← Back
Elevator apt, semi-fireproof with stores
J Tower 52
43-25 52ND STREET · BIN 4625828
💬 Discuss this project
2024Year Built
9Stories
D7Building Class
R7AZoning
54,383 sfGross Floor Area
61Units
0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 43-25 52 LLC · 9,000 sf lot · 6.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Floor 259p · 1 filing · 20 docs
Floor 161p · 1 filing · 20 docs
Cellar61p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHERN STAR MANAGEMENT2604/09/2026
BLUE SHINE BULDERS INC.203/22/2026
B CONTRACTORS GROUP203/22/2026
OWNER'S REP203/21/2026
43-25 52 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2022$3.2M—Private party → 43-25 52 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANGELO NG + ANTHONY NG ARCHITECTS3203/21/2026
ADVANCED BUILDERS SERVICES503/21/2026
THE GREEN STUDIO403/21/2026
MILLENNIUM DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTHONY K NGElectrical103/21/2026
INNOVATIVE CONSTR NYC LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAND INSPECTION & CONSUL67922207/24/2026
Building Lifecycle
All (157)Filed (29)Permit Issued (1)Signed Off (14)Violation (2)Inspection (1)Objection (80)Special Inspection (30)
08/18/2026
Special inspection requirement — Insulation placement and R values
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Lighting in dwelling units
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Metering
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Electrical motors and elevators
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Fenestration air leakage
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Protection of exposed foundation insulation
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Maintenance information
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Air barrier - visual inspection
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Exterior lighting power
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Fenestration areas
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Lighting controls
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Vestibules
RUWAN RAJAPAKSE
08/18/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
08/18/2026
Special inspection requirement — Interior lighting power
RUWAN RAJAPAKSE
07/24/2026
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-A3
07/24/2026
Objection raised — Other
07/24/2026
Objection resolved — Resolved
07/21/2026
Special inspection requirement — Vestibules
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Maintenance information
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Electrical motors and elevators
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Metering
RUWAN RAJAPAKSE
07/21/2026
Special inspection requirement — Protection of exposed foundation insulation
RUWAN RAJAPAKSE
05/14/2026
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-A2
02/25/2026
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-Z2
02/02/2026
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-A1
01/21/2026
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S9
01/21/2026
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S2
01/21/2026
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S4
01/21/2026
Signed off — Alteration
Q00730250-I1
01/21/2026
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S5
12/17/2025
Permit issued — General Construction
Q00711760-I1-GC
11/05/2025
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S6
10/09/2025
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-Z1
09/15/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P5
09/08/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P9
08/28/2025
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S1
08/18/2025
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S7
08/15/2025
Signed off — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-S8
08/07/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P6
08/07/2025
Objection resolved — Addressed
08/06/2025
Objection raised — Admin
08/05/2025
Signed off — Alteration
Q00739310-I1
08/04/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P8
08/04/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P7
07/23/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P4
07/23/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P3
06/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2025
Filed — New Building
FILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION Q00711760
Q00711760-P2
04/21/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00929908-I1
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC12/17/2025
1 project · most recent 07/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026Permit IssuedINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXSQ24TBVJUB 24,000 BTU · Split System ×128
RXF12AXVJU 10,800 BTU · Split System ×2
RXTQ36TBVJUB 34,200 BTU · Vrf Outdoor ×2
RXTQ48TBVJUB 45,500 BTU · Vrf Outdoor ×2
Lg ARUM168BTE5 168,000 BTU · Vrf Outdoor ×4
Ventilation
Rupp Air CFA-D90-RA 70 CFM ×6
DU85HRA 1,600 CFM · Exhaust Fan ×6
RA-SIF9DD 200 CFM ×6
RABI11DD-RM 1,125 CFM · Exhaust Fan ×6
DU33HRA 725 CFM · Exhaust Fan ×4
DFA-150-RA 130 CFM ×2
DU10HRA 150 CFM · Exhaust Fan ×2
DU12HRA 400 CFM · Exhaust Fan ×2
RA-RE1100DD 200 CFM ×2
RA-RE1300DD 200 CFM ×2
RA-SIF11DD 290 CFM ×2
RA-SIF18DD 3,280 CFM · Exhaust Fan ×2
1 project · most recent 07/24/2026
Sprinkler System
FiledStatusContractorScope
07/24/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 project · most recent 07/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/24/2026Signed-offTARGET PIPING NY LLCStorm, Water/Sanitary
5 projects · most recent 05/11/2025
General Wiring
FiledStatusContractorScope
05/11/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
08/08/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
07/22/2024CompleteNASH ELECTRIC SERVICES IN—
01/11/2024CompleteHIVOLTS ELECTRICAL INC—
09/07/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 07/24/2026
Concrete
FiledStatusContractorScope
07/24/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConcrete
1 project · most recent 07/24/2026
Fence
FiledStatusContractorScope
07/24/2026Permit IssuedINNOVATIVE CONSTR NYC LLCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
08/18/2026Interior lighting powerRUWAN RAJAPAKSEenergy_progress
08/18/2026Lighting in dwelling unitsRUWAN RAJAPAKSEenergy_progress
08/18/2026Protection of exposed foundation insulationRUWAN RAJAPAKSEenergy_progress
08/18/2026Fenestration air leakageRUWAN RAJAPAKSEenergy_progress
08/18/2026Insulation placement and R valuesRUWAN RAJAPAKSEenergy_progress
08/18/2026Electrical motors and elevatorsRUWAN RAJAPAKSEenergy_progress
08/18/2026Exterior lighting powerRUWAN RAJAPAKSEenergy_progress
08/18/2026Air barrier - visual inspectionRUWAN RAJAPAKSEenergy_progress
08/18/2026MeteringRUWAN RAJAPAKSEenergy_progress
08/18/2026Maintenance informationRUWAN RAJAPAKSEenergy_progress
08/18/2026Fenestration and door U-factor and product ratingsRUWAN RAJAPAKSEenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
08/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRUWAN RAJAPAKSEspecial
08/18/2026Wall Panels, Curtain Walls, and VeneersRUWAN RAJAPAKSEspecial
08/18/2026Fire-Resistance Rated ConstructionRUWAN RAJAPAKSEprogress
08/18/2026Energy Code Compliance InspectionsRUWAN RAJAPAKSEprogress
08/18/2026Fenestration areasRUWAN RAJAPAKSEenergy_progress
08/18/2026Lighting controlsRUWAN RAJAPAKSEenergy_progress
08/18/2026VestibulesRUWAN RAJAPAKSEenergy_progress
08/18/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
07/21/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
07/21/2026MeteringRUWAN RAJAPAKSEenergy_progress
07/21/2026Fire-Resistance Rated ConstructionRUWAN RAJAPAKSEprogress
07/21/2026Energy Code Compliance InspectionsRUWAN RAJAPAKSEprogress
07/21/2026Wall Panels, Curtain Walls, and VeneersRUWAN RAJAPAKSEspecial
Latest 25 of 102.
▾Documents — 246 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
08/26/2026Q00730250-I1Request digital key ↗
08/26/2026Q00739310-I1Request digital key ↗
08/24/2026Q00929908-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits9
▸DOB NOWHPD - Permit Notice5
08/19/2026Q00711760-I1Open ↗
08/16/2026Q00711760-I1Open ↗
08/16/2026Q00711760-A2Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/13/2025440713523Open ↗
06/27/2023440713523Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/02/2022440713523Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
02/19/2026440713523Open ↗
▸Zoning, Tax Lot & Property Records31
▸DOB NOWZoning Exhibit form (1-5)11
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram11
08/16/2026Q00711760-A1Open ↗
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/16/2026Q00711760-I1Open ↗
08/16/2026Q00711760-A2Open ↗
08/16/2026Q00711760-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 24
08/16/2026Q00711760-I1Open ↗
08/16/2026Q00711760-A2Open ↗
08/16/2026Q00711760-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q00711760-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/26/2026Q00730250-I1Open ↗
08/26/2026Q00739310-I1Open ↗
08/24/2026Q00929908-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026Q00711760-P5Open ↗
09/02/2026Q00711760-P5Open ↗
09/01/2026Q00711760-S9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026Q00711760-P5Open ↗
09/01/2026Q00711760-S9Open ↗
08/31/2026Q00711760-I1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/02/2022440713523Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/02/2022440713523Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P2Open ↗
08/16/2026Q00711760-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026Q00711760-I1—
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist7
08/16/2026Q00711760-A1Open ↗
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P2Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREES SITE PLAN1
02/13/2026440713523Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/27/2023440713523Open ↗
▸BISSTREET TREE CHECKLIST1
03/13/2025440713523Open ↗
▸BISSTREET TREE SIGNOFF1
02/13/2026440713523Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026Q00711760-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/16/2026Q00711760-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026Q00711760-I1Open ↗
▸Environmental & Asbestos40
▸DOB NOWOER: Notice to Proceed21
08/19/2026Q00711760-I1Open ↗
08/16/2026Q00711760-Z2Open ↗
08/16/2026Q00711760-Z2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWOER: Notice of Satisfaction17
08/19/2026Q00711760-I1Open ↗
08/16/2026Q00711760-Z2Open ↗
08/16/2026Q00711760-Z2Open ↗
Showing 3 of 17 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
02/13/2026440713523Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/13/2025440713523Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/16/2026Q00711760-S5Open ↗
08/16/2026Q00711760-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/16/2026Q00711760-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/19/2026440713523Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
02/19/2026440713523Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/13/2025440713523Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/02/2022440713523Open ↗
▸Other Documents40
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone12
08/19/2026Q00711760-I1Open ↗
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProperty Ownership Certification9
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial6
08/16/2026Q00711760-A1Open ↗
08/16/2026Q00711760-P3Open ↗
08/16/2026Q00711760-P2Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION5
02/19/2026440713523Open ↗
02/19/2026440713523Open ↗
02/19/2026440713523Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/16/2026Q00711760-S2Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWHPD - Completion Notice2
08/19/2026Q00711760-I1Open ↗
08/16/2026Q00711760-I1Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/19/2026440713523Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/13/2025440713523Open ↗
▸DOB NOWFinal Survey1
08/16/2026Q00711760-I1Open ↗