Floor 68p · 4 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
HEREWITH FILE TO REHABILITATE EXISTING HALLWAY AND STAIRWAY (EXIT ACCESS). WORK INCLUDES REPLACE FLOOR COVERING WITH PORCELAIN TILE, PAINT THROUGH-OUT SPACE, AND MINOR REPAIR. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
6 documents · 4 drawing sheets
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #5C. WORK INCLUDES NEW/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PLUMBING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
8 documents · 1 drawing sheet
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #5O. WORK INCLUDES REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
19 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 56p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #5C. WORK INCLUDES NEW/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PLUMBING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
8 documents · 1 drawing sheet
HEREWITH FILE TO RENOVATE EXIST. APT UNIT #5G. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, NEW FLOORING, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
19 documents · 3 drawing sheets
HEREWITH FILE TO RENOVATE EXIST. UNIT #5G. WORK INCLUDES REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
4 documents · 1 drawing sheet
Floor 46p · 3 filings · 20 docs
ArchitectureDMPlumbing
HEREWITH FILE TO REHABILITATE EXISTING HALLWAY AND STAIRWAY (EXIT ACCESS). WORK INCLUDES REPLACE FLOOR COVERING WITH PORCELAIN TILE, PAINT THROUGH-OUT SPACE, AND MINOR REPAIR. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
6 documents · 4 drawing sheets
HEREWITH FILE TO COMBINE TWO APARTMENTS (#4D/#4E) INCLUDESNONLOAD BEARING PARTITION WALL, REMOVAL OF PLUMBING FIXTURES, UPGRADE KITCHEN CABINET, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
14 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 39p · 3 filings · 20 docs
ArchitectureDMElectricalPlumbing
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3O. WORK INCLUDES NEW/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PLUMBING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
26 documents · 2 drawing sheets
HEREWITH FILE TO RENOVATE EXIST. UNIT #3J. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, NEW FLOORING AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
19 documents · 5 drawing sheets
HEREWITH FILE TO RENOVATE EXIST. UNIT #3J. WORK INCLUDES NEW/REPLACE OF PLUMBING FIXTURES WITH FIRE-STOP PROVIDED, AND MINOR CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
8 documents · 2 drawing sheets
Floor 2Under Construction6p · 1 filing · 20 docs
ArchitectureDMGeneralPlumbing
Issued Permit Scope
General Construction
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #2K. WORK INCLUDES NEW/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PLUMBING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
25 documents · 3 drawing sheets
Floor 110p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
HEREWITH FILE TO REHABILITATE EXISTING HALLWAY AND STAIRWAY (EXIT ACCESS). WORK INCLUDES REPLACE FLOOR COVERING WITH PORCELAIN TILE, PAINT THROUGH-OUT SPACE, AND MINOR REPAIR. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
6 documents · 4 drawing sheets
application filled for miner interior renovation of existing commercial space as per drawings to add service counter at 1st floor and walk-in clod storage box at caller level
On file for this project
64 documents
HEREWITH FILE FOR TENANT FIT-OUT SPACE ALTERATION. WORK INCLUDES NEW ADA PLUMBING INSTALLATION WITH FIRE-STOPPING PROVIDED, AND MINOR CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
On file for this project
10 documents · 2 drawing sheets
Cellar4p · 1 filing · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
application filled for miner interior renovation of existing commercial space as per drawings to add service counter at 1st floor and walk-in clod storage box at caller level
On file for this project
64 documents