← Back
Factory, industrial, semi-fireproof
43-02 36 STREET
QUEENS · Sunnyside · BIN 4003164
💬 Discuss this project
1931Year Built
1Stories
F4Building Class
M1-4Zoning
10,000 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Factory, industrial, semi-fireproof · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL SYSTEMS407/08/2026
J&M STRONGWATER LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA ENGINEERING1002/06/2026
FL&M ENGINEERING DESIGN &INSPECTION108/08/2023
FSI ARCHITECTURE PC107/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST EXPEDITING1803/21/2026
EAST COAST EXPEDITING103/21/2026
GREEN STUDIO203/21/2026
Y A CONSULTING EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & M STRONGWATER LLCGeneral Contractor907/08/2026
DYKER SOLUTIONS INCGeneral Contractor107/08/2026
STEEL SYSTEMS LLCGeneral Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALPHA ENGINEERING LLC3448508/04/2025
Building Lifecycle
All (71)Filed (12)Permit Issued (9)Signed Off (6)Violation (12)Inspection (2)Special Inspection (30)
02/17/2026
Signed off — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-I1
02/12/2026
Signed off — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-S1
02/10/2026
Special inspection requirement — Insulation placement and R values
AHMED ISA
02/10/2026
Special inspection requirement — Final
AHMED ISA
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
AHMED ISA
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
AHMED ISA
02/10/2026
Special inspection requirement — Final
AHMED ISA
02/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AHMED ISA
02/10/2026
Special inspection requirement — Fenestration areas
AHMED ISA
02/10/2026
Special inspection requirement — Fenestration air leakage
AHMED ISA
02/06/2026
Filed — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-P2
02/06/2026
Filed — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-P1
01/29/2026
Special inspection requirement — Final
AHMED ISA
01/29/2026
Special inspection requirement — Fenestration air leakage
AHMED ISA
01/29/2026
Special inspection requirement — Fenestration areas
AHMED ISA
01/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AHMED ISA
01/29/2026
Special inspection requirement — Insulation placement and R values
AHMED ISA
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
AHMED ISA
01/29/2026
Special inspection requirement — Final
AHMED ISA
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
AHMED ISA
01/07/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PL WORK IN CONJUNCTION WITH WAREHOUSE RENOV AT GRD FL. INCLDS BATHROOM FIXTURE REPLACEMENT AND CAP/REMOVAL OF 2 TOILETS ON EXTG ROUGHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099967-S1
01/07/2026
Signed off — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-S2
01/07/2026
Signed off — Alteration
SUBSEQUENT FILING FOR PL WORK IN CONJUNCTION WITH WAREHOUSE RENOV AT GRD FL. INCLDS BATHROOM FIXTURE REPLACEMENT AND CAP/REMOVAL OF 2 TOILETS ON EXTG ROUGHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099967-I1
08/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2025
Filed — Alteration
SUBSEQUENT FILING FOR PL WORK IN CONJUNCTION WITH WAREHOUSE RENOV AT GRD FL. INCLDS BATHROOM FIXTURE REPLACEMENT AND CAP/REMOVAL OF 2 TOILETS ON EXTG ROUGHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099967-P2
08/04/2025
Filed — Alteration
SUBSEQUENT FILING FOR PL WORK IN CONJUNCTION WITH WAREHOUSE RENOV AT GRD FL. INCLDS BATHROOM FIXTURE REPLACEMENT AND CAP/REMOVAL OF 2 TOILETS ON EXTG ROUGHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099967-P1
08/04/2025
Special inspection requirement — Final
AHMED ISA
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AHMED ISA
08/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
AHMED ISA
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
AHMED ISA
08/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
AHMED ISA
08/04/2025
Special inspection requirement — Insulation placement and R values
AHMED ISA
08/04/2025
Special inspection requirement — Fenestration air leakage
AHMED ISA
08/04/2025
Special inspection requirement — Fenestration areas
AHMED ISA
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AHMED ISA
07/11/2025
Special inspection requirement — Fenestration air leakage
AHMED ISA
07/11/2025
Special inspection requirement — Insulation placement and R values
AHMED ISA
07/11/2025
Special inspection requirement — Fenestration areas
AHMED ISA
07/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
AHMED ISA
07/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
AHMED ISA
07/10/2025
Permit issued — Plumbing
Q01099967-S1-PL
05/06/2025
Violation issued (ECB, closed)
Construction
05/06/2025
Violation issued (ECB, closed)
Construction
05/06/2025
Violation issued (ECB, closed)
Construction
09/17/2024
Permit issued — General Construction
Q01099967-I1-GC
09/12/2024
Filed — Alteration
SUBSEQUENT FILING FOR PL WORK IN CONJUNCTION WITH WAREHOUSE RENOV AT GRD FL. INCLDS BATHROOM FIXTURE REPLACEMENT AND CAP/REMOVAL OF 2 TOILETS ON EXTG ROUGHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099967-S1
09/12/2024
Filed — Alteration
SUBSEQUENT FILING FOR PL WORK IN CONJUNCTION WITH WAREHOUSE RENOV AT GRD FL. INCLDS BATHROOM FIXTURE REPLACEMENT AND CAP/REMOVAL OF 2 TOILETS ON EXTG ROUGHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01099967-I1
08/22/2024
Permit issued — Structural
Q00975771-S2-ST
08/14/2024
Signed off — Alteration
STRUCTURAL SCOPE OF WORK CONSISTS OF PROVIDING BRACING TO STABILIZE EXISTING PIERS AND WALLS. REMOVING UNDERMINED PARAPET WALLS ON 43RD AVE. AND DEMOLISHING COMPROMISED ROOF JOISTS AND PLANKS. AS PER EMERGENCY WORK ORDER 071223FEM40201ZT.
Q00916273-I1
07/24/2024
Permit issued — Construction Fence
Q00905026-I1-FN
05/01/2024
Filed — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-S2
04/29/2024
Permit issued — General Construction
Q00975771-S1-GC
04/25/2024
Filed — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-S1
12/18/2023
Permit issued — General Construction
Q00975771-I1-GC
12/13/2023
Filed — Alteration
SUBSEQUENT PHASE 2 GC FILING FOR PARTIAL ROOF & PARAPET RECONSTRUCTION AS PER PLANS. INCLUDES NEW ROOFING AT SELECT ROOFING LOCATIONS. ASSOC STRUCTURAL WORK TO BE FILED UNDER SEPARATE SUBSEQUENT JOB FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00975771-I1
09/18/2023
Permit issued — Structural
Q00916273-I1-ST
08/10/2023
Filed — Alteration
STRUCTURAL SCOPE OF WORK CONSISTS OF PROVIDING BRACING TO STABILIZE EXISTING PIERS AND WALLS. REMOVING UNDERMINED PARAPET WALLS ON 43RD AVE. AND DEMOLISHING COMPROMISED ROOF JOISTS AND PLANKS. AS PER EMERGENCY WORK ORDER 071223FEM40201ZT.
Q00916273-I1
08/08/2023
Filed — Alteration
Q00913447-I1
08/08/2023
Permit issued — Sidewalk Shed
Q00913447-I1-SH
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/10/2025
DOB NOWGeneral ConstructionSigned-offJ M STRONGWATER09/17/2024
DOB NOWStructuralSigned-offJ M STRONGWATER08/22/2024
DOB NOWConstruction FencePermit IssuedJ M STRONGWATER07/24/2024
DOB NOWGeneral ConstructionSigned-offJ M STRONGWATER04/29/2024
DOB NOWGeneral ConstructionSigned-offJ M STRONGWATER12/18/2023
DOB NOWStructuralSigned-offDYKER SOLUTIONS09/18/2023
DOB NOWSidewalk ShedPermit IssuedSTEEL SYSTEMS LLC08/08/2023
DOB NOWConstruction FencePermit IssuedJ M STRONGWATER07/24/2023
BISOTISSUEDV.M. HOME IMPROVEMENT INC02/25/2011
BISEQISSUEDV.M. HOME IMPROVEMENT INC02/03/2011
BISEQISSUEDV.M. HOME IMPROVEMENT INC02/03/2011
2 projects · most recent 12/18/2024
General Wiring
FiledStatusContractorScope
12/18/2024CompleteELMAC ELECTRIC INC.General Wiring
07/21/2023Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 07/18/2023
Fence
FiledStatusContractorScope
07/18/2023Permit IssuedJ & M STRONGWATER LLCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/10/2026Insulation placement and R valuesAHMED ISAenergy_progress
02/10/2026FinalAHMED ISAprogress
02/10/2026Fire-Resistance Rated ConstructionAHMED ISAprogress
02/10/2026Energy Code Compliance InspectionsAHMED ISAprogress
02/10/2026FinalAHMED ISAprogress
02/10/2026Fenestration and door U-factor and product ratingsAHMED ISAenergy_progress
02/10/2026Fenestration areasAHMED ISAenergy_progress
02/10/2026Fenestration air leakageAHMED ISAenergy_progress
01/29/2026FinalAHMED ISAprogress
01/29/2026Fenestration air leakageAHMED ISAenergy_progress
01/29/2026Fenestration areasAHMED ISAenergy_progress
01/29/2026Fenestration and door U-factor and product ratingsAHMED ISAenergy_progress
01/29/2026Insulation placement and R valuesAHMED ISAenergy_progress
01/29/2026Fire-Resistance Rated ConstructionAHMED ISAprogress
01/29/2026FinalAHMED ISAprogress
01/29/2026Energy Code Compliance InspectionsAHMED ISAprogress
08/04/2025FinalAHMED ISAprogress
08/04/2025Fire-Resistant Penetrations and JointsAHMED ISAspecial
08/04/2025Fire-Resistance Rated ConstructionAHMED ISAprogress
08/04/2025Energy Code Compliance InspectionsAHMED ISAprogress
08/04/2025Fenestration and door U-factor and product ratingsAHMED ISAenergy_progress
08/04/2025Insulation placement and R valuesAHMED ISAenergy_progress
08/04/2025Fenestration air leakageAHMED ISAenergy_progress
08/04/2025Fenestration areasAHMED ISAenergy_progress
07/11/2025Fire-Resistant Penetrations and JointsAHMED ISAspecial
Latest 25 of 32.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026Q00905026-I1Request digital key ↗
08/24/2026Q00913447-I1Request digital key ↗
08/24/2026Q00916273-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
03/01/2011420297823Open ↗
02/03/2011420299901Open ↗
02/03/2011420297823Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
12/29/2010420299901Open ↗
12/29/2010420297823Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature30
10/01/2026Q00975771-I1Open ↗
09/01/2026Q00975771-P1Open ↗
08/29/2026Q01099967-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026Q00905026-I1Open ↗
08/24/2026Q00913447-I1Open ↗
08/22/2026Q00975771-P2Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/07/2011420299901Open ↗
11/07/2011420297823Open ↗
02/03/2011420299901Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01099967-I1Open ↗
08/24/2026Q01099967-P1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
12/29/2010420299901Open ↗
12/29/2010420297823Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026Q00975771-I1Open ↗
08/22/2026Q00975771-P1Open ↗
08/13/2026Q01099967-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/29/2010420297823Open ↗
12/29/2010420297823Open ↗
12/29/2010420297823Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/22/2026Q00975771-S2Open ↗
08/22/2026Q00975771-S1Open ↗
08/13/2026Q00916273-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/29/2010420299901Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/07/2011420299901Open ↗
11/07/2011420297823Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/29/2010420299901Open ↗
12/29/2010420297823Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/07/2011420297823Open ↗
12/29/2010420297823Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
12/29/2010420299901Open ↗
12/29/2010420297823Open ↗