← Back
BuildNYC
Elevator apt, fireproof with stores
The Cove
43-12 HUNTER STREET · BIN 4620265
💬 Discuss this project
2018Year Built
18Stories
D6Building Class
M1-5/R7-3Zoning
113,555 sfGross Floor Area
124Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 43-12 Hunter · 10,221 sf lot · 11.11 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 101 filing · 6 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Westville Lic, Spear85p · 9 filings · 20 docs
CellarWestville Lic36p · 2 filings · 20 docs
Site & exteriorSpear1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rockrose Development6708/28/2026
43-12 Hunter503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A.B.A. Studio408/26/2026
TSF Engineering901/10/2025
SLCE Architects304/02/2024
Leon Skvirsky PE312/20/2023
Loring Consulting Engineers405/31/2023
Spivak Architects111/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants503/21/2026
Asa Barak Studio903/21/2026
KM Associates of New York203/21/2026
Building Brothers603/21/2026
A&A Construction Services203/21/2026
CCA Construction Consulting Associates103/21/2026
K & M Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDS Design and ConsultingGeneral Contractor903/21/2026
LW Interior RemodelingGeneral Contractor407/08/2026
Professional DoorGeneral Contractor303/21/2026
Active SignsSign hanger207/08/2026
Paul SignsSign hanger107/08/2026
Ariel ServicesPlumbing107/08/2026
Go Pro Fire ProtectionFire Protection107/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
P & D MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aba Architecture8907808/26/2026
TSF Engineering1274801/10/2025
Crosscheck Inspection Services544108/25/2023
Catalpa Special Inspectio2004211/01/2022
MEP Inspections1102110/26/2022
Building Lifecycle
All (149)Filed (24)Permit Issued (13)Signed Off (12)Violation (26)Inspection (12)Objection (32)Special Inspection (30)
08/26/2026
Filed — Alteration CO
FILING FOR CHANGE OF USE IN CELLAR (PARTIAL) FROM RETAIL TO ACCESSORY FOOD PREPARATION TO 001 FLOOR RESTAURANT AND001 FLOOR RETAIL (SPACE A) TO EATING & DRINKING ESTABLISHMENT. GC SCOPE OF WORK Cellar Demising Wall.TENANT FITOUT & EN FILED UNDER Q01030081
Q01041763-P2
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASA BARAK
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
ASA BARAK
04/13/2026
Violation issued (HPD, closed)
A
04/13/2026
Violation issued (HPD, closed)
A
06/17/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN (THE COVE)
Q00381924-I1
06/17/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN (THE COVE)
Q00381923-I1
03/05/2025
Filed — Alteration CO
FILING FOR CHANGE OF USE IN CELLAR (PARTIAL) FROM RETAIL TO ACCESSORY FOOD PREPARATION TO 001 FLOOR RESTAURANT AND001 FLOOR RETAIL (SPACE A) TO EATING & DRINKING ESTABLISHMENT. GC SCOPE OF WORK Cellar Demising Wall.TENANT FITOUT & EN FILED UNDER Q01030081
Q01041763-P1
03/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
ASA BARAK
03/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASA BARAK
03/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2025
Signed off — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-S5
01/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2025
Signed off — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-S6
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
01/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
ASA BARAK
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
01/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
01/10/2025
Filed — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-P5
01/10/2025
Permit issued — General Construction
Q01041763-I1-GC
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
01/10/2025
Special inspection requirement — Mechanical Systems
Nicholas Tucci
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
01/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
ASA BARAK
01/10/2025
Special inspection requirement — Maintenance information
Nicholas Tucci
01/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Nicholas Tucci
01/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
01/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
01/10/2025
Special inspection requirement — Shutoff dampers
Nicholas Tucci
01/10/2025
Special inspection requirement — Final
Nicholas Tucci
01/09/2025
Filed — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-P6
01/07/2025
Signed off — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-S7
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
01/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
01/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
01/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
01/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
01/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/03/2025
Signed off — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-I1
01/03/2025
Objection raised — Other
01/03/2025
Objection resolved — Addressed
12/23/2024
Objection resolved — Addressed
11/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/11/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2024
Filed — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-P3
10/25/2024
Filed — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-P4
10/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2024
Permit issued — Mechanical Systems
Q01030081-S6-MS
10/15/2024
Permit issued — Sprinklers
Q01030081-S7-EW-SP
10/11/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/09/2024
Permit issued — Plumbing
Q01030081-S5-PL
10/04/2024
Filed — Alteration
New and relocated sprinkler heads on cellar and ground floor.
Q01030081-P2
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCDS Design and Consulting01/10/2025
DOB NOWMechanical SystemsSigned-offCDS Design and Consulting10/16/2024
DOB NOWSprinklersSigned-offGo Pro Fire Protection10/15/2024
DOB NOWPlumbingSigned-offDG Mechanical Heating10/09/2024
DOB NOWGeneral ConstructionSigned-offCDS Design and Consulting08/14/2024
DOB NOWSignSigned-offPaul Signs12/26/2023
DOB NOWGeneral ConstructionSigned-offProfessional Door11/08/2023
DOB NOWSprinklersSigned-offP & D Mechanical11/15/2022
DOB NOWMechanical SystemsSigned-offLW Interior Remodeling11/15/2022
DOB NOWPlumbingSigned-offM&G Plumbing and Heating11/15/2022
DOB NOWGeneral ConstructionSigned-offLW Interior Remodeling11/14/2022
DOB NOWSignSigned-offActive Signs03/23/2021
DOB NOWSignSigned-offActive Signs03/22/2021
BISEQISSUEDSpring Scaffolding03/19/2021
BISOTISSUED43-12 Hunter GC03/11/2021
BIS—ISSUED43-12 Hunter GC10/01/2020
BISEQISSUED43-12 Hunter GC09/29/2020
BISPLISSUEDCopper Services07/08/2020
BISEQISSUEDSpring Scaffolding07/07/2020
BISEQISSUEDSpring Scaffolding06/23/2020
BIS—ISSUED43-12 Hunter GC05/29/2020
BISEQISSUEDSpring Scaffolding03/18/2020
BISSDISSUEDCopper Services12/19/2019
BISEQISSUED43-12 Hunter GC11/27/2019
BISEQISSUEDSpring Scaffolding06/21/2019
BIS—ISSUED43-12 Hunter GC06/14/2019
BISEQISSUEDWalsh Glass & Metal06/11/2019
BISEQISSUEDSpring Scaffolding05/10/2019
BISPLISSUEDCopper Services05/10/2019
BISEQISSUEDSpring Scaffolding03/20/2019
BISEQISSUEDWalsh Glass & Metal02/06/2019
BISSPISSUEDCopper Services12/18/2018
BISSDISSUEDCopper Services12/14/2018
BISEQISSUED43-12 Hunter GC12/13/2018
BISSDISSUEDCopper Services12/11/2018
BISEQISSUEDWalsh Glass & Metal11/26/2018
BISEQISSUEDSpring Scaffolding08/24/2018
BISEQISSUEDSpring Scaffolding06/26/2018
BIS—ISSUED43-12 Hunter GC06/21/2018
BISPLISSUEDCopper Services05/22/2018
+ 7 more permits on file
9 projects · most recent 05/20/2026
General Wiring Lighting
FiledStatusContractorScope
05/20/2026CompleteEmpire State Electl—
02/18/2025CompleteY.S. ElectricGeneral Wiring, Lighting
04/12/2024Permit IssuedPCS Electrical Services1 meters, 1 new_meters
02/21/2024CompletePCS Electrical Services1 meters, 1 new_meters
12/29/2023Permit IssuedEmpire State Electl—
12/15/2022CompleteElpo Electrical ContgGeneral Wiring
09/23/2022CompleteGRX Euro ElectricGeneral Wiring
01/18/2021Permit IssuedRainbow Electric Co—
01/18/2021Permit IssuedRainbow Electric Co—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2024Pass-Final PL - UndergroundPassView ↗
04/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
08/26/2026Tenant Protection Plan Compliance—special
08/11/2026Fire-Resistance Rated ConstructionASA BARAKprogress
08/11/2026Fire-Resistant Penetrations and JointsASA BARAKspecial
03/04/2025Tenant Protection Plan Compliance—special
03/04/2025Fire-Resistant Penetrations and JointsASA BARAKspecial
03/04/2025Fire-Resistance Rated ConstructionASA BARAKprogress
01/13/2025HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
01/13/2025Energy Code Compliance InspectionsNicholas Tucciprogress
01/13/2025Tenant Protection Plan ComplianceASA BARAKspecial
01/13/2025HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
01/13/2025HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
01/13/2025Fire-Resistant Penetrations and JointsNicholas Tuccispecial
01/10/2025Fire-Resistant Penetrations and JointsNicholas Tuccispecial
01/10/2025Mechanical SystemsNicholas Tuccispecial
01/10/2025Energy Code Compliance InspectionsNicholas Tucciprogress
01/10/2025FinalNicholas Tucciprogress
01/10/2025Shutoff dampersNicholas Tuccienergy_progress
01/10/2025HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
01/10/2025HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
01/10/2025HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
01/10/2025Duct leakage testing, insulation and designNicholas Tuccienergy_progress
01/10/2025Maintenance informationNicholas Tuccienergy_progress
01/10/2025Tenant Protection Plan ComplianceASA BARAKspecial
01/07/2025HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
01/07/2025Energy Code Compliance InspectionsNicholas Tucciprogress
Latest 25 of 71.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Westville LicRestaurant / Food ServiceCellar, Floor 1
Project Q01030081 Alteration · LOC Issued · 05/21/2024
Project Q01041763 Alteration CO · Permit Entire · 05/06/2024
SpearUnknownFloor 1
Project Q00972697 Alteration · LOC Issued · 12/20/2023
Project Q08015971 Alteration · LOC Issued · 11/01/2022
Project Q08015998 Alteration · LOC Issued · 11/01/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 386 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch20
08/25/2026Q08016039-I1Request digital key ↗
08/25/2026Q08016039-P1Request digital key ↗
08/25/2026Q08016019-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/27/2026Q00381924-I1Request digital key ↗
08/27/2026Q00381923-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/27/2026Q00516872-P2Request digital key ↗
08/15/2026Q00516872-I1Request digital key ↗
▸Applications & Permits56
▸BISPLAN / WORK APPROVAL APPLICATION31
09/19/2024420659530Open ↗
03/30/2023420659530Open ↗
10/06/2021420659530Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION22
03/11/2021440664489Open ↗
10/29/2020420659530Open ↗
06/01/2020420659530Open ↗
Showing 3 of 22 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
12/23/2019440403109Open ↗
09/18/2018440403109Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/12/2022440664489Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
04/02/2019440403109Open ↗
09/18/2018440403109Open ↗
Showing 2 of 3 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT IV: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature28
09/29/2026Q00919935-I1Open ↗
09/29/2026Q00919935-I1Open ↗
09/27/2026Q01030081-P6Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/27/2026Q00381923-I1Open ↗
08/27/2026Q00516872-I1Open ↗
08/27/2026Q00516872-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/29/2026Q00919935-I1Open ↗
09/27/2026Q01030081-P6Open ↗
09/23/2026Q01041763-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
03/07/2020420659530Open ↗
03/07/2020440434433Open ↗
03/07/2020440403216Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/29/2020440643056Open ↗
06/10/2019440551591Open ↗
02/05/2019440534290Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
10/29/2020440643056Open ↗
06/10/2019440551591Open ↗
02/05/2019440534290Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
10/29/2020440643056Open ↗
06/10/2019440551591Open ↗
02/05/2019440534290Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
02/09/2021440664489Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING6
05/07/2020440403216Open ↗
01/13/2020420659530Open ↗
11/30/2019440403216Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/20/2021420659530Open ↗
10/13/2021420659530Open ↗
▸BISEQUIPMENT USE PERMITS2
10/20/2021420659530Open ↗
10/20/2021420659530Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/27/2021420659530Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/27/2021420659530Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
12/20/2018421629811Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
12/20/2018421629811Open ↗
▸Safety & Tenant Protection16
▸BISSTREET TREE CHECKLIST4
09/18/2018440403109Open ↗
04/11/2018440403109Open ↗
Showing 2 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
08/22/2018440504107Open ↗
06/22/2018440489972Open ↗
05/12/2018440482185Open ↗
▸DOB NOWStreet Tree Checklist3
08/20/2026Q01041763-P1Open ↗
08/20/2026Q01041763-P2Open ↗
08/15/2026Q01041763-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
04/11/2018440403109Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026Q00381924-I1Open ↗
08/13/2026Q00381923-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/18/2018440403109Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q08016039-I1Open ↗
08/13/2026Q08016019-I1Open ↗
08/13/2026Q08015998-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
03/26/2021420659530Open ↗
03/15/2021420659530Open ↗
03/10/2021440664489Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY23
11/11/2021440470839Open ↗
03/26/2021420659530Open ↗
03/15/2021420659530Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
11/17/2021420659530Open ↗
10/28/2021420659530Open ↗
12/22/2017420659530Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
02/09/2018420659530Open ↗
02/09/2018420659530Open ↗
12/22/2017420659530Open ↗
▸BISDEEP FOUNDATIONS / PILES1
05/27/2021420659530Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
05/27/2021420659530Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/22/2021420659530Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
02/06/2026421486001Open ↗
03/11/2025440434433Open ↗
08/31/2022440403216Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
03/30/2023420659530Open ↗
Showing 1 of 5 on file for this type
▸BISSUPERSEDING LETTER3
10/29/2020420659530Open ↗
07/12/2018420659530Open ↗
03/09/2018420659530Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT9
02/03/2026421486001Open ↗
02/03/2026421486001Open ↗
04/12/2022440664489Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/16/2021420659530Open ↗
10/29/2020420659530Open ↗
06/17/2019420659530Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/10/2025440434433Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/01/2020420659530Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/29/2020420659530Open ↗
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION31
05/01/2023420659530Open ↗
10/13/2021420659530Open ↗
09/27/2021420659530Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
02/10/2021440664489Open ↗
10/29/2020440643056Open ↗
06/10/2019440551591Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
05/08/2018421629811Open ↗
Showing 1 of 8 on file for this type
▸Other Documents19
▸BISBPP - SUPPORTING DOCUMENTATION6
10/28/2020440403109Open ↗
04/14/2020440403109Open ↗
04/14/2020440403109Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
05/07/2021420659530Open ↗
04/02/2019440403109Open ↗
04/02/2019440403109Open ↗
Showing 3 of 5 on file for this type
▸BISTCO - Supporting Documents3
05/07/2021420659530Open ↗
05/07/2021420659530Open ↗
05/07/2021420659530Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q01041763-P2Open ↗
08/20/2026Q01041763-P1Open ↗
08/15/2026Q01041763-I1Open ↗
▸BISPD1 PLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHUTOFF DAMPERS1
05/27/2021420659530Open ↗