← Back
BuildNYC
Elevator apt, semi-fireproof with stores
43-01 42ND STREET
QUEENS · Sunnyside · BIN 4001949
💬 Discuss this project
1928Year Built
6Stories
D7Building Class
R7AZoning
67,470 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized26 Active Violations 25 unresolved · 1 paperwork only 4 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: 4307 Sunnyside · 14,250 sf lot · 4.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 5E4p · 2 filings · 7 docs
Floor 4
Floor 3
Floor 2
Floor 1Aag Management, INC13p · 5 filings · 20 docs
CellarAag Management, INC5p · 1 filing · 6 docs
Site & exteriorAag Management, INC5p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4307 Sunnyside703/22/2026
Sunnyside Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rcga Architects409/16/2025
Defonseca Architects202/07/2025
MSM Engineering Services107/20/2022
Clip Architects111/08/2021
Alberto Roman106/17/2020
Alpha Home Design203/12/2020
Haider Engineering, P.E112/03/2019
Joel Phagoo P.E106/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rcga Architects803/21/2026
Modern Building Consultant203/21/2026
SNR Expediting Design203/21/2026
Indesign Studio403/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & Jas BuildersGeneral Contractor807/08/2026
S & J Construction ServiceScaffold707/08/2026
Dynamic InstallationScaffold407/08/2026
Hama Interior WorksGeneral Contractor407/08/2026
S&C Construction DesignsGeneral Contractor303/21/2026
Neptune Signs & AwningsSign hanger207/08/2026
Bargain PlumbingPlumbing107/08/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
Vertex ElectricElectrical103/22/2026
WCK ElectricElectrical103/22/2026
Global Luxury ServicesGeneral Contractor107/08/2026
Big City Electrical ContElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ashwani Khanna PE5256209/16/2025
Aditi Sarkar, Architect7569202/07/2025
Great Wall Consultant P.E5633207/20/2022
HRF Services5616103/03/2021
AR-Tech Engineering6659106/17/2020
Building Lifecycle
All (156)Filed (13)Permit Issued (16)Signed Off (3)Facade (FISP) (13)Violation (60)Inspection (6)Objection (18)Special Inspection (27)
05/06/2026
Violation issued (HPD, open)
A
12/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/04/2025
Violation issued (HPD, closed)
A
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
C
10/04/2025
Violation issued (HPD, closed)
A
09/23/2025
Violation issued (HPD, open)
C
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASHWANI KHANNA
09/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/16/2025
Filed — Alteration
Installation of electric water heater for the retail stores in the cellar. No change in the use, egress and occupancy
Q01137406-P1
07/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASHWANI KHANNA
02/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/22/2025
Objection raised — Scope
02/22/2025
Objection raised — Zoning
02/22/2025
Objection raised — Inspections
02/22/2025
Objection raised — Scope
02/07/2025
Filed — Alteration
lobby renovation
Q00581136-P1
02/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/16/2025
Permit issued — Plumbing
Q01137406-I1-PL
11/06/2024
Filed — Alteration
Installation of electric water heater for the retail stores in the cellar. No change in the use, egress and occupancy
Q01137406-I1
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
A
04/26/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00274333-I1
01/31/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2023
Permit issued — General Construction
Q00581136-I1-GC
11/26/2022
Violation issued (HPD, closed)
A
10/27/2022
Violation issued (ECB, closed)
Unknown
07/25/2022
Permit issued — Mechanical Systems
Q00641372-I1-MS
07/20/2022
Filed — Alteration
Install new HVAC system on the 1st floor retail store in conjunction with Alt-1 #421420705 and DOB Now Construction #Q00613648 as per plan. No change in use, egress, or occupancy.
Q00641372-I1
05/23/2022
Permit issued — General Construction
Q00581136-I1-GC
05/23/2022
Permit issued — General Construction
Q00581136-I1-GC
05/05/2022
Cycle 9 facade report signed — SWARMP
01/21/2022
Permit issued — General Construction
Q00581136-I1-GC
01/12/2022
Cycle 9 facade report submitted
01/06/2022
Cycle 9 facade inspection completed
12/28/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
12/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
12/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
12/28/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/03/2021
Violation issued (ECB, closed)
Local Law
12/02/2021
Special inspection requirement — Mechanical Systems
Xiong Wei Wu
12/02/2021
Special inspection requirement — Final
MOHAMED MAHMOUD
11/18/2021
Permit issued — General Construction
Q00613648-I1-GC
11/08/2021
Filed — Alteration
Proposed interior renovation at 1st floor retail store in conjunction with Alt-1 #421420705 as per plan. No change in use, egress, or occupancy under this application.
Q00613648-I1
10/27/2021
Special inspection requirement — Lighting controls
Jaeyoung Jang
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
10/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
10/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jaeyoung Jang
10/27/2021
Special inspection requirement — Interior lighting power
Jaeyoung Jang
10/22/2021
Permit issued — General Construction
Q00455603-I1-GC
09/08/2021
Objection raised — Fire_Protection
09/08/2021
Objection resolved — Addressed
09/08/2021
Objection raised — Fire_Protection
09/08/2021
Objection resolved — Addressed
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBargain Plumbing01/16/2025
DOB NOWGeneral ConstructionPermit IssuedS&C Construction Designs01/31/2023
DOB NOWMechanical SystemsSigned-offHama Interior Works07/25/2022
DOB NOWGeneral ConstructionPermit IssuedS & Jas Builder05/23/2022
DOB NOWGeneral ConstructionPermit IssuedS & Jas Builder05/23/2022
DOB NOWGeneral ConstructionPermit IssuedS & Jas Builder01/21/2022
DOB NOWGeneral ConstructionPermit IssuedHama Interior Works11/18/2021
DOB NOWGeneral ConstructionPermit IssuedS & Jas Builder10/22/2021
DOB NOWSidewalk ShedSigned-offS & J Construction Service03/03/2021
DOB NOWMechanical SystemsPermit IssuedGlobal Luxury Services06/19/2020
DOB NOWSignSigned-offNeptune Signs & Awnings03/17/2020
DOB NOWSidewalk ShedSigned-offS & J Construction Service02/10/2020
DOB NOWSignSigned-offNeptune Signs & Awnings01/29/2020
DOB NOWSidewalk ShedSigned-offS & J Construction Service12/03/2019
DOB NOWSidewalk ShedPermit IssuedDynamic Installation07/09/2018
DOB NOWSidewalk ShedPermit IssuedDynamic Installation06/22/2018
BISOTISSUEDS & Jas Builders10/07/2020
BISOTISSUEDS & Jas Builders10/01/2020
BISPLISSUEDAjit One Mechanical & General Contracting02/21/2020
BISEQISSUEDS & Jas Builders12/04/2019
BIS—ISSUEDS & Jas Builders12/04/2019
BISPLISSUEDAjit One Mechanical & General Contracting02/07/2019
BIS—ISSUEDVikram Construction01/23/2019
BISOTISSUEDSnee Contracting11/15/2018
BISOTISSUEDSnee Construction08/24/2018
BISEQISSUEDSnee Construction07/09/2018
BIS—ISSUEDSnee Construction07/09/2018
BIS—ISSUEDSnee Construction05/18/2018
BISEQISSUEDSnee Construction05/18/2018
BISOTISSUEDSnee Construction03/07/2018
BISPLISSUEDProcore Mechanical07/20/2017
BISOTISSUEDBuild Vision Design07/14/2017
BISOTISSUEDSnee Construction09/26/2016
BISPLISSUEDJohn's Plumbing & Heating09/13/2016
BISPLISSUEDJohn's Plumbing & Heating09/13/2016
BISOTISSUEDSnee Construction08/19/2016
BISOTISSUEDSnee Construction08/19/2016
BISPLISSUEDSai JI Plumbing03/29/2016
BISOTISSUEDSnee Construction03/25/2016
BISPLISSUEDSai JI Plumbing01/07/2016
+ 26 more permits on file
2 projects · most recent 07/20/2022
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2022Signed-offHama Interior WorksHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU18RLB 18,000 BTU · Condensing Unit ×2
ASU18RLB 18,000 BTU · Ahu ×2
Mitsubishi Electric MSZ-GL24NA 27,600 BTU · Ahu ×1
MUZ-GL24NA 27,600 BTU · Condensing Unit ×1
06/17/2020Permit IssuedGlobal Luxury ServicesVentilation Systems
Ventilation
Pen Vent FX 188 3,800 CFM · Exhaust Fan ×1
2 projects · most recent 09/16/2025
Water/Sanitary
FiledStatusContractorScope
09/16/2025Signed-offBargain PlumbingWater/Sanitary
03/03/2021——Water/Sanitary
9 projects · most recent 08/17/2022
General Wiring
FiledStatusContractorScope
08/17/2022CompleteVertex ElectricGeneral Wiring
06/29/2022CompleteBig City Electrical ContGeneral Wiring
05/18/2022CompleteVertex Electric6 meters, 6 new_meters
06/10/2020Permit IssuedAsko Electric Construction & Maintenance—
03/06/2020CompleteVertex ElectricGeneral Wiring
02/04/2020Permit IssuedAsko Electric Construction & Maintenance—
07/12/2019CompleteBig City Electrical ContGeneral Wiring
06/11/2018Permit IssuedWCK Electric—
06/11/2018Permit IssuedWCK Electric—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/04/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/31/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
09/22/2025Fire-Resistant Penetrations and JointsASHWANI KHANNAspecial
09/22/2025Tenant Protection Plan Compliance—special
07/30/2025Tenant Protection Plan Compliance—special
07/26/2025Fire-Resistant Penetrations and JointsASHWANI KHANNAspecial
12/28/2021Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
12/28/2021HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
12/28/2021Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
12/28/2021Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/02/2021Mechanical SystemsXiong Wei Wuspecial
12/02/2021FinalMOHAMED MAHMOUDprogress
10/27/2021Lighting controlsJaeyoung Jangenergy_progress
10/27/2021Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
10/27/2021Energy Code Compliance InspectionsJaeyoung Jangprogress
10/27/2021Fire-Resistance Rated ConstructionJaeyoung Jangprogress
10/27/2021Interior lighting powerJaeyoung Jangenergy_progress
08/23/2021Fenestration and door U-factor and product ratingsADITI SARKARenergy_progress
08/23/2021Fire-Resistant Penetrations and JointsADITI SARKARspecial
08/23/2021Interior lighting powerADITI SARKARenergy_progress
08/23/2021Exterior lighting powerADITI SARKARenergy_progress
02/28/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/17/2020Energy Code Compliance InspectionsALBERTO ROMANprogress
06/17/2020Duct leakage testing ALBERTO ROMANenergy_progress
06/17/2020Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
06/15/2020FinalALBERTO ROMANprogress
06/15/2020Mechanical SystemsALBERTO ROMANspecial
Latest 25 of 27.
▾Documents — 587 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch7
08/28/2026Q00054484-I1Request digital key ↗
08/27/2026Q00613648-I1Request digital key ↗
08/26/2026Q00641372-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00297683-I1Request digital key ↗
08/28/2026Q00329229-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00358240-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00274333-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00455660-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026Q00455603-I1Request digital key ↗
▸Applications & Permits128
▸BISWORK PERMIT APPLICATION70
11/12/2020420959163Open ↗
10/29/2020421639383Open ↗
12/13/2019421420705Open ↗
Showing 3 of 70 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION53
09/02/2021420959163Open ↗
11/12/2020421639383Open ↗
10/29/2020420959163Open ↗
Showing 3 of 53 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
07/20/2016421212128Open ↗
Showing 1 of 5 on file for this type
▸Seals & Professional Certifications131
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
10/04/2018421639383Open ↗
07/19/2018421639383Open ↗
06/05/2018421420705Open ↗
Showing 3 of 46 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
08/31/2016421363027Open ↗
08/30/2016421363018Open ↗
03/24/2016421252600Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026Q00641372-I1Open ↗
09/02/2026Q00641372-I1Open ↗
09/01/2026Q00613648-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00054484-I1Open ↗
08/28/2026Q00358240-I1Open ↗
08/27/2026Q00455660-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
08/31/2016421363027Open ↗
08/30/2016421363018Open ↗
03/24/2016421252600Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/08/2026Q01137406-P1Open ↗
09/02/2026Q00641372-I1Open ↗
09/02/2026Q00641372-I1Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment63
▸BISSELF-CERT PLUMBING NOTICE25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
03/07/2020421420705Open ↗
12/12/2019421420705Open ↗
12/10/2019421420705Open ↗
Showing 3 of 17 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection30
▸BISSTREET TREE CHECKLIST16
02/16/2017421420705Open ↗
03/24/2016421252600Open ↗
01/06/2016421046139Open ↗
Showing 3 of 16 on file for this type
▸BISTenant Protection Plan and Notes7
07/19/2018421639383Open ↗
06/05/2018421420705Open ↗
04/20/2017421424220Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026Q00358240-I1Open ↗
08/13/2026Q00274333-I1Open ↗
08/13/2026Q00329229-I1Open ↗
Showing 3 of 4 on file for this type
▸BISST-1 Street Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
07/19/2018421639383Open ↗
06/05/2018421420705Open ↗
04/20/2017421424220Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026Q00358240-I1Open ↗
08/27/2026Q00455660-I1Open ↗
08/15/2026Q00581136-P1Open ↗
Showing 3 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
07/19/2018421639383Open ↗
06/05/2018421420705Open ↗
06/05/2018421420705Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
12/26/2017421424220Open ↗
12/26/2017421046139Open ↗
11/14/2016440126016Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/12/2023420635708Open ↗
12/11/2023420959154Open ↗
12/11/2023420798355Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/21/2021420959163Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
10/04/2021420959163Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/01/2021420959163Open ↗
Showing 1 of 2 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
10/04/2021420959163Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/16/2017421420705Open ↗
▸Approvals, Objections & Sign-offs54
▸BISADMINISTRATIVE OBJECTIONS20
08/31/2016421363027Open ↗
08/30/2016421363018Open ↗
10/22/2015421212128Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
10/07/2021420959163Open ↗
12/26/2017421424220Open ↗
12/26/2017421046139Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
10/29/2020421639383Open ↗
11/30/2018421639383Open ↗
06/04/2018421420705Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER5
11/12/2020420959163Open ↗
12/13/2019421420705Open ↗
01/25/2019421420705Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/10/2019421420705Open ↗
06/04/2018421420705Open ↗
05/25/2018421420705Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT46
09/21/2021420959163Open ↗
07/19/2018421639383Open ↗
12/26/2017421424220Open ↗
Showing 3 of 46 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
12/11/2023421420705Open ↗
11/23/2023420635708Open ↗
11/23/2023420074939Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET22
07/19/2018421639383Open ↗
05/17/2018421420705Open ↗
04/20/2017421424220Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION14
09/02/2021420959163Open ↗
03/03/2020421420705Open ↗
12/20/2019421420705Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM4
10/29/2020421639383Open ↗
03/02/2018420959163Open ↗
12/26/2017421424220Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents3
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
02/16/2017421420705Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type