← Back
BuildNYC
Two stories - detached, small or mid-size
43-15 164TH STREET
QUEENS · BIN 4122519
💬 Discuss this project
1925Year Built
2.75Stories
A1Building Class
R4-1Zoning
—Gross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 12 docs
Floor 31 filing · 18 docs
Floor 21p · 2 filings · 20 docs
Floor 11 filing · 18 docs
Cellar1p · 2 filings · 20 docs
Site & exterior35p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ehl Development1310/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Celtic Way Consulting709/16/2026
Ameriland Brook205/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ameriland Brook803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fulin Construction NYScaffold107/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506103/26/2026
Building Lifecycle
All (54)Filed (9)Permit Issued (1)Signed Off (1)Violation (3)Objection (10)Special Inspection (30)
09/16/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#Q01368898
Q01368898-S2
09/16/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY. OBTAIN NEW C OF O
Q01378452-S2
09/16/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY. OBTAIN NEW C OF O
Q01378452-S3
09/16/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY. OBTAIN NEW C OF O
Q01378452-S4
09/16/2026
Special inspection requirement — Sprinkler Systems
08/06/2026
Objection resolved — Resolved
07/10/2026
Permit issued — Construction Fence
Q01368898-S2-FN
06/01/2026
Objection resolved — Addressed
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/20/2026
Objection raised — Other
05/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY. OBTAIN NEW C OF O
Q01378452-S1
05/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/23/2026
Special inspection requirement — Protection of exposed foundation insulation
04/23/2026
Special inspection requirement — Metering
04/02/2026
Objection raised — Cost
04/02/2026
Objection raised — Zoning
04/02/2026
Objection raised — Structural
04/02/2026
Objection raised — Zoning
04/02/2026
Objection raised — Zoning
04/02/2026
Objection raised — Admin
03/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY. OBTAIN NEW C OF O
Q01378452-I1
03/26/2026
Special inspection requirement — Ventilation and air distribution system
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/26/2026
Special inspection requirement — Fenestration air leakage
03/26/2026
Special inspection requirement — Air barrier - visual inspection
03/26/2026
Special inspection requirement — Fenestration areas
03/26/2026
Special inspection requirement — Permanent certificate
03/26/2026
Special inspection requirement — Air barrier — testing
03/26/2026
Special inspection requirement — Insulation placement and R values
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/25/2026
Special inspection requirement — Interior lighting power
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Footing and Foundation
03/25/2026
Special inspection requirement — Structural Steel - Details
03/25/2026
Special inspection requirement — Subgrade Inspections
03/25/2026
Special inspection requirement — Masonry
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
03/25/2026
Special inspection requirement — Heating Systems
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/11/2026
Objection raised — Admin
03/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#Q01368898
Q01368898-S2
03/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#Q01368898
Q01368898-S3
03/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#Q01368898
Q01368898-I1
03/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#Q01368898
Q01368898-S1
03/14/1999
Violation issued (ECB, closed)
Quality of Life
03/14/1999
Violation issued (ECB, closed)
Quality of Life
03/14/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offFulin Construction NY07/10/2026
BISPLISSUEDMagnum Plumbing & Heating05/04/1999
BIS—ISSUEDN/A04/20/1999
1 project · most recent 09/16/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/16/2026——Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Water Heater ×3
2 projects · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026——45 heads
03/07/2026——44 heads
2 projects · most recent 09/16/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/16/2026——Storm, Water/Sanitary
03/07/2026——Storm, Water/Sanitary
2 projects · most recent 09/16/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/16/2026——Steel, Concrete, Masonry
03/07/2026Signed-offFulin Construction NY2 scope_items
2 projects · most recent 09/16/2026
Fence
FiledStatusContractorScope
09/16/2026——Fence
03/07/2026Signed-offFulin Construction NYFence
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
09/16/2026Sprinkler Systems—special
06/01/2026Structural Stability – Alterations of existing buildings—special
05/08/2026Subsurface Investigations (Borings/Test Pits)—special
05/08/2026Excavations - Sheeting, Shoring, and Bracing—special
05/08/2026Subsurface Investigations (Borings/Test Pits)—special
04/23/2026Protection of exposed foundation insulation—energy_progress
04/23/2026Metering—energy_progress
03/26/2026Fenestration air leakage—energy_progress
03/26/2026Air barrier — testing —energy_progress
03/26/2026HVAC-R and service water heating system controls—energy_progress
03/26/2026Fenestration and door U-factor and product ratings—energy_progress
03/26/2026Air barrier - visual inspection—energy_progress
03/26/2026Fenestration areas—energy_progress
03/26/2026HVAC-R and service water heating equipment—energy_progress
03/26/2026Permanent certificate—energy_progress
03/26/2026Ventilation and air distribution system—energy_progress
03/26/2026HVAC-R and service water piping design and insulation—energy_progress
03/26/2026Insulation placement and R values—energy_progress
03/25/2026Structural Stability – Alterations of existing buildings—special
03/25/2026Heating Systems—special
03/25/2026Electric vehicle service equipment requirements—energy_progress
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Interior lighting power—energy_progress
03/25/2026Maintenance information—energy_progress
03/25/2026Concrete - Cast-In-Place—special
Latest 25 of 77.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01368898-S2Request digital key ↗
08/17/2026Q01368898-S3Request digital key ↗
08/17/2026Q01368898-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01368898-I1Open ↗
08/16/2026Q01378452-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026Q01378452-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01378452-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/04/2026Q01378452-S3Open ↗
10/04/2026Q01378452-S4Open ↗
08/17/2026Q01368898-S2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
10/04/2026Q01378452-S4Open ↗
08/16/2026Q01378452-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWTR4 Test Report and Plot Diagram3
08/17/2026Q01368898-S1Open ↗
08/16/2026Q01378452-I1Open ↗
08/15/2026Q01378452-S1Open ↗
▸DOB NOWSOIL REPORT3
08/17/2026Q01368898-S1Open ↗
08/16/2026Q01378452-I1Open ↗
08/15/2026Q01378452-S1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/17/2026Q01368898-I1Open ↗
08/16/2026Q01378452-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01378452-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01378452-I1Open ↗