← Back
Three families
43-19 25 AVENUE
QUEENS · Astoria (East)-Woodside (North) · BIN 4011619
💬 Discuss this project
1935Year Built
2Stories
C0Building Class
R5Zoning
1,616 sfGross Floor Area
3Units
1 Open Violation ▸
Three families · 1,650 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
Cellar2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SELF SERVICE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MA ENGINEERING, P.C.306/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA ENGINEERING P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC PLBG & SPRKLR CORPlumbing307/08/2026
Building Lifecycle
All (18)Filed (3)Permit Issued (3)Signed Off (1)Violation (4)Inspection (4)Special Inspection (3)
11/14/2025
Signed off — Alteration
APPLICATION FILING TO REPLACE EXISTING oil BOILER to gas boiler AT CELLAR, and INSTALL WASHER & DRYER AT 2ND FLOOR, AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q00617763-I1
06/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOATEZ ALI
06/11/2025
Filed — Alteration
APPLICATION FILING TO REPLACE EXISTING oil BOILER to gas boiler AT CELLAR, and INSTALL WASHER & DRYER AT 2ND FLOOR, AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q00617763-P2
06/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jay Kavi
05/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/12/2025
Permit issued — Plumbing
Q00617763-I1-PL
05/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2023
Permit issued — Plumbing
Q00617763-I1-PL
09/07/2022
Filed — Alteration
APPLICATION FILING TO REPLACE EXISTING oil BOILER to gas boiler AT CELLAR, and INSTALL WASHER & DRYER AT 2ND FLOOR, AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q00617763-P1
09/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jay Kavi
04/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2021
Permit issued — Plumbing
Q00617763-I1-PL
11/26/2021
Filed — Alteration
APPLICATION FILING TO REPLACE EXISTING oil BOILER to gas boiler AT CELLAR, and INSTALL WASHER & DRYER AT 2ND FLOOR, AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q00617763-I1
07/13/2017
Violation issued (ECB, closed)
Construction
05/16/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2014
Violation issued (ECB, closed)
Construction
10/21/2014
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/12/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS02/09/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS12/06/2021
BISPLISSUEDJOHNNY'S P&H CONTRAC INC10/28/2014
BISOTISSUEDMA ENGINEER CONSULT PC10/28/2014
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/12/2025HVAC-R and service water heating system controlsMOATEZ ALIenergy_progress
06/05/2025HVAC-R and service water heating system controlsJay Kavienergy_progress
09/06/2022HVAC-R and service water heating system controlsJay Kavienergy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00617763-P2Request digital key ↗
08/27/2026Q00617763-I1Request digital key ↗
08/27/2026Q00617763-P1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
11/08/2014421046763Open ↗
11/08/2014421046763Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/08/2014421046763Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00617763-P2Open ↗
08/27/2026Q00617763-P1Open ↗
08/27/2026Q00617763-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q00617763-I1Open ↗
08/26/2026Q00617763-P2Open ↗
08/26/2026Q00617763-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/21/2016421046763Open ↗
11/08/2014421046763Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/08/2014421046763Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/08/2014421046763Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
02/21/2015421046763Open ↗
02/05/2015421046763Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/08/2014421046763Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00617763-P2Open ↗
08/27/2026Q00617763-P1Open ↗
08/27/2026Q00617763-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/08/2014421046763Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/08/2014421046763Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/21/2016421046763Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00617763-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/26/2016421046763Open ↗
05/26/2016421046763Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/20/2016421046763Open ↗
04/21/2016421046763Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/08/2014421046763Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/21/2016421046763Open ↗
11/08/2014421046763Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/08/2014421046763Open ↗