← Back
Multi-story retail building (2+)
4290 3 AVENUE
BRONX · BIN 2011832
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
M1-4/R7AZoning
4,900 sfGross Floor Area
1Units
13 Open Violations 12 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: SCHNEIDMAN HOLDINGS COMPANY LLC · 2,761 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar6p · 1 filing · 15 docs
1 job · most recent 04/29/2025
Gas
FiledStatusContractorScope
04/29/2025Signed-offBARNETT PLBG & HTG CORPGas
Building Lifecycle
All (30)Filed (5)Permit Issued (2)Violation (17)Inspection (6)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/29/2025
Filed — Alteration
REGISTER EXISTING HOT WATER TANK, INSTALL NEW GAS LINE METER TO BOILER WITH CONJUNCTION JOB NUMBER BOILER #X00923278-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00952882-P3
04/08/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/14/2025
Filed — Alteration
REGISTER EXISTING HOT WATER TANK, INSTALL NEW GAS LINE METER TO BOILER WITH CONJUNCTION JOB NUMBER BOILER #X00923278-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00952882-P2
01/15/2025
Permit issued — Boiler Equipment
X00952882-S1-BE
11/11/2024
Filed — Alteration
REGISTER EXISTING HOT WATER TANK, INSTALL NEW GAS LINE METER TO BOILER WITH CONJUNCTION JOB NUMBER BOILER #X00923278-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00952882-P1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2024
Violation issued (ECB, open)
Boilers
07/18/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/21/2023
Permit issued — Plumbing
X00952882-I1-PL
10/30/2023
Filed — Alteration
REGISTER EXISTING HOT WATER TANK, INSTALL NEW GAS LINE METER TO BOILER WITH CONJUNCTION JOB NUMBER BOILER #X00923278-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00952882-I1
10/30/2023
Filed — Alteration
REGISTER EXISTING HOT WATER TANK, INSTALL NEW GAS LINE METER TO BOILER WITH CONJUNCTION JOB NUMBER BOILER #X00923278-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00952882-S1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/14/2008
Violation issued (ECB, closed)
Construction
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/23/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/23/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WPG1507/08/2026
SCHNEIDMAN HOLDINGS COMPA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC504/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC-HI-TECT ASSOCIATE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BARNETT PLBG & HTG CORPPlumbing207/08/2026
BARNETT LENWORTHGeneral Contractor103/21/2026
BARNETT PLBG HTGGeneral Contractor103/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offBARNETT PLBG & HTG CORP01/15/2025
DOB NOWPlumbingPermit IssuedBARNETT PLBG & HTG CORP11/21/2023
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/08/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026X00952882-P3Request digital key ↗
08/20/2026X00952882-P2Request digital key ↗
08/20/2026X00952882-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026X00952882-P3Open ↗
08/20/2026X00952882-P2Open ↗
08/20/2026X00952882-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026X00952882-P3Open ↗
08/20/2026X00952882-P2Open ↗
08/20/2026X00952882-P1Open ↗
Showing 3 of 5 on file for this type