One story retail building
43-24 QUEENS BOULEVARD
QUEENS · BIN 4001993
💬 Discuss this project
1958Year Built
1Stories
K1Building Class
R7AZoning
8,521 sfGross Floor Area
8Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: OK CHAMPS LLC · 9,500 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 9 docs
Floor 21p · 1 filing · 3 docs
Floor 17p · 5 filings · 20 docs
Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OKCHAMPS4507/08/2026
MADE FOR CHICKEN303/22/2026
43-22 QUEENS ST103/22/2026
HENDERSON HOLDING GROUP303/21/2026
DIVERSIFIED MANAGEMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/07/2018$9.9M—HENDERSON HOLDING GROUP LLC → OK CHAMPS LLC$1,162/sf building
01/15/2015$7.3M—— → —$854/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKM ARCHITECTURE PC605/15/2025
DESIGN GROUP IN H&K LLC804/20/2023
ECOPLUSDESIGN303/12/2020
ALLEN SHINFELD, P.E. PLLC112/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEEKODESIGN603/21/2026
DESIGN GROUP IN H K1603/21/2026
ION DESIGN403/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C PLUS DESIGN GROUP INCGeneral Contractor404/09/2026
PETER PLUMBING ASSOC. INC.Fire Protection207/08/2026
SEOUL INTERIOR & BUILD INGeneral Contractor207/08/2026
YOUNG CHOEElectrical103/21/2026
AVON PLBG & HTG INCPlumbing107/08/2026
POWER PLUMBING & HEATINGPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600205/15/2025
JKM ARCHITECTURE P.C.8906107/07/2023
DESIGN GROUP IN H&K LLC1363804/05/2023
ECOPLUSDESIGN2887103/12/2020
Building Lifecycle
All (99)Filed (18)Permit Issued (11)Signed Off (7)Violation (23)Inspection (10)Special Inspection (30)
02/18/2026
Violation issued (FDNY_NOV, closed)
12/03/2025
Signed off — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-I1
09/02/2025
Signed off — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-S1
07/15/2025
Violation issued (FDNY_ORDER, closed)
07/15/2025
Violation issued (FDNY_ORDER, closed)
07/15/2025
Violation issued (FDNY_ORDER, closed)
07/15/2025
Violation issued (FDNY_ORDER, closed)
07/15/2025
Violation issued (FDNY_ORDER, closed)
07/15/2025
Violation issued (FDNY_ORDER, closed)
07/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YOUNGSAM YU
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Min
05/16/2025
Special inspection requirement — Mechanical Systems
John Min
05/16/2025
Special inspection requirement — Final
John Min
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
John Min
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
John Min
05/16/2025
Special inspection requirement — Interior lighting power
YOUNGSAM YU
05/16/2025
Special inspection requirement — Shutoff dampers
YOUNGSAM YU
05/16/2025
Special inspection requirement — Lighting controls
YOUNGSAM YU
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
YOUNGSAM YU
05/15/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-P3
05/15/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-P4
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
YOUNGSAM YU
04/10/2025
Special inspection requirement — Mechanical Systems
Hackjong Choi
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
04/10/2025
Special inspection requirement — Final
Hackjong Choi
04/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
04/10/2025
Special inspection requirement — Lighting controls
Hackjong Choi
04/10/2025
Special inspection requirement — Interior lighting power
Hackjong Choi
04/10/2025
Special inspection requirement — Shutoff dampers
Hackjong Choi
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YOUNGSAM YU
01/24/2025
Permit issued — Mechanical Systems
Q00863169-I1-GC-CX
01/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-P1
01/14/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-P2
12/31/2024
Special inspection requirement — Energy Code Compliance Inspections
YOUNGSAM YU
12/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YOUNGSAM YU
12/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
12/31/2024
Special inspection requirement — Mechanical Systems
Hackjong Choi
12/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
12/31/2024
Special inspection requirement — Final
Hackjong Choi
12/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
12/31/2024
Special inspection requirement — Interior lighting power
Hackjong Choi
12/31/2024
Special inspection requirement — Lighting controls
Hackjong Choi
12/31/2024
Special inspection requirement — Shutoff dampers
Hackjong Choi
07/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2024
Permit issued — Plumbing
Q00863169-S1-PL
11/01/2023
Permit issued — Mechanical Systems
Q00863169-I1-GC-CX
10/20/2023
Permit issued — General Construction
Q00863169-I1-GC-CX
07/12/2023
Permit issued — Mechanical Systems
Q00863169-I1-GC-CX
07/07/2023
Filed — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-I1
07/07/2023
Filed — Alteration
INSTALLATION OF NEW KITCHEN GAS EQUIPMENTS AND NEW PLUMBING FIXTURES IN REAR-KITCHEN.
Q00863169-S1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2023
Signed off — Alteration
RELOCATION OF SPRINKLER HEADS AT CELLAR AND INSTALLATION OF NEW SPRINKLER LINE AND HEADS AT FIRST FLOOR. NO CHANE IN USE, EGRESS, OR OCCUPANCY.
Q00209045-I1
05/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/19/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offC PLUS DESIGN GROUP INC01/24/2025
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC06/27/2024
DOB NOWMechanical SystemsSigned-offC PLUS DESIGN GROUP INC11/01/2023
DOB NOWGeneral ConstructionSigned-offC PLUS DESIGN GROUP INC10/20/2023
DOB NOWMechanical SystemsSigned-offC PLUS DESIGN GROUP INC07/12/2023
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.05/16/2023
DOB NOWPlumbingSigned-offPOWER PLUMBING & HEATING09/01/2022
DOB NOWMechanical SystemsSigned-offSEOUL INTERIOR & BUILD IN08/31/2022
DOB NOWGeneral ConstructionSigned-offSEOUL INTERIOR & BUILD IN12/14/2021
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC03/09/2020
DOB NOWSprinklersSigned-offPETER PLUMBING ASSOC. INC.12/23/2019
BISOTISSUEDSEOUL INTERIOR & BUILD IN08/23/2022
BIS—ISSUEDH&K NY CORP01/24/2020
BISMHISSUEDH&K NY CORP01/08/2020
BISOTISSUEDALMUNIR CORP11/19/2019
BISMHISSUEDH&K NY CORP08/06/2019
BISOTISSUEDE&J ALL SEASONS CONSTRUCT12/16/2015
BISPLISSUEDMARCO POLO PLBG & HTG INC12/16/2015
BISFPISSUEDUNIQUE FIRE SYSTEMS INC08/20/2015
BISEQISSUEDSIN DO CONSTRUCTION INC10/16/2013
BISPLISSUEDCHAMP PLUMBING & HTG CORP02/13/2013
BISFPISSUEDNY FIRE LLC12/19/2012
BISMHISSUEDTIBBS INTERIOR/EXTERIOR I11/13/2012
BIS—ISSUEDUNIVERSAL CONST CONS INC03/25/2008
BISEQISSUEDSHUN AN CONSTRUCTION INC02/15/2006
BISOTISSUEDSHUN AN CONSTRUCTION INC02/15/2006
BISFPISSUEDMASTER FIRE SYSTEMS, INC02/15/2006
BIS—ISSUEDSHUN AN CONSTRUCTION INC02/07/2006
BISPLISSUEDPINNACLE PLBG & HTG CORP01/06/2006
BISMHISSUEDSHUN AN CONSTRUCTION INC12/12/2005
BISEQISSUEDSHUN AN CONSTRUCTION INC12/12/2005
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM12/27/2000
BIS—ISSUEDSPECTRUM SIGNS INC07/08/1999
BISOTISSUEDSPECTRUM SIGNS INC03/26/1998
BISMHISSUEDSUPERIOR AIR COND. & REF. INC06/24/1993
BISOTISSUEDMAZZITELLI CONSTR. CORP08/11/1992
BISEQISSUEDMAZZITELLI CONSTR. CORP08/11/1992
BISPLISSUEDRAYWARD PLG CORP08/31/1990
BISOTISSUEDMC DAN PUB, INC.08/02/1989
BISEQISSUEDMC DAN PUB, INC.08/02/1989
5 projects · most recent 05/01/2025
General Wiring Lighting
FiledStatusContractorScope
05/01/2025Permit IssuedPOWER ELECTRICAL CONTS INGeneral Wiring
09/01/2022CompleteY.S ELECTRICGeneral Wiring, Lighting
12/17/2021CompleteY.S ELECTRICGeneral Wiring
11/10/2019CompleteJONG HYUN KIM—
09/06/2019CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
05/16/2025HVAC-R and service water piping design and insulationYOUNGSAM YUenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsJohn Minspecial
05/16/2025Mechanical SystemsJohn Minspecial
05/16/2025FinalJohn Minprogress
05/16/2025Fire-Resistance Rated ConstructionJohn Minprogress
05/16/2025Energy Code Compliance InspectionsJohn Minprogress
05/16/2025Interior lighting powerYOUNGSAM YUenergy_progress
05/16/2025Shutoff dampersYOUNGSAM YUenergy_progress
05/16/2025Lighting controlsYOUNGSAM YUenergy_progress
05/16/2025Energy Code Compliance InspectionsYOUNGSAM YUprogress
04/10/2025Energy Code Compliance InspectionsYOUNGSAM YUprogress
04/10/2025Mechanical SystemsHackjong Choispecial
04/10/2025Energy Code Compliance InspectionsHackjong Choiprogress
04/10/2025FinalHackjong Choiprogress
04/10/2025Fire-Resistance Rated ConstructionHackjong Choiprogress
04/10/2025Lighting controlsHackjong Choienergy_progress
04/10/2025Interior lighting powerHackjong Choienergy_progress
04/10/2025Shutoff dampersHackjong Choienergy_progress
04/10/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
04/10/2025HVAC-R and service water piping design and insulationYOUNGSAM YUenergy_progress
12/31/2024Energy Code Compliance InspectionsYOUNGSAM YUprogress
12/31/2024HVAC-R and service water piping design and insulationYOUNGSAM YUenergy_progress
12/31/2024Fire-Resistant Penetrations and JointsHackjong Choispecial
12/31/2024Mechanical SystemsHackjong Choispecial
12/31/2024Energy Code Compliance InspectionsHackjong Choiprogress
Latest 25 of 51.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch12
08/26/2026Q00636265-P1Request digital key ↗
08/26/2026Q00636265-I1Request digital key ↗
08/25/2026Q00798870-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/28/2026Q00257703-I1Request digital key ↗
08/24/2026Q08015278-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00209045-I1Request digital key ↗
08/15/2026Q00209045-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/28/2026Q00259381-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION37
08/18/2023402386887Open ↗
05/02/2023421918928Open ↗
04/20/2023421903391Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION17
10/21/2022421903391Open ↗
01/31/2020421793241Open ↗
01/09/2020421918928Open ↗
Showing 3 of 17 on file for this type
▸BISPLACE OF ASSEMBLY2
05/01/2023402386887Open ↗
06/11/2018402386887Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/25/2022421793241Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/24/2022421793241Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/14/2016421186237Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
05/05/2023421793241Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/24/2022421793241Open ↗
▸Seals & Professional Certifications80
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026Q00636265-I1Open ↗
09/01/2026Q00863169-S1Open ↗
09/01/2026Q00863169-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/28/2026Q00257703-I1Open ↗
08/26/2026Q00636265-P1Open ↗
08/26/2026Q00636265-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/31/2020421793241Open ↗
11/22/2019421903391Open ↗
11/04/2019421903391Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q00798912-P2Open ↗
09/02/2026Q00636265-I1Open ↗
09/02/2026Q00636265-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/04/2019421903391Open ↗
06/12/2019421918928Open ↗
08/14/2015421199688Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
11/04/2019421903391Open ↗
06/12/2019421918928Open ↗
08/14/2015421199688Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/16/2013440108884Open ↗
▸Trade Schedules & Equipment31
▸BISEQUIPMENT USE APPLICATION-PERMIT10
01/28/2014440108884Open ↗
01/28/2014440108884Open ↗
01/28/2014440108884Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
03/12/2020421918928Open ↗
03/09/2020421918928Open ↗
11/27/2019421918928Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS7
01/28/2014440108884Open ↗
01/28/2014440108884Open ↗
01/28/2014440108884Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING2
06/24/2020421918928Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/03/2023421918928Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
03/07/2016421199688Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/29/2013420792360Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/03/2023421918928Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
01/14/2020421793241Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos33
▸DOB NOWOER: Notice to Proceed10
08/25/2026Q00798870-I1Open ↗
08/13/2026Q00798912-I1Open ↗
08/13/2026Q00259381-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026Q00863169-P3Open ↗
08/20/2026Q00863169-P2Open ↗
08/20/2026Q00863169-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/04/2019421903391Open ↗
08/08/2019421918928Open ↗
07/20/2015421186237Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026Q00636265-I1Open ↗
08/13/2026Q00863169-S1Open ↗
08/13/2026Q00863169-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
11/14/2019421903391Open ↗
08/03/2019421918928Open ↗
10/05/2015421186237Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
04/19/2023421903391Open ↗
10/25/2022421918928Open ↗
10/24/2022421793241Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026Q00798870-I1Open ↗
08/13/2026Q00798912-I1Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
11/04/2019421903391Open ↗
11/04/2019421903391Open ↗
09/18/2019421918928Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/14/2016421186237Open ↗
02/03/2014440108884Open ↗
Showing 2 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/27/2023421903391Open ↗
11/07/2022421918928Open ↗
▸BISINTERIOR LIGHTING POWER1
05/03/2023421918928Open ↗
▸BISEMERGENCY LIGHTING - PA1
05/05/2023421793241Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/27/2023421903391Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/03/2023421918928Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/16/2013440108884Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/25/2026Q00798870-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/09/2023402386887Open ↗
10/04/2022421793241Open ↗
10/16/2013440108884Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/27/2023421903391Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/26/2022421918928Open ↗
▸BISMECHANICAL SYSTEMS1
05/03/2023421918928Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/26/2022421918928Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/04/2015421186237Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
05/04/2023421918928Open ↗
04/28/2023421903391Open ↗
05/07/2018402284693Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/21/2022421903391Open ↗
12/30/2019421793241Open ↗
12/30/2019421793241Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/25/2020421793241Open ↗
12/27/2019421793241Open ↗
08/19/2019421793241Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
08/14/2015421199688Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
05/03/2023421918928Open ↗
04/27/2023421903391Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT14
02/06/2020421918928Open ↗
11/04/2019421903391Open ↗
08/19/2019421793241Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/21/2023421903391Open ↗
10/25/2022421793241Open ↗
10/25/2022421918928Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION12
05/30/2023402386887Open ↗
05/02/2023421918928Open ↗
04/20/2023421903391Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET7
11/04/2019421903391Open ↗
08/19/2019421793241Open ↗
06/12/2019421918928Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
10/30/2019421918928Open ↗
09/18/2019421918928Open ↗
10/13/2017402284693Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2013440108884Open ↗
▸Other Documents3
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
04/18/2013420792360Open ↗
03/29/2013420792360Open ↗
▸BISPLOT DIAGRAM1
12/30/2019421793241Open ↗