AND WEST WALLS IN THE…
HPD violation · closed
127 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offVillage P & H NY03/15/2021
DOB NOWSidewalk ShedSigned-offJ & G Construction Services03/17/2020
DOB NOWConstruction FenceSigned-offMNC General Contracting02/18/2020
BIS—ISSUEDM.N.C. General Contractors11/05/2021
BIS—ISSUEDM.N.C. General Contractors10/30/2020
BIS—ISSUEDM.N.C. General Contractors10/25/2020
BIS—ISSUEDM.N.C. General Contractors04/29/2020
BISPLISSUEDL&J PLG & Heating Co of NY02/27/2020
BISOTISSUEDM.N.C. General Contractors10/24/2019
BISOTISSUEDM.N.C. General Contractors09/27/2019
BIS—ISSUEDN/A05/01/1997
BIS—ISSUEDD/B/A L & S Construction04/01/1993
2 projects · most recent 11/23/2020
General Wiring
FiledStatusContractorScope
11/23/2020CompleteBrandl ElectricGeneral Wiring
03/20/2020CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/13/2021Sprinkler SystemsBRIAN O'ROURKEspecial
04/13/2021Post-installed AnchorsALBERTO ROMANspecial
04/13/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
04/13/2021Fire-Resistance Rated ConstructionJEFF AKERMANprogress
04/06/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
04/06/2021Post-installed AnchorsALBERTO ROMANspecial
04/06/2021Sprinkler SystemsBRIAN O'ROURKEspecial
04/06/2021Fire-Resistance Rated ConstructionJEFF AKERMANprogress
114 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account